Loading...
HomeMy WebLinkAboutTermite cert I I i I Planning &Development Services Building &Code Regulation Division 2300 Virginia Acre gig& e Dort Pierce, FL 34982 772-462-2172 Fax 772-463-6443 I i CERTZKCATE OF TERMITE TREATMENT CONSTRUCTION➢ SOIL TREATMENT PERMIT- #: JOB ADDR SS: BUILDER/CONTRACTOR: P,-,, PEST CONTROL CONTRACTOR: EV T-A-BUG TERMITE&PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. I Square feet if area treated: Chemicals used: BASELINE Percentage of solution: .06% Total gallons used: Date of Treatment: � - 1 ! Time of Treatment: - ••�1 I Footing Slab 15t Treatment Treatment Re-Treat Re-Treat Driveway Pools 1st Treatment 1st Treatment Re-Treat Re-Treat Other Perinfinter for Final Inspection 1st Treatment )>� Re-Treat Signature of Ext Date (Vote: There must be a completed form for each requ/red treatment or -tre and th/s ,form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fall and a re-Inspection fee charged, j FBC104.2.6 Certificate of Protective Treatment for prevention of termites A weather resistant jobsite posting board shall be provided to receive dupllcate Treatment Certificates as each required protective treatment Is completed, providing a copy for the person the permit is Issued to and another copy for the building permit files The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment,site location, area treated, chemical used,percent concentration and number ofgallons used, to establish a verJFable record of protective treatment. if the soil chemical barrier method for termite prevention is used,final exterior treatment shall be completed prior to final building approval. St(Lucia Country requires fbr the final inspection for CO, a Permanent Stickeir to be placed on the electrical panel box cover, listing all the treatments and dates of appi0ci tions. Revised 7/24/2014 ! I I Planning &Development Services Building &Code Regulation Division • Will 2300 Virginia Ave a Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT } PERMIT #:j101 `63 7 Z JOB ADDRESS: / ✓�� �T� ��� j `����' BUILDER/CONTRACTOR: KbAmV4 H Q'i,l PEST CONTROL CONTRACTOR: EVICT-A-BUG TERMITE&PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: 2' S0 L/F Chemicals used: DOMINION 2L Percentage of solution: .05% Total gallons used: Date of Treatment_: Z i I _--Time of-Treatment:- —Z -- -—- - Footing Slab 1st Treatment 1st Treatment Re-Treat Re-Treat Driveway Pools 15t Treatment 1st Treatment -RoyTreat Re-Treat 1p�,__Othera�'c s P rimeter for Final Inspection moist Treatment Re-Treat FA, )!7 Si ature of ExterZat Date Note: There must be a completed form for each required treatment or re-treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re-inspection fee charged. FBC104.2.6 Certificate of Protective Treatment for prevention of termites A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, pro viding a copy for the person the permit is issued to and another copy for the building permit files The Treatment Certificate shallprovIde the product used, identity of the applicator, time and date of the treatment,site location, area treated, chemical used,percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014