HomeMy WebLinkAboutProduct Approval Florida Building Code Online - Page 1 of 2
i
�,�.. r. __ Fes'_. ,
BCIS Home Log In 4kUserRegistration i. Hot Topics 4: Submit Surcharge : Stats&Facts Publications FBC Staff i BCIS Site Map Links i Search
Product Approval
Oo
USER:Public User
tA
Product Approval Menu>Product or Application Search>Application List>Application Detail 1� I I , ��� � � �':
s�ti FL# FL16048 R4 E 215
Application Type Revision
Code Version 2014
Application Status Approved
CONCEALED FASTENERS OR ATTACHMEM
Comments ARE THE RESPONSOM OF THE
Archived ❑
�Vf1 I RN1d I Vfl�f3G1iNI11�
Product Manufacturer Tri-Built Materials Group,LLC
Address/Phone/Email PO Box 70
Rutherford,NJ 07070
485
david u16@t builtmg.com THESE PIANS ANN ALL PROPOSED WORK
.:ARE SUBJECT TO ANY CORRECTIONS
Authorized Signature David Riz
david.ruiuz@tribuiltmg.com REQUIRE®BY FIELD INSPECTORS THAT
t;tV NECESSARY: OROER'TO'u
Technical Representative David Ruiz ®
Address/Phone/Email 250 Route 17 North �� "�p��1��� �`f I ��I�� , �®a{ �
�°�,
East Rutherford, NJ 07073 Mal—
(201) 842-2449 l� lid
david.ruiz@tribuiItm a&'-al .CuRdfnnUl-T'-y'RUIT?»1G DIVISION
P-MEWED FOR COb;PLIANCE
Quality Assurance Representative REE 5 ED BY
Address/Phone/Email DATE
PLANS AND PERMIT DUST BE KEPT 0I�TS'
JO
Category Roofing OR NO DiTSPECTION WILL BE Ate:DE.
Subcategory Underlayments
Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed
Florida Professional Engineer
❑ Evaluation Report-Hardcopy Received
Florida Engineer or Architect Name who developed Robert Nieminen
the Evaluation Report
Florida License PE-59166
Quality Assurance Entity UL LLC
Quality Assurance Contract Expiration Date 10/16/2017
Validated By John W. Knezevich,PE
W Validation Checklist-Hardcopy Received
Certificate of Independence FL16048 R4 COI 2016 01 COI Nieminen.Ddf
Referenced Standard and Year(of Standard) Standard Year
ASTM D1970 2009
ASTM G155 2005
FRSA/TRI April 2012(04-12) 2012
TAS 103 1995
Equivalence of Product Standards
Certified By
Sections from the Code
http://www.floridabuilding.org/pr/pr_app_dtl.aspx?param=wGEVXQwtD gtFPmdYiND Wr... 3/3/2017
Florida Building Code Online Page 2 of 2
Product Approval Method Method I Option D
Date Submitted 10/06/2016
Date Validated 10/17/2016
Date Pending FBC Approval 10/19/2016
Date Approved 12/13/2016
Summa ry of Produ cts
FL# Model, Number or Name Description
16048.1 TRI-BUILT Roof Underlayments Self-adhering, modified bitumen roof underlayments
Limits of Use Installation Instructions
Approved for use in HVHZ: No FL16048 R4 11 2016 10 FINAL ER TRI-
Approved for use outside HVHZ:Yes BUILT UNDERLAYMENTS FL16048-R4.pd
Impact Resistant: N/A Verified By: Robert Nieminen PE-59166
Design Pressure: +N/A/-67.5 Created by Independent Third Party:Yes
Other: 1.)The design pressure noted herein pertains to use Evaluation Reports
of foam-on tile systems overtop the self-adhering FL16048 R4 AE 2016 10 FINAL ER TRI-
underlayment for one particular application.See ER Section BUILT UNDERLAYMENTS FL16048-R4.pd
5.6.4 for details,2.)Refer to ER Section 5 for other Limits of Created by Independent Third Party:Yes
Use.
Back Next
Contact Us::2601 Blair Stone Road.Tallahassee FL 32399 Phone:850-487-182
The State of Florida is an AA/EEO employer.Copyright 2007-2013 St&of Florida,::Privacy Statement::Accessibility Statement::ggfgad Statement
Under Florida law,email addresses are public records.If you do not want your e-mail address released In response to a public-records request,do not send
electronic mail to this entity.Instead,contact the office by phone or by traditional mail.It you have any questions,please contact 850,487.1395.*Pursuant to
Section 455.275(1),Florida Statutes,effective October 1,2012,licensees licensed under Chapter 455,F.S.must provide the Department with an email address if
they have one.The emalls provided may be used for official communication with the licensee.However email addresses are public record.If you do not wish to
supply a personal address,please provide the Department with an email address which can be made available to the public.To determine if you are a licensee under
Chapter 455,F.S.,please click here.
Product Approval Accepts:
...........
Credit Cad
Safe
http://www.floridabuilding.org/pr/Pr�__app_dtl.aspx?pa,ram=wGEVXQWtDqtFPmdYiNDWr... 3/3/2017
�1;ij ci' y'�; !`r J'NkFERIOR RESEARCH&DESIGN,I.I.C.
� , I ,
, i, •,,I , I � }, s. Certificate of Authorization#9503
I ,7 i, 353.CHRISTIAN STREET,UNIT#13
OTRINITY ERD -5'F' s' OXFORD,CT 06478
PHONE.(203)262-9245
FAX:(203)262-9243
EVALUATION REPORT
Allied Building Products Corp. Evaluation Report A42960.10.12-R3
dba TRI-BLIILT Roofing Products FL16048-113
9050 Louisiana Street .Date of Issuance:10/25/2012
Merrillville,IN 46410 Revision 3: 10/08/2015
SCOPE:.
This Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of
construction.materials in the State of Florida.The documentation submitted has been reviewed by Robert Nieminen,
P.E. for use of the ,product under the Florida Building Code and Florida Building Code, Residential Volume, The
products described herein have been evaluated for compliance with the 15th Edition (2014) Florida Building Code
.sections noted herein.
DESCRIPTION: TRI-BUILT Roof.Underlayments
LABELING: Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted
herein.
CONTINUED COMPLIANCE: This'Evaluation Report it valid until such time as the named product(s) changes,the referenced
Quality Assurance documentation changes,or provisions of the Code that relate to the!product change. Acceptance of
this Evaluation Report by the named client constitutes agreement to notify Robert :Nieminen, P.E. if the product
changes or the referenced.Quality Assurance documentation changes. Trinity ERD requires a+complete review of this
Evaluation Report relative to updated Code requirements with each Code Cycle.
.ADVERTISEMENT: The Evaluation Report number preceded by the words "Trinity IERD Evaluated" may be displayed in
advertising,literature. If any portion of the Evaluation Report is displayed,then it shall be done in its entirety.
INSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the.user by the manufacturer or
.its distributors and shall be available for inspection.at the job site at the request of the Building Official.
This Evaluation'Report consists.of pages 1 through 5.
Prepared by: q,tit,�rtrrz,,,��
Robert J.M.Nieminenj P.E. The facsimile seal appearing was authorized by Robert Nieminen,
P.E.on 10/08/2015.This does not serve as an electronically s(no
Florida Registration No.59166,Florida DCA ANE1983 �/hcrn,t document 5 gned,sealed hardcoples have been transmitted to the
Product Approval Administrator and to the named client
CERTIFICATION OF.INDEPENDENCE:
1. Trinity IERD does not have, nor does it intend to acquire or will it acquire, a financial interest in any company manufacturing or
distributing products it evaluates.
2. Trinityl ERD is not owned,operated or controlled by any company manufacturing or distributing products it evaluates.
3. Robert Nieminen, P.E.does not have nor will acquire,a financial interest in any company manufacturing or distributing products for
which the evaluation reports are being issued.
4. Robert Nieminen, P.E.does not have,nor will acquire,a financial interest in any other entity involved in the approval process of the
product.
5. This is a building code evaluation. Neither Trinityl ERD nor Robert Nieminen, P.E. are, in any way,the Designer of Record for any
project on which this Evaluation Report,or previous versions thereof,is/was used for permitting or design guidance unless retained
specifically for that purpose.
u JL
rTRIN11YI ERD
ROOFING COMPONENT EVALUATION:
1. SCOPE:
Product Category: Roofing
Sub-Category: Underlayment
Compliance Statement: TRI-BUILT Roof Underlayments,as produced by TRI-BUILT, have demonstrated'compliance
with the following sections of the Florida Building Code through testing in accordance with the following Standards.
Compliance is subject to'the Installation Requirements and Limitations/Conditions of Use set forth herein.
2. STANDARDS:
Section Property Standard Year
1507.2.4,1507.2.8,1507.2.9.2, Physical Properties ASTM D1970 2009
1507.4.5.1'1507.5.3,1507.7.3
1504.6 Accelerated Weathering ASTM G155 2005
1507.3.3 Installation Practice FRSA/.TRI April 2.012(04-12) 2012
1523:6.5.2.1 Physical Properties TAS 103 1995
3. REFERENCES:
Entity EXainination Reference Date
ERD(TST6049) Physical Properties 540540.02.13-1 02/19/2013
ERD(TST6049) Physical Properties 540540.11.13 11/19/2013
ERD(TST6049) Physical Properties S40540.03.14 63/26/2014
ERD(TST6049) Physical Properties 544870.04.14-2 04/02/2014
ERD(TST6649) Physical Properties 544870.04.14-3 04/02/2014
ERD(TST6049) Physical Properties 544870.04.14-1 04/10/2014
ERD(TST6049) Physical Properties '544870.04.14-4 04/10/2014
ERD(TST6049) Physical Properties S43530.02.14-1-R1 05/14/2014
ERD(TST6049) Physical Properties S43530.05.14 05/28/2014
ERD(TST6049) Physical Properties 540540.10.14 10/31/2014
ERD(TST6049) Physical Properties SC7645.02.15 02/13/2015
ERD(TST6049) Accelerated Weathering SC8520.04.15 05/27/2015
UL,LLC.(gUA9625) Quality Control Multiple-Listing R16814 09/04/2015
UL,LLC.(QUA9625) Quality Control Service Confirmation Exp.10/16/2017
4. PRODUCT DESCRIPTION:
4.1 Self-Adhering Underlayments:
4.1.1 Tri-Built Sand-R SA Shingle Underlayment is a self-adhering, glass-mat reinforced, sand-surfaced, SBS
modified bitumen roof underlayment,with a 36-inch sheet width.
4.1.2 Tri-Built S/A HT TU Underlayment is a self-adhering, non-woven polyester fabric surfaced, SBS modified
bitumen roof underlayment
4.1.3 Tri-Built Smooth HT S/A Underlayment is a self-adhering,glass-mat reinforced,film-surfaced,SBS modified
bitumen roof underlayment.
5. LIMITATIONS:
5.1 This is a building code evaluation. Neither TrinityJERD nor Robert Nieminen, P.E. are, in any way, the
Designer of Record for any project on which this Evaluation Report, or previous versions thereof, is/was
used for permitting or design guidance unless retained specifically for that purpose.
5.2 This Evaluation Report is not for use in the HVHZ.
5.3 Fire Classification is not part of this Evaluation Report; refer to current Approved Roofing Materials
Directory for fire ratings of this product.
Exterior Research and Design,LLC. Evaluation Report A42960.10.12-R3
Certificate of Authorization#9503 1`116048-113
Revision 3:10/08/2015
Page 2 of 5
r
•
TRINITY ERS
5.4 TRI-BUILT Roof Underlayments may be used.with any prepared roof cover where the product is specifically
referenced within.FBC approval documents. If not listed,a.request may be made to the AHJ for approval
based on this evaluation combined with supporting data for the prepared roof covering..
5.5 Allowable roof covers applied atop the underlayments are as follows:
TABLE 1: ROOF COVER OPTIONS
Underlayment Asphalt Nail-On.Tile Foam,On The Metal Wood Shakes Slate
Shingles &Shingles
Tri-Built Sand-R SA Shingle Yes No No No Yes Yes
Underlayment
Tri-Built S/A HT TU Yes
Yes Yes Yes Yes Yes
Underlayment See 5.5.1
Tri-Built Smooth HT S/A Yes No No Yes Yes Yes
Underlayment
5.5.1 "Foam=On Tile" is limited to use of the following Approved tile adhesives unless tensile adhesion /long
term aging data from an accredited testing laboratory is provided.
`Tri-Built S/A'HT TU Underlayment with 3M'`2-Component Roof Tile Adhesive AH-160(FL6332).or Dow
TileBondl Roof Tile Adhesive(FL717)
5.6 Allowable substrates are noted below:
5.6.1 Direct-Bond to Deck:
Tri-Built Sand=R,SA Shingle Underlayment, Tri-Built'S/A HT TU Underlayment or Tri-Built Smooth!HT S/A
Underlayment applied to:
Plywood; ASTM D41 primed, plywood; OSB; ASTM D41 primed OSB; ASTM D41 primed structural
concrete.
While not required over plywood,0513 or:Southern Yellow Pine substrates,TRI-BUILT recommends priming
the deck if the final roof cover is not slated for installation within 24 hours. Note: TRI-BUILT requires
tongue-and-groove board decking be covered with plywood or OSB prior to installation of the self-
adhering underlayment.
5.6.2 Bond-to-Insulation:
Tri-Built S/A HT TU Underlayment applied to:
➢ Dens Deck Prime;SECUROCK Gypsum-Fiber Roof Board.
For installation under mechanically attached prepared roof coverings, insulation shall be attached per
minimum requirements of the prepared roof covering manufacturer's Product Approval. For installations
under foam-on the systems,insulation attachment shall be designed by a qualified design professional and
installed based on testing of the insulation/underlayment system in accordance with FM 4474,Appendix D
or TAS 114,Appendix J.
5.6.3 Bond to Mechanically Attached Base Layer:
➢ ASTM D226,Type I or II felt.
For installations under mechanically attached prepared roof coverings, base layer shall be attached per
minimum codified requirements. For installations under foam-on tile systems,base layer shall be attached
per minimum requirements of FRSA/TRI April 2012(04-12).
Exterior Research and Design,I.I.C. Evaluation Report A42960.10.12-113
Certificate of Authorization#9503 FL16048-R3
Revision 3:10/08/2015
Page 3 of 5
u � y
TRINITY I ERD
5.6.4 Wind Resistance for Underlayment Systems in Foam-On Tile Applications: FRSA/TRI April 2012 (04-12)
does not address wind uplift resistance of all underlayment systems beneath foam-on tile systems,where
the underlayment forms part of the load-path. The following wind uplift limitations apply to direct-deck
underlayment systems that are not addressed in FRSA/TRI April 2012.(04-12)and are used in foam-on the
applications. Maximum Design Pressure is the result of testing for wind load resistance based on
allowable wind loads, and reflects the ultimate passing pressure divided by 2(the 2 to 1 margin of safety
per FBC 1504.9 has already been applied). Refer to FBC 1609 for determination of design wind pressures.
5.6.4.1 Maximum Design Pressure=-45.0 psf.
Deck: Min.15/32-inch plywood to meet project requirements tosatisfaction of AHJ.
Primer: (Optional)ASTM D41
Underlayment: Tri-Built S/A HT TU Underlayment,self-adhered.
5.7 Exposure Limitations:
5.7.1 TrkBuilt Sand-R SA Shingle Underlayment or Tri-Built Smooth HT S/A Underlayment shall not be left
exposed for longer than 30-days after installation
5.7.2 Tri-Built S/A HT TU Underlayment shall not be left-exposed for longer than 180-days after installation.
6. INSTALLATION:
6.1 TRI-BUILT Roof Underlayments shall be installed in accordance with TRI-BUILT published installation
requirements subject to the Limitations set forth in Section 5 herein and the specifics noted below.
6.2 Re-fasten any loose decking panels, and check for protruding nail heads. Sweep.the substrate thoroughly
to remove any dust and debris prior to application,and prime the substrate(if applicable).
6.3 Tri-Built Sand-R SA Shingle Underlayment,Tri-Built S/A HT TU Underlayment or Tri-Built Smooth HT S/A
Underlayment:
6.3.1 Shall be installed in compliance with the requirements for ASTM D1970 underlayment in FBC Sections
1507 for the type of prepared roof covering to be installed.
6.3.2 Non-rile applications:
While priming is optional,TRI-BUILT recommends priming the deck if the final roof cover is not slated for
installation within 24 hours.
Apply sheet parallel to the roof edge. Roll out approximately 10 ft of membrane and peel back the first 3
ft of release film.
Adhere the exposed part to the substrate and unroll the remaining membrane as far as possible.
Once the entire length of membrane is in place, peel-off the release film diagonally while holding the
membrane tight. Firmly roll the membrane into place to achieve a bond.
Horizontal seams should be minimum 3-inches, configured to shed water. Vertical seams should be 6-
inches and staggered not less than 2-ft from vertical seams in the course below. All over-granule end-laps
shall be sealed using either heat-welding or hot air welding techniques.
When installing at slopes above 8:12, Allied Building Products Corp recommends back-nailing in the
overlap area at the top of the sheet at 12-inch o.c.
For Valleys and Ridges: Cut underlayment into 4 to 6 foot lengths.Peel the release paper and center sheet
over valley or ridge. Drape and press sheet into place, working from the center of the valley or ridge in
each direction. For valleys,apply the sheet starting at the lowest point and work upward.
6.3.3 Tile Applications(Tri-Built S/A HT TU Underlayment only):
Reference is made to FRSA/TRI April 2012 (04-12) Installation Manual and Table 1 herein, using the
instructions noted above as a guideline.
Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the
underlayment.
Exterior Research and Design,I.I.C. Evaluation Report A42960.10.12-113
Certificate of Authorization#9503 FL16048-113
Revision 3:10/08/2015
Page 4 of 5
TRINITY I ERD
7. BUILDING PERMIT REQUIREMENTS:
As required by the Building Official or Authority Having Jurisdiction:in order to properly evaluate the installation of
this product.
8. MANUFACTURING PLANTS:
Contact the noted QA agency for information on product locations covered for F.A.C.Rule 9N-3 C1A requirements.
9. QUALITY ASSURANCE ENTITY:
UL,LLC-QUA9625;(314)578-3406;k.chancellor@us.ul.com
-END OF EVALUATION REPORT-
Exterior Research and Design,I.I.C. Evaluation Report A42960.10.12-113
Certificate of Authorization#9503 FL16048-R3
Revision 3:10/08/2015
Page 5 of 5