Loading...
HomeMy WebLinkAboutInspection Docs (2) From fax5616880909 1.161.688.0909 Mon May.: 4 07:47:16 2020 MDT Pagel of 2 5/4/2020 County PCL Form y�G1E "COG St Lucie County Inspections RErCEIV56 2300 Virginia Avenue Ft Pierce,FL 34982 MAY 0 2020 '20Ri94'" (722) 462-2172 :ST. Lucie County, Permitting CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT# ' 1909• JOB ADDRESS 2994 Bent Pine Dr,Fort Pierce,FL 34951 BUILDER GHO Homes PEST CONTROL CONTRACTOR HomeTcam Pest Defense,Inc. PEST CONTROL LICENSE# :JF0001886 We,the undersigned,hereby-certify that we have pretreated the above-described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated:. 260 Chemicals used: Sentricon Always Active HD bait Percentage of solution: Total gallons used: Date of treatment: 04/29/20 Time of treatment: AM FBC104.2.6 CerdrlFaee of Protective Treatment for prevention of termites. A weather resislanl jobsite posting board shall be provided to receive ®.Footing duplicate Treatment Certificates as each required protective treatment is ®.I St Treatment cornpleled,providing a copyfor the person the poernrit is iisued to and another copy for the:building permit files. The Treatment Cerfcaieshall Re-treat provide the product used identity of the applicalor time and date of the I`' Slab treatment,site location,area treated,chemical used,peirent concentration and number ofgal/nns eased,to egtablisli a veritable record of protective r 1 St Treatment trealnrent. If.the soil chemical barrier method for termile prevention is used, r Re-treat final exterior treatment shall be completed prior io,final building approval. Driveway St Lucie County requires for the final inspection for CO,a Permanent r 1 St Treatment Sticker to be placed on the electrical panel box cover,listing all the r Re-treat treatments and dates pi applications. r Pools I—1st Treatment Re-treat, Signature of exterminator F Other F I st Treatment I—Re-treat ®Perimeter for Final Inspection NOTE:There must be a completed form for each'required treatment or re-treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and:a re-inspection fee charged. . pestpacx.htpd.local/forms/countypcl_print,_plain.asp?FormiD=1617389&preprint=0&pdf= 1/1