Loading...
HomeMy WebLinkAboutblower doorEnvelope Leakage Test Report (Blower Door Test) Residential Prescriptive, Performance or ERI Method Compliance 2017 Florida Building Code, Energy Conservation, 6th Edition jurisdiction: Builder; Address: City: ll�GN,, rL Community: W Permit #: Unit: l 1 L�t Lot: 3` State: �---1._. Zip: a )� �I PRESCRIPTIVE MturiuD-The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour at a pressure of 0.2 inch w.g. (50 pascals) in Climate Zones 1 and2. PR��RCUTAIVC arltl IVII:THOO -the building or dwelling,unit shall be tested and verified as having an air leakage rate of not exceeding the selected ACH(50) value, as shown on FORM R405-2017 (Performance) or R40&2017 (ERI), section labeled as Infiltration, sub -section ACH. ACH(50) specified on Form R405�2017-Energy Calc (Performance) or R406"2017 (ER& CFM(50) EZP*A4SS Building Volume ACH(50) ❑FAIL When ACH(50) is less than 3, Mechanical Ventilation installation must be verified by building department, e aRetrieved from architectural plans Code software calculated a OField measured and calculated Testing. Testing shall be conducted in accordance with ANSI/RESN�T/ICC 380 and reportod at a pressure or 0.2 inche w.g. (50 Pascals}, Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues, or individuals licensed as set forth in Section 4890105(3)(f); (g), or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and prov'ded'to the Cade official, Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing; 1.Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures. 2.Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3.lnterior doors, if installed at the time of the test, shall be open. 4,Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed,' S.Heating and cooling systems, if installed at the time of the test, shall be turned off. 6.5upply and return registers, if installed at the time of the test, shall be fully open. Company Name: J� I hereby verify that the above Air Leak Conservation requirements according Signature of Tester: Printed Name of Tester; e results are in accordance with the 2017 6th Edition Florida Building Code Energy I the compliance method selected above. Date of Test: t � License/Certification #: Issuing Authority: