HomeMy WebLinkAboutInspection Docs (2) From fax5616880909 1.161.688.0909 Mon May.: 4 07:47:16 2020 MDT Pagel of 2
5/4/2020 County PCL Form
y�G1E "COG St Lucie County Inspections RErCEIV56
2300 Virginia Avenue
Ft Pierce,FL 34982 MAY 0 2020
'20Ri94'" (722) 462-2172 :ST. Lucie County, Permitting
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT# ' 1909• JOB ADDRESS 2994 Bent Pine Dr,Fort Pierce,FL 34951
BUILDER GHO Homes
PEST CONTROL CONTRACTOR HomeTcam Pest Defense,Inc.
PEST CONTROL LICENSE# :JF0001886
We,the undersigned,hereby-certify that we have pretreated the above-described construction for subterranean termites in
accordance with the standards of the National Pest Control Association.
Square feet of area treated:. 260 Chemicals used: Sentricon Always Active HD
bait
Percentage of solution: Total gallons used:
Date of treatment: 04/29/20 Time of treatment: AM
FBC104.2.6 CerdrlFaee of Protective Treatment for prevention of termites.
A weather resislanl jobsite posting board shall be provided to receive
®.Footing duplicate Treatment Certificates as each required protective treatment is
®.I St Treatment cornpleled,providing a copyfor the person the poernrit is iisued to and
another copy for the:building permit files. The Treatment Cerfcaieshall
Re-treat provide the product used identity of the applicalor time and date of the
I`' Slab treatment,site location,area treated,chemical used,peirent concentration
and number ofgal/nns eased,to egtablisli a veritable record of protective
r 1 St Treatment trealnrent. If.the soil chemical barrier method for termile prevention is used,
r Re-treat final exterior treatment shall be completed prior io,final building approval.
Driveway St Lucie County requires for the final inspection for CO,a Permanent
r 1 St Treatment Sticker to be placed on the electrical panel box cover,listing all the
r Re-treat treatments and dates pi applications.
r Pools
I—1st Treatment
Re-treat, Signature of exterminator
F Other
F I st Treatment
I—Re-treat
®Perimeter for Final Inspection
NOTE:There must be a completed form for each'required treatment or re-treatment and this form must be on the job site to be
picked up by the inspector at time of each inspection or the scheduled inspection will fail and:a re-inspection fee
charged. .
pestpacx.htpd.local/forms/countypcl_print,_plain.asp?FormiD=1617389&preprint=0&pdf= 1/1