Loading...
HomeMy WebLinkAboutTermite Spray From fax5616880909 1.161.688.0909 Wed Oct 14 12:00:20 2020 MDT Page 1 of 1 w y St Lucie County Inspections r s .mac 2300 Virginia Avenue Ft Pierce,FL 34982 . : (722)462-2172 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT# CO3—M(Og JOB ADDRESS 2982 Bent Pine Dr,Fort Pierce,FL 34951-2924 BUILDER GHO Homes PEST CONTROL CONTRACTOR HomeTeam Pest Defense,Inc. PEST CONTROL LICENSE# JF0001886 We,the undersigned,hereby certify that we have pretreated the above-described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: 220 Chemicals used: Sentricon Always Active HD bait system Percentage of solution: .50% Total gallons used: Date of treatment: 10/15/20 Time of treatment: AM FBC104.2.6 C&Wflcate of Protective Treatment for prevention of termites A weather resistant jobsite posting board shall be provided to receive ®Footing duplicate Treatment Cert fcates as each required protective treatment is ® 1 st Treatment completed,providing a copy for the person the poermit is iisued to and another copy`for the building permit files. The 7Yeatment Cerf cafe shall ❑Re-treat provide the product used,identity of the applicator,time and date of the ❑ Slab treatment,site location,area treated,chemical used,percent concentration and number ofgallons used,to establish a verifiable record of protective ❑1st Treatment treatment. If the soil chemical barrier method for termite prevention is used, ❑Re-treat final exterior treatment shall be completed prior to final building approval. ❑Driveway St Lucie County requires for the final inspection for CO,a Permanent ❑ 1 st Treatment Sticker to be placed on the electrical panel box cover,listing all the ❑Re-treat treatments and dates of applications. ❑Pools ❑1st Treatment ❑Re-treat Signature of exterminator ❑Other ❑1st Treatment ❑Re-treat ®Perimeter for Final Inspection NOTE.There must be a completed form for each required treatment or re-treatment and this form must be on the job site to be picked up by the inspector at tine of each inspection or the scheduled inspection will fail and a re-inspection fee charged.