HomeMy WebLinkAboutProject info i
30'
Concrete must be a minimum of off
5' from your left property lot line.
I, Sean Minix owner of the Road 24' lectric Box
Runner Travel Resort give permission
to install concrete on P-23 with the
requirements listed above and have From elegy.
prepared thi lot plan. pad to road
in front
O Sewer to
to be 1/2'
lower than
Sean Mini ct(ber 5, 2020 finished
grade for
slope
Scale 1 — 10
70' 6' New
22' x 63'
concrete
North 4=
driveway
63'
2'
CYNTHIA BAKER
MY COMMISSION#GG366608
EXPIRES:August 18,2023
Sf)-D Road in front of P-23