HomeMy WebLinkAboutDrawing r
c
r
VALys
THESE PLANS AND ALL P POSED WORK
ARE SUr,.JFCT TO F�tgY Cc'��`tECTIONS
REQUIRED�;t RUD IN-,'►�CToS THAT
MAY BE NECESMY I ORDER TO
CON#I�6Y WITH ALL QOABLA COOK ' �D
Y) �A� e.
-- f 702-DS 3
ST. LUCIE COUNTY
BUILDING DIVISION
CONCEALED FASTENERS OR ATTACHMENTSR'VICMW`D
FOR co �E L n
ARE THE RESPONSIEILJTI'OF THE REVIEWED BY m
CONTRACTOR OF RECORD DATE PLANS AND PERMIT
MUST BE KEPT ON JOB OR
NO INSPECTION WILL BE MADE
1
4
1
IKB Construction
Demo existing bathroom. Reframe partition walls as shown for new shower and closet area using 3 5/8 metal
track and stud. Add shower as shown tying into existing 2" drain line at vanity. Rough in shower curb. Install
new Pro slope with pan liner as per code. Rough in new shower valve, slide bar, and Rain head. Rough-in
plumbing for new vanity location. Rough in and install LED lights as shown in drawing. Lights are wet area
approved. Ruffin and installing new exhaust fan. Run ducting through soffit area. Install new densshield in
shower area and drywall as needed. Approximately 12 - 16 sheets. Install new tile floor area and in the shower.
Install new Cabinetry and countertops. Install new Plumbing accessories(shower trim,toilet, faucet). Install new
electrical devices(switches, outlets, lighting, etc).No structural work is being performed