Loading...
HomeMy WebLinkAboutin progress mobile home repair i I _ y FROM: STEVEN G. WOOD, P.E. DECEMBER 29, 2016 FL PROFESSIONAL ENGINEER NO. 34398 950 SULTAN DR PORT ST LUCIE, FL 34953 (772)-878-7324 j I TO: ST LUCIE COUNTY BUILDING DEPARTMENT FORT PIERCE, FL I SUBJECT: 'AS BUILT AND 'IN PROGRESS' MOBILE HOME REPAIR REF: MOBILE HOME LOCATED Cam: 5 CASA RIO ROAD SPANISH LAKES ONE MHP PORT ST LUCIE, FL THE PURPOSE OF THIS LETTER IS TO CERTIFY THE 'AS BUILT AND 'IN PROGRESS' REPAIRS AT THE MOBILE HOME LOCATED AT THE ABOVE REFERENCED ADDRESS. THIS ENGINEER PERFORMED AN ON SITE INSPECTION OF THE REFERENCED MOBILE HOME ON 12/10/2016. BASED ON THE INSPECTION, PHOTOS AND DISCUSSIONS WITH THE WYNNE BLDG CORP REPRESENTATIVE A SKETCH WAS DRAWN WHICH DOCUMENTS THE DETAILS OF THE REPAIRS. SEE ATTACHED SKETCH FOR THE REPAIR DETAILS. BASED ON THE INSPECTION, PHOTOS, REVIEW OF THE SKETCH AND DISCUSSIONS i WITH THE WYNNE BLDG REPRESENTATIVE, THE FOLLOWING FINDINGS WERE MADE FOR THIS SITE SPECIFIC CIRCUMSTANCE: • THE'AS BUILT AND 'IN PROGRESS' REPAIRS WERE FOUND TO BE CONSTRUCTED IN A MANNER THAT MEETS OR EXCEEDS THE ORIGINAL MOBILE HOME CONSTRUCTION FOR A WIND ZONE II APPLICATION AND IS THEREFORE ACCEPTABLE AS IS. Alac; _ old 0 ST.LUC!l'COUNTY BUMPING DIVISION REVIINN ED FOB C LIANCE REVIVI ED Y DATE I7 PLANS Al\T PERINUT MUST BE KEPT ON JGE On NO LOSPECTION 1N iI.L EE mAnu,:. i I I