Loading...
HomeMy WebLinkAboutLetter; Frame all inspection issues) 4 2015 Architectural Design & Drafting ---FL License#AA26001583 1672 SE Pleasantview St., Port St. Lucie, Florida 34983 (772) 336-8102 Fax (772) 336-5764 October 30,.201,5 RE: Emmons Res. 526 Campbell Rd. Ft. Pierce, FL To Whom it may concern: This letter is to address issues brought up at the frame -all inspection. �5Gy-0ay4 1. Large dormer framing at entry to be framed as per section " B-B" on sheet A-301. All studs to have Simpson SP4 or SP1 at top with all holes filled with 10d nails and Simpson MSTA12 with all holes filled with 10d nails at bottom (strapped to girder truss below). Trusses are to be strapped per connector schedule on sheet A-401. 2. False dormers are to be strapped thru roof sheathing to trusses below (similar to valley truss framing). 3. Truss GRG to be strapped to masonry wall as follows: Two (2) Simpson HETA20 straps embedded into bond beam and all holes filled with 10d nails (2500# uplift) and Simpson MTSM16 attached to inside of masonry wall with 4-%" x 2%" Titen screws and to truss with 7-10d nails (860# uplift). 4. Addition of Mini -split a/c unit in Hobby room changes total electrical demand from 176A to 188.5A. Please feel free to call if you have any questions or comments. Rob an AR0014925 � � 44