HomeMy WebLinkAboutElectrical plans 1714h.1- -11hk
d�vaxs
jar, 4
02
0
0 wa3
0 0 ai
a:
ul Z
02:
ot-
wo— a,z
0
U3
zwo
m
N D m 0 W0C,1EL�-w45 a
w w
W'
:D
Lu 20
Optional Load Calculation
Heat Larger Than Air
SF x 3VA Living only 915
(2)Small appliance ckts @ 1500VA each = 3000
Refrigerator @ 1500
Refrigerator @ 1500
Freezer @ 1500
Washing Machine @:C500 1500
Dishwasher @ 1500 1564
Disposal @ 1500 1500
Mini Sewer @ 1500
Clothes Dryer @ 5000 Ske—g—
Range @ 12000 Src,�6
Water heater @ 4500 s
Fixed microwave @ ISOO
Vacuum @ 1500
Trash Compactor @ ISOO
Pool Heater @'name plate'
Spa @'narne plate
Motors 746VA per HP'P60 1119
Garage Door Opener
i) Total •
2) First 10 KVA of general load @ 100%
3) Subtract line 2 from I
19
4) Multiply line 2 @ 40% 4 9910,
s) Add lines 2 and 4 S,S
6) 60/50amp, breaker for heat (10000) 16606
7) 40/30amp, breaker for heat (5000) Lg&c—�-ske�
8) Total heat-Add lines 6 and 7 11)060
9) Multiply line 8 @ 65%
10)Add lines 5 and 9 Du_ 9 L/9 (Generator Size Needed)
11)Divide line 10 by 240 ?37, 2-2 (Breaker Size Needed)
Summary:
Line 10 is the total KW ST.LUCIE COUNTY
Line 11 Is the total Amps BUILDING DIVISION
REVIEWED
FOR COM AId
REVIEW4�By
DATE — .2—
PLANS AND PE MIT
MUST BE KEPT ON JOB OR
NO INSPECTION WILL BE MADE