HomeMy WebLinkAboutin progress mobile home repair i
I
_ y
FROM: STEVEN G. WOOD, P.E. DECEMBER 29, 2016
FL PROFESSIONAL ENGINEER NO. 34398
950 SULTAN DR
PORT ST LUCIE, FL 34953
(772)-878-7324 j
I
TO: ST LUCIE COUNTY BUILDING DEPARTMENT
FORT PIERCE, FL
I
SUBJECT: 'AS BUILT AND 'IN PROGRESS' MOBILE HOME REPAIR
REF: MOBILE HOME LOCATED Cam:
5 CASA RIO ROAD
SPANISH LAKES ONE MHP
PORT ST LUCIE, FL
THE PURPOSE OF THIS LETTER IS TO CERTIFY THE 'AS BUILT AND 'IN PROGRESS'
REPAIRS AT THE MOBILE HOME LOCATED AT THE ABOVE REFERENCED ADDRESS.
THIS ENGINEER PERFORMED AN ON SITE INSPECTION OF THE REFERENCED MOBILE
HOME ON 12/10/2016. BASED ON THE INSPECTION, PHOTOS AND DISCUSSIONS WITH
THE WYNNE BLDG CORP REPRESENTATIVE A SKETCH WAS DRAWN WHICH DOCUMENTS
THE DETAILS OF THE REPAIRS.
SEE ATTACHED SKETCH FOR THE REPAIR DETAILS.
BASED ON THE INSPECTION, PHOTOS, REVIEW OF THE SKETCH AND DISCUSSIONS
i
WITH THE WYNNE BLDG REPRESENTATIVE, THE FOLLOWING FINDINGS WERE MADE
FOR THIS SITE SPECIFIC CIRCUMSTANCE:
• THE'AS BUILT AND 'IN PROGRESS' REPAIRS WERE FOUND TO BE
CONSTRUCTED IN A MANNER THAT MEETS OR EXCEEDS THE ORIGINAL
MOBILE HOME CONSTRUCTION FOR A WIND ZONE II APPLICATION AND IS
THEREFORE ACCEPTABLE AS IS.
Alac; _ old 0
ST.LUC!l'COUNTY BUMPING DIVISION
REVIINN ED FOB C LIANCE
REVIVI ED Y
DATE I7
PLANS Al\T PERINUT MUST BE KEPT ON JGE
On NO LOSPECTION 1N iI.L EE mAnu,:.
i
I
I