HomeMy WebLinkAboutStanton DrawingREPLACE DOORS IN 2 OPENINGS ONLY.
NEW DOORS TO BE IMPACT RESISTANT -
HURRICANE SHUTTERS NOT REQUIRED.
2
2° X 80"
REPLACE EXISTING DOORS AS DESIGNATED WITH NEW FLORIDA BUILDING CODE APPROVED DOORS.
NO CHANGE IN SIZE. NO MODIFICATION TO OPENINGS.
DOOR FRAME #1 TO BE ATTACHED THROUGH EXISTING BUCKS WITH #10 WOOD SCREWS INTO WOOD SUBSTRATE
WITH A MINIMUM 1 1/2" PENETRATION PER MANUFACTURER'S PRODUCT APPROVAL DOCUMENTS.
DOOR FRAME #2 TO BE ATTACHED THROUGH EXISTING BUCKS WITH 1/4" TAPCON SCREWS INTO CONCRETE
WITH A MINIMUM 1 1/4" PENETRATION PER MANUFACTURER'S PRODUCT APPROVAL DOCUMENTS.
LESS THAN 30% OF STRUCTURE'S VALUE. NOT A RENOVATED BUILDING. EXEMPT FROM 2017 ENERGY CONSERVATION CODE.
SEE WIND LOAD CHART ON NEXT PAGE FOR SPECIFIC OPENING PRESSURES
DESIGN PRESSURES OF PRODUCT MEET OR EXCEED SPECIFIC OPENING PRESSURES
MEAN ROOF HEIGHT = 12 FT 9 IN
STANTON RESIDENCE
5301 SUSON LANE
FORT PIERCE, FLORIDA
DOOR REPLACEMENT PLAN
OPENING
PRODUCT
DESIGN
OPENING
SQ.
WIND
PRESSURES
APPROVAL
PRESSURES COMMENTS
NO, WIDTH. HGT.
FTG.
ZONE
POS. NEG.
(N.O.A. #)
POS. NEG.
1
66 80
36.67
4
35.1
-38.3
FL22378.3
50.0
-50.5 FRONT ENTRY - LSMI
2
32 80
17.78
4
37.8
1 -41.0
FL16674.1
50.0
-50.0 SIDE GARAGE - LSMI
REPLACE EXISTING DOORS AS DESIGNATED WITH NEW FLORIDA BUILDING CODE APPROVED DOORS.
NO CHANGE IN SIZE. NO MODIFICATION TO OPENINGS.
DOOR FRAME #1 TO BE ATTACHED THROUGH EXISTING BUCKS WITH #10 WOOD SCREWS INTO WOOD SUBSTRATE
WITH A MINIMUM 1 1/2" PENETRATION PER MANUFACTURER'S PRODUCT APPROVAL DOCUMENTS.
DOOR FRAME #2 TO BE ATTACHED THROUGH EXISTING BUCKS WITH 1/4" TAPCON SCREWS INTO CONCRETE
WITH A MINIMUM 1 1/4" PENETRATION PER MANUFACTURER'S PRODUCT APPROVAL DOCUMENTS.
LESS THAN 30% OF STRUCTURE'S VALUE. NOT A RENOVATED BUILDING. EXEMPT FROM 2017 ENERGY CONSERVATION CODE.
SEE WIND LOAD CHART ON NEXT PAGE FOR SPECIFIC OPENING PRESSURES
DESIGN PRESSURES OF PRODUCT MEET OR EXCEED SPECIFIC OPENING PRESSURES
MEAN ROOF HEIGHT = 12 FT 9 IN
STANTON RESIDENCE
5301 SUSON LANE
FORT PIERCE, FLORIDA
DOOR REPLACEMENT PLAN