/ RECEIVED _
BENCHMARK ENGINEERING
JAN 2 9 2018
OF THE TREASURE COAST ST. Lucie County, Permitting
806 DELAWARE AVE.
FT.PIERCE,FL.34950
Py (772)772-267-1399
01/19/18
To: ST. LUCIE COUNTY
BUILDING. DEPT. -
PERMIT: #SLC-1707-0389
OWNER: MIKE OOSTDYK
1803 HAZELWOOD DR.
FT. PIERCE, FL.
RE: INSPECTION FOR HELICAL PIER INSTALLATION
WITH TRU-LIFT BRACKETS & WELDS PER PLAN
LOCATED @ ABOVE ADDRESS
CERTIFICATION
Gentlemen,
I have observed the installation and the completion of (9) helical piers
placed according to the approved plans for this job. In addition (2) more
were added for better stability. Each pier developed approximately 22 kips
which exceeds the design values. The "Tru-Lift" brackets & welds were
installed per the manufacturer's specifications.
I hereby certify that this installation meets or exceeds the design values of
the structural design and the current 2017 FBC (6t" EDITION) and ASCE 7-
10. The work done is in substantial accordance with the plans and
specifications as submitted. In addition, the finished product appears to
have been don i a good workmanship like manner.
G. H U Thy//
Certif, �b- .,-\�eNSF
, oma
o 7o 78 2
: ate
� OF ,
BOWS •HU CHI dW, E—E.
- FLORA . C�
I N Al-
f •
BENCHMARK ENGINEERING RECYVED
OF THE TREASURE COAST SAN 9 �.,118
806 DELAWARE AVE. ST. Lucie County, Permitting
FT.PIERCE,FL.34950
(772)772-267-1399
01/19/18
To: ST: LUCIE COUNTY
BUILDING DEPT.
PERMIT: #SLC-1707-0389
OWNER: MIKE OOSTDYK
1803 HAZELWOOD DR.
FT. PIERCE, FL.
RE: INSPECTION FOR HELICAL PIER INSTALLATION
WITH TRU-LIFT BRACKETS & WELDS PER PLAN
LOCATED @ ABOVE ADDRESS
CERTIFICATION
Gentlemen,
I have observed the installation and the completion of(9) helical piers
placed according to the approved plans for this job. In addition (2) more
were added for better stability. Each pier developed approximately 22 kips
which exceeds the design values. The "Tru-Lift" brackets & welds were
installed per the manufacturer's specifications.
I hereby certify that this installation meets or exceeds the design values of
the structural design and the current 2017 FBC (6th EDITION) and ASCE 7-
10. The work done is in substantial accordance with the plans and
specifications as submitted. In addition, the finished product appears to
have been done in a good workmanship like manner.