Loading...
HomeMy WebLinkAboutTermite cert S I r Planning &Development Services Building &Code Regulation Division 2300 Virginia Ave • Fort Plarce, FL 34982 772-462-2172 Fax 772-462-6"3 CERTURC ATE OF TERMITE TREATMENT PERMIT #: 1` 1- OM I JOB ADDRESS: -!3 _17PAN64 L'JA �01� Fly BUILDER/CONTRACTOR; /J '- PEST CONTROL CONTRACTOR: VICT-A-BUG TERMITE&PEST CONTROL INC. PEST CONTROL LICENSE #:J8175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance Cwith � the standards of the National Pest Control Association. Square feet if area treated: ?—C/c'" /1~ Chemicals used: QOMINION2L g 05% 7 I Percentage of solution; Total gallons used: ��`� Date of Treatment: l 0`"�`C �� Time of Treatment: _.-L O d I Footing Slab ist Treatment 15t Treatment ! Re-Treat Re-Treat Driveway Pools Ist Treatment .a t Re-Treat ,�'' Re-Treat Other Perim a for Final i 1st Treatment Re-Treat Signatur -o E na or Date Note: There must be a completed form for each required treatment or e-treatment and this form must be on the jqb site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re inspection fee charged. I FOC104.2.6 Certificate of Protective Treatment for prevention of termites A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment Is completed, providing a copy for the person the permit is Issued to and another copy for the building permit files The Treatment Certificate shall provide the product used,Identity of the applicator, time and date of the treatment,site location, area treated, chemical used,percent concentration and number of gallons used, to establish a verlflable record of protective treatment. If the soil chemical barrier method for termite prevention is used,final exterior treatment shall be completed prior to final building approval, St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed onj the electrical! panel @you cover, listing all the treatments and dates of applications. Revised 7/24/2014 l I