Loading...
HomeMy WebLinkAboutsoil compactionHeadquarters TP C4'1 S ENGINEERING Mailing 11345 U.S. Highway 1 PO Box 78-1377 Sebastian, FL.32958 A%LJi� AND TESTING Sebastian, FL.58 32978 Orlando -0712 Phone: 772-589-0712 723 Progress Way SOIL COMPACTION REPORT C.A.# 5693 Sanford, FL. 32771 ASTM D 1557 and ASTM D 6938 KSMengineering.net DATE TESTED: October 6, 2020 KSM JOB #: 204949-1d/CF/jo PERMIT #: 2007-0719 NUC # 234 CONTRACTOR: Wynne Development Nuc Model: MC -DR JOB LOCATION: 6 Sierra Del Norte Nuc Serial #: MD60308234 Country Club Village Fort Pierce, Florida ITEM TESTED: Compacted Foundation Fill TEST LOCATION PEN DRY MAX. DRY PERCENT DEPTH OF SAMPLE READ DENSITY PROCTOR VALUE (P.C.F) COMPACTION 1. S.E. 0" - 12" 40 107.1 110.7 96.7% 2. S.W. 40 109.8 99.2% 3. Center 40 109.5 98.9% 4. N.W. 40 107.8 97.4% 5. N.E. IF 40 106.7 96.4% Soil Description: Brown Sand In Place Moisture: 10.2% Proctor Optimum Moisture: 12.0% Proctor Max. Dry Density: P.C.F. 110.7 @ Test Locations the Density & Penetrometer readings indicate the Degree of Compaction Meets Minimum Requirement for Staked Foundation RespeFtfu tl y 5d bm fitted: No. 81439 �Q. •• STATE OF . (Ar ,a,.�...,,...vo,. onto '���Sis��NAI. ENS``• Bryan E. Dahl e, P.E. V.P. of Engineering PE # 81439 10/7/2020 Email to: St Lucie Building Department W E I G H T P C F D R y Digitally signed by Bryan E Dahlke Date: 2020.10.07 10:37:44 I I I I I 12 13 14 15 Moisture - % of Dry Weight Disclaimer: Contractor is responsible to maintain the tested area in the condition that KSM completed the indicated passed compaction test. KSM is not responsible if the tested area has been altered from the approved inspected condition. Proudly Serving Florida since 1990