Loading...
HomeMy WebLinkAboutProject info i 30' Concrete must be a minimum of off 5' from your left property lot line. I, Sean Minix owner of the Road 24' lectric Box Runner Travel Resort give permission to install concrete on P-23 with the requirements listed above and have From elegy. prepared thi lot plan. pad to road in front O Sewer to to be 1/2' lower than Sean Mini ct(ber 5, 2020 finished grade for slope Scale 1 — 10 70' 6' New 22' x 63' concrete North 4= driveway 63' 2' CYNTHIA BAKER MY COMMISSION#GG366608 EXPIRES:August 18,2023 Sf)-D Road in front of P-23