HomeMy WebLinkAboutTermite Cert COUNTY
D
2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATM NT
PERMIT #: -1_0 �g d0_q ADDRESS:
BUILDER/CONTRACTOR:
PEST CONTROL CONTRACTOR: W l filkilf
PEST CONTROL LICENSE #:
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated: Chemicals used: &V—
Percentage
of solution: : D Total gallons used: i 0
Date of Treatment: Time of Treatment:
Footing t�1�
1st Treatmentt
Re-Treat Re-Treat
Driveway Pools
1 Treatment 1�Treatment
Re-Treat Re-Treat
Other Pe 'meter for.Final Inspecction
1st Treatment
Re-Treat 7," I'l,
ignature of Exterminator
Note. There must be a completed form for each required treatment orre-tnsatment and this form must be on the job
site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re-inspection
fee charged,
FBC104.2.6 Certificate of Protective Treatment forpr`evei on of termites A weather reskiantjobske pasting board
shall be provided to receive duplicate Treatment Certificates a9 each required protective treatment is completed,
providing a copy for the person the permit is issued to and another copy for the building permit files The Treatment
Certificate shallprovide Me product used, identity of the applicator, time and date of the treatment,site location,area
treated,chemical used,percent concentration and number of gallons used, to establish a verifiable record of
protective treatment If the soil chemical barrier method for tennite prevention is used,final exterior treatment shall
be completed prior to final building approval.
St Lucie County requires for the final inspection for CO,a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of aDplications.