Loading...
HomeMy WebLinkAboutConstruction PlansCO A Quality Engineered Building System Building From Your Construction Professionals Systems - THESE PLANS AND ALL PROPOSED WORK A Robertson Ceco Company ARE SUBJECT TO ANY CORRECTIONS REQUIRED BY FIELD INSPECTORS THAT South ern RegionlColumbus, MS MAY BE NECESSARY IN ORDER TO o LL u I� - E DESIGN LOADING DRAWING INDEX C51 COVER SHEET BUILDING SPECIFICATIONS CONTRACTOR RESPONSIBILITIES THIS STRUCTURE /S DESIGNED UTILIZING THE LOADS N/A PRIMARY STEEL INDICATED AND APPLIED AS REQUIRED BY: El ROOF FRAMING PLAN THE STRUCTURE UNDER THIS CONTRACT HAS BEEN DESIGNED AND DETAILED FOR THE LOADS THE CONTRACTOR MUST SECURE ALL REQUIRED APPROVALS AND PERMITS FROM THE APPROPRIATE SBC 1997 E2 SIDEWALL ELEVATIONS AND CONDITIONS STIPULATED IN THE CONTRACT AND SHOWN ON THESE DRAWINGS. ANY AGENCY AS REQUIRED. E2 ENDWALL ELEVATIONS ALTERATIONS TO THE STRUCTURAL SYSTEM OR REMOVAL OF ANY COMPONENT PARTS, OR THE THE CONTRACTOR IS TO CONFIRM THAT THESE LOADS N/A MEZZANINE LAYOUT ADDITION OF OTHER CONSTRUCTION MATERIALS OR LOADS MUST BE DONE UNDER THE ADVICE APPROVAL OF CECO BUILDING SYSTEMS 'DRAWINGS. AND CALCULATIONS INDICATE THAT CECO HAS COMPLY WITH THE REQUIREMENTS OF THE LOCAL OF A REGISTERED ARCHITECT, CML OR STRUCTURAL ENGINEER. CECO BUILDING SYSTEMS CORRECTLY INTERPRETED AND APPLIED THE,REQUIREMENTS OF THE CONTRACT DRAWINGS AND BUILDING DEPARTMENT. N/A CROSS SECTIONS WILL ASSUME NO RESPONSIBILITY FOR ANY LOADS NOT INDICATED. SPECIFICATIONS. (SECT. 4.2.1 AISC CODE C.=. STANDARD PRACTICE, 9th EDITION) FOR SPECIFIC LOADS AND SCOPE OF SEAL N/A SHEETING LAYOUT THIS CECO METAL BUILDING IS DESIGNED WITH CECO BUILDING SYSTEMS STANDARD DESIGN WHERE DISCREPANCIES EXIST BETWEEN THE CECO STRUCTURAL STEEL PLANS AND THE PLANS FOR SEE CECO BUILDING SYSTEMS CERTIFICATION LETTER El FLASHING LAYOUT PRACTICES WHICH ARE BASED ON PERTINENT_ PROCEDURES AND RECOMMENDATIONS OF THE OTHER TRADES, THE STRUCTURAL STEEL PLAS WILL GOVERN. (SECT. 3.3 AISC CODE OF E3-E4 GENERAL DETAILS FOLLOWING ORGANIZATIONS AND CODES. STANDARD PRACACE, 9th EDITION) DESIGN CONSIDERATIONS OF ANY -IN THE 12116120 PSF ROOF LIVE LOAD (Reduction Allowed) N/A ANCHOR BOLT PLAN AMERICAN INSTITUTE OF STEEL CONSTRUCTION: SPECIFICATION FOR THE DESIGN, MATERIALS: STRUCTURE WHICH ARE NOT FURNISHED BY N/A REAC77ONS FABRICATION, AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS' 9th EDITION. CECO ARE THE RESPONSIBILITY OF THE CONTRACTOR AND ENGINEERS OTHER THAN CECO O PSF SNOW LOAD (Ground) ENGINEERING UNLESS SPECIFICALLY INDICATED. AMERICAN IRON AND STEEL INSTITUTE. SPECIFICATION FOR THE DESIGN OF COLD 1t0 MPH WIND SPEED (Enclosed Bldg) FORMED STRUCTURAL MEMBERS" 1996 WITH 1999 SUPPLEMENT. THE CONTRACTOR IS RESPONSIBLE FOR ALL ERECTION OF STEEL AND ASSOCIATED WORK IN CXP GENERAL DETAILS COMPLIANCE WITH CECO CONSTRUCTION DRAWINGS AND CECO GENERAL ERECTION INFORMATION GUIDE". 1 PSF COLLATERAL (Purlins and Fromes) (GOIJUH a CMV Laoa£q AMERICAN WELDING SOCIETY • STRUCTURAL WELDING CODE" AWS D 1.1-2000, ❑ NO THERMAL BLOCKS AND AWS D1.3-1998 TEMPORARY SUPPORTS SUCH AS TEMPORARY'GUYS, BRACES, FALSEWORK OR OTHER ELEMENTS REQUIRED SEISMIC CONDITIONS: ❑ THERMAL BLOCKS FOR ERECTION WILL BE DETERMINED, FURNISHED, AND INSTALLED BY THE ERECTOR. (SECT Z9.1 (sPt ate) MATERIAL PROPERTIES OF STEEL PLATE AND SHEET STEEL USED IN THE FABRICATION OF PRIMARY RIGID FRAMES AND ALL PRIMARY STRUCTURAL FRAMING MEMBERS THAN AISC CODE OF STANDARD PRACTICE, 9th EDITION) GROUND MOTION .................Aa= ,,gq- Av _ .05 ❑ THERMAL BLOCKS (OTHER COLD FORMED SECTIONS) CONFORM TO ASTM A-529 GRADE 50 OR A-570 OR A-572 GRADE 50 - IT IS THE CONTRACTORS RESPONSIBILITY TO_; APPLY AND OBSERVE ALL PERTINENT SAFETY RULES HAZARD EXPOSURE GROUP.. I (ear saerFLv av RADM s OgXR) (NOWGWAMR MW 6' N91AAMV isSPOM a) WITH A MINIMUM YIELD OF 50.000 PSI. AND REGULATIONS, AND PER OSHA STANDARDS AS APPLICABLE. THESE DRAWINGS ARE FOR: .:: SOIL PROFILE TYPE ............ SA_ MATERIAL PROPERTIES OF COLD FORMED LICHT CAGE STEEL MEMBERS CONFORM TO THE THE CONTRACTOR IS RESPONSIBLE FOR THE VERIFICATION OF ALL SHIPMENTS RECEIVED. CONSTRUCTION REQUIREMENTS OF ASTM-570, WITH A MINIMUM YIELD OF 55,000 PSI. SHORTAGES MUST BE REPORTED TO CECO BUILDING SYSTEMS WITHIN 48 HOURS OF DELIVERY. PERFORMANCE CATEGORY ... B HIGH STRENGTH BOLTS AND THEIR INSTALLATION SHALL CONFORM TO ASTM SPECIFICATION A-325. WHEN ERECTING A RAFTER OR ROOF BEAM, •, TEMPORARY GRAVITY SUPPORT (CRANE AND SHORING) 7 OCCUPANCY CATEGORY ACCORDING TO NOT FOR CONSTRUCTION TIGHTENING OF THESE BOLTS IS RECOMMENDED BY THE TURN -OF -NUT METHOD, PER MUST BE MAINTAINED UNTIL ALL .FLANGE BRACES FOR THAT MEMBER AND THEIR RELATED PURLINS MBMA 1986 DERN177ON ® PERMITS ONLY AISC SPECIFICATIONS FOR STRUCTURAL JOINTS" ARE INSTALLED. APPROVAL ALL STEEL MEMBERS EXCEPT BOLTS AND FASTENERS SHALL RECEIVE ONE SHOP COAT OF VHEN ERECTING A RIGID FRAME VITH INTERIOR COLUMNS, A RAFTER SECTION SHOULD NOT BE SPECIAL LOADS: INHIBITIVE PRIMER UNLESS STATED OTHERWISE IN THE CONTRACT. RELEASED FROM ITS TEMPORARY GRAVITY SUPPORTS (CRANE AND SHORING) UNTIL THE ADJACENT SHOP AND FIELD INSPECTIONS AND ASSOCIATED FEES ARE THE RESPONSIBILITY OF THE UNLESS STPULATED OTHERWISE.DEC SPAN (S) INCLUDING ALL COLUMNS REQUIRED. ARE BOLTED IN PLACE AND ALL FLANGE BRACES FOR THE ABOVE ARE INSTALLED. lCONTRACTOR, dv 4 o 2001 ,lBl9lLD1� t':�-� FROM : AISC CODE OF STANDARD PRACTICE - 7.12 CORRECTION OF ERRORS, NORMAL ERECTION OPERATIONS INCLUDE THE MINOR MISFITS MIT MBMR ±' DA! 1MGSTHE CORRECTION OF BY MODERATE AMOUNTS OF REAMING, CHIPPING, WELDING OR CUTTING, AND THE DRAWING OF ELEMENTS INTO LINE THROUGH �creL 6uLoxe wu6etn>m+s �sooAnEM G*� ; USE OF DRIFT PINS ERRORS VHICH CANNOT BE CORRECTED BY THE FOREGOING MEANS OR WHICH REQUIRE MAJOR CHANGES IN MEMBER CONFIGURATION ARE REPORTED IMMEDIATELY TO THE 17VNER AND * ANCHOR BOLT PLAN AND RFACDONS -ONLY FABRICATOR BY THE ERECTOR, TO ENABLE VHOEVER IS RESPONSIBLE EITHER TO CORRECT THE ERROR OR TO APPROVE THE MOST EFFICIENT AND ECONOMIC METHOD OF CORRECTION TO BE USED BY OTHERS' MBMA MEMBER AISC MB SBM SEAL DRAW DBL DALE 1214101 SOUDERN REGav P.a m4mm 9rJ _Ceco Bui/ding Systems e59 JOB NO. f0-B-19770-1 WY BE UNDER SEPARATE COVER. NOTT bC +O FOR QUESTIONS OR ASSISTANCE CONL ERECTON OF-C£CO �C USED * * FOR CONSTRUCTION BUILL: CHECKED DATE o Rober/sm Ceco comp6ny J970J (662) J28-6722 MEMBER APPROVAL ORDERS MUST BE RELEASED FOR FABOC417ON WHIM 30 CALENDAR DAYS AFTER SUBMITTAL DRAWINGS ARE GEN(662) 243-2729 - JMAPP 12/01 CUSTOMER: SHIP T0.• RF CONCRETE caar INC BRYAN HACHT M B M A ENdN£ER DATE ISSUED OR THE ORDER WILL BE SUBJECT TO ANY CURRENT PRICE INCREASE. 664 OLD DIME HIGHWAY 15965 W. PARK LANE VERO BEACH, It J2962 FT P/£RCE, FL SCALE COMP FILE SHEET NO. CS1 _ ST.LUC/E COUNTY —!4i o- e q A S �m zm rm law zIR(TIP.) Few zu R w 22L r1P FBw raw raw s887 Foe! FBW Few FBw RN affi2 a262 a2w agar Faw azwfew ago! ol a2W Few CM f891 a2m FB9• a201 asw 21B zle GE.WZ sew FBw CLM �I �I rtl nw nw saw law FB9• zn(rip.) za(rip.) M rm z2R 71m fM4 ElL FBw £2 Few E2 EIR 2.1=10 25'-0 25 -0 2W-10 100'-0 b 2 J Arr PLAN • b b b ROOF FRAMING PLAN RMM not. rAmmar of •.0E w Tr mrau auamr w mr . Nsm. aLaur oars Ora50 aap A-M Q Pam Oa nmw Or na0aa •S 9 THE INCORRECT WAY aaOl xam%� lao to wr THE CORRECT WAY ar ANME 6 mF-M� W M O[ NO 01 NC Pft. r0 VARM Mwme Nab WO ! Na5 MUWW 6 MSG= r0a 0 AW CMWR a1L LOR VM rn .=61� Wt MN M" me4M OM SUGGESTED METHOD OF CONNECTION OF LICHT LOADS TO PURLINS PANELS U12)rEo f0R p/APNRAw RE WrEGRAL PARIS OF ROOF 50PUC A NRf. DO NOT MWFy I'-2 b EVOMR EG71T6 Nor £C6.p6 GPM EG6S6 DOWNSPOUT LAYOUT [4 REO 0] USE RASHM Pita 011116 FOR (I) X-0 x Y-O Fa USE FL SKVW PXa OTJ&6 FOR (1) H -0 X 01'-0 F,a USE FLASHM P= 0M96 FLIP (/) 12'-0 X 12=0 F.a USE FiASMW Fxa max FOP (1) 3'-0 X 1=0 F.a USE FLASHM IFTa'6 FOR LraMXU a.06IXw nm REFER TO DETAILS ON INSTALLATION OF WALK DOORS REFER TO DETAILS ON INSTALLATION OF FRAMED OPENINGS THIS BUILDING HAS A SEALED EAW WIN GUTTER. ROOF SHEET S/DELAPS ARE TO BE UNSEALED EXCEPT TO'-O FROM EAW.. USE STANDARD WALL PROCEDURES TO ERECT THE S/DEWALL AND ENDWALL PANELS "iS a ��aa�' amoa cva 11 aaQ fr � us au�ma ma�nNO1L0a mmia. oan0 � e6v41 Mf�O Y> �n16 ra w�ia�~ �p aD[ Yft ID�I101>t IjI�'(l�l �rm'�awi'a IIUI�IWTI l� �°l sn � C1 L rMs �� as sao va a� aY170•19p{NLL mo m rn R Lrm I rn on u ow n n L qN umwa t>r L--j i$ai"r�o R sm T9 0 6� IOW A A�.f II�� was �w�im wn sa. waa ws wu rw aE--r a� R/fr0 rid �� r�nas.e EMT6R EGIII6 ICLW �-CL269 n _� Q21 aLM6B "\ a?69 , 1'-6 ZIL -- ZJ zJ (2J Z1J �-ala0 aIO7 b I rn Z4L 28 Visa, OH2 Z12 a10o a100 m also a, a5o rn 1 Z4L zit LS Z12 i 26 27 Ct h C! o : a C so 6 6 ZIL IJ ZY MR z9 ro a aso 152 a?s2 a?5J azsJ 12'-O 6'-6 25'-0 2J'-10 2J=40 25'-0 1'-? b b cb' b b CCJB CIA CIA CIA CCJC swo ONE FBBB • Y-. ONE FBBB o r-4 ONE FBW • Y-s Wavo ONE F893 • 1J'-0 LIVE FBW 1 IJ'-0 ONE F89.7 / 1J'. 0 SID£WALL ELEVAT7ON "I* AT GRID LINE A" �a269 CL268 CL2�68 C1 Wl a269 1 -6 ZIL zJ ZJ ZIR m w rn Z4L Z4R Z2R m a rn Z4L z4R m ZIL IJ 2S PR 0 25'-0 I 25'-0 I 2r-10 u 1'-2 cb b b b b Ccm CIA CIA CIA Ccia CAFE IBM• 7-4 OWIBM • r-4 AWO OVE FM • r-. LIE FM • W-0 ONE FB9J 1 IJ'-0 O1E FB9J SIDEWALL ELEVATION 2" AT GRID LINE D" 2 KEY PLAN 4 l Ceco Building Systems I NUT asTALLAna " �a� AT CRT LAP fur O1 1/2• RM-NUT LAZE STD-NVr NUsr BE USED AT ALL ORr LAP 1/2' OAK CQQ11OIq to Y'LTA£ r1E FAISr fill m1tc DE AJ07 Bar sn'GM aRr 15 LENa narkam r-AWr L7 A RID AWACNLN 1/2-1J NEED AV r) m _.-wr BIPASS aRr MUM aUILR FLAW 6 Fmr onr Ir - sEcnno oar p O p Avr ear STD-1A1 r 4- SECTION A -A SCR PLAOE THE Bar 10000f DE MUM FIAAOE AND FMr ORr. maAw DE Bar arm mE sm-HUE FLOE DE amw mg OKR 11E sm_Wr AND 9raow wiN NUL OSrAIL SECOIO BIT AND SLUE arm ADr. 6 PANELS UI812EO FOR OIAPHRAGW BRACING AND ARE INTEGRAL PARIS Or SDE a ENDWaL STRUCiVRE, 00 NOT Y00/FY. 12 a? a210 IC 0 ALIC WXIO Z16 S W R a2OBL j n nsL nr nsR CL202 m Z14L Z16 ZI4R � Q202 ?74L Z16 ZIW O a2o2 a2m a202 a202 a202 I 19 -0 22'-0 II 19'-0 ERECTOR NOTE- PRE -DRILL ALL MW WALLb B C b PANEL 9DELAPS MATH 1/8• CCrC CE4a CE4CR CCJC DRILL BIT BEFORE INSTAILINO STITCH SCREWS VAMO N72X14 a92XI4 ra"O ran Fees • r-. m Fm • ran IBM / ,J'-o TW FB86 • ,r-o ENDWALL ELEVATION 4" AT GRID LINE 5" r-4 CIRr :a F.FL00R a?37 S'-0 ONE R£O. 5'-0 X 4'-0 REZD LOCATED F.O. JO'-0 yAp ROOF PAHEL o-4OUTER S,EEL PANEL 04EBIIAN 2210 CL2to RE) B /6Xt0 RUB mono 216 j Q209. Z15L ZlY ZISR a?o2 m h Z14L Z16 44R a202 Z14L ZI6 Z14R az02 a2a2 a2o2 a202 19'-O 22'-0 79'-0 r- (ib b b b VYIO � IN2"4 W77 1W0 FIND FM 1 r-4 Tan FM 1 2-4 ISO FBW • IJ=O INV FBW/ IX-0 i. ENDWALL ELEVATION 3" AT GRID LINE "I" c l 7 GIRT GIRT 6 SCREW ' FASTENERS PER CUP aloo CUP O 0 2 MACHINE 0 BOLTS (CL100) CLIP CHANNEL JAYS JAMB CLIP CONNECTION FASTENERS ,6 PER CLIP �1 TO GIRT 3 ��D CL100 CONNECTION e` FRAMED OPENING HEADER • GIRT CHANNEL JAMB i lop 1/2• FIN HEAD n CARRIAGE BOLT �' I: j (2 PER CLIP) JAMB FASTENER (2 PER CLIP JAMB TO CLIP AND JAMB TO GIRT) FRAMED OPENING DETAIL '�� EFl CUP FASTEN TO GIRT PS1A FRAMEFTER ROE vARF WITH 6 SCREW FASTENERS PURUN 1/2 A307 L-.. DOLTS CL255 CLIP M•F PEAK CONNECTION (3/4" A323 BOLTS) SOEWARAFTER SPLICEGF REOD)OOLLTS�2S(31 A325DOL15)L202 CLIP FLANGE BRACEMALL JSTMT ORT GIRT EAVE STRUT KNEE CONECTION B10.� (3/4.A325 BOLTS) FLANI,E BRACE A307ears .1/2 CORNER 208 CLIP GIRT BOLTS�TBASE CUP lft A307 WASHER 1/2- EXPANSION O - Oo. BOLTS RICIO FRAME COLUMN PRIMARY FRAME DETAIL ANCHORS (BY OTHERS -O • ANCHOR Dar, NUT AMD CLEAR SPAN BEARING END FRAM WITH BY-PASS GIRT CHANNEL FRAMING FOR WASHER O-a WINDOW OR LOUVER 1. ROOF FRAMING PLAN WILL INDICATE COLUMN FLANGE BRACES IWLL BE (T � 1SOR (2) SIDEOR ) SIDE FLANGE S STO MATCH RAFTER 2. 3. WHEN FLANGE BRAGS ARE REQUIRED AT PEAK PURLNS, THEY WILL BE 4. (DE AILESHOOWS FRAME RAFTERSING AS SHOWN- DETAIL COLUMN SIMILAR NCUP 2 BOLTS INSTALLED LAP�(TYPIIGLL)RUN PEAK PURUN ACLPP RAFTER PEAK CONNECTION eaisj m FLANGE APEAK (I DE OPPOSING) - ALL BOLTS SHOWN ARE 1/2 A307 UNLESS NOTED •DO NOT INSTALL BOLTS IN THESE WEB HOLES UNLESS CUP CL203 OR CL2G4 IS REQUIRED PURUN LAP (LENGTH VARIES) FLANGE BRACE AT \ (J INTERMEDIATE PURUNS �v YAY BE 1 SIDE OR 2 p SIDES (2 SIDES SHOWN) FLANGE BRACE CONN.3-0 FROM FRAME (MAY C CURAT LAP CONNGE BRACE AT PEAK (1 SIDE OPPOSING) FLANGE BRACE PROCEDURE DET060 EAVE STRUT SPLICE CL255 SAVE STRUT CUP CL255 CL268 \ COLUMN 1/2- A325 ears ELEVATION EAVE STRUT (6) 1/2" A325 BOLTS EAVE STRUT EAVE STRUT CONNECTION TO INTERIOR FRAME COLUMN COLUMN EF21/JU-E TC 2 t�PUR IN A325BOLTS CL2m CLP(CL270 �rn11 1/2 CAM B0.1(B ,ACNE0 EIdOT11S ORT END POST 1/27 YAOWE BOLTS RAFTER CL203 CUP DETAIL AT PURLIN ANTI -ROLL CLIP BEARING END FRAME WITH BY-PASS GIRTS ENDWALL WBOLTS cFz 1/2- MACHINE BOLTS 1 1 1 1 NE 1 ADD STRUT PURUN 7' I CF12 UPHILL OF NORMALLY 1 II SPACED PURUN. 1 2-1/2" MACH BOLTS AT 1 u CL203 OR CL204 CONN. TO 1 PURUN WEB. CL203 OPEN SIDEWALL CORNER DETAIL _ A REWIRES 2 ADDITIONAL - (ALSO USED WHEN ENDWALL GIRT BOLTS AT CUP TO RAFTER o DOES NOT ALIGN WITH SIDEWALL GIRT) CONN. AHED (SMUI) • . 2 FASIEIERS CL262 PEIRLM R SCLZ62 PER RAFTER • PURUN OR GIRT CONNECTION TO FRAME e NOTE. ZEE LAPS MAY VARY �. SECTION 'A ='e CF1 INEN01 LGAND MAY NOT NECSAID BE TIE SAYE A EACH SOON EACH E OF THE FRAME BE U�A'T p YDST DO NOT INSTALL BOLTS HERE IAAE4D CL= OR LT.204 ARE REO FASTEN ROOF PANELS TO ADDED STRUT PURLIN LAP DOUBLE PURUN STRUT D Ip D D EAVE STRUT EAVE STRUT r CUP CL269 / COLUMN CL2691/2- A325 BOLTS ELEVATION EAVE STRUT CONNECTIO TO END FRAME COLUMN END FRAME COLUMN - (5) 1/2' A325 BOLTS 9 CL202 CUP - MACHINE UTILIZE BOTi011 FLANGE BRACE (SEE HOLE FOR BOLT- ERECTION PU1N5 FOR NG UP FLANGE LOCATION BRAGS DETAIL AT BY-PASS PURLINS OR GIRTS 8 CF10 e SIDEWALL GIRT A 8 ' , ENDWALL GIRT 2,3 OR 4 - 1/2- A325 /r BOLTS \} `I 1/2' A325 BOLTS BYPASS GIRT CORNER DETAIL BOLTS ENS CL258 OR CL273 - CL268 OR CL269 FAV_E STRUT SEGBON SHOWN - BOLT REOUIr7FucNTc NOTE: BEARING LEG PREDRILL MVW PANEL SIDEIAPS MATH 1/B• DRILL BIT BEFORE INSTALLING STITCH FASTENERS NOTE: NSAAT= NOf SNOW FOR CLARITY PTS 3/16' x a/e SIDE10 PAUAS.<< ROO ELS- (3 PER FOOT) 3/16' 1 3/4' OCLAP MASTIC NTO64OATE FASIENERS (SEE NOTE 2) t—�_Rp _.G M SOGIAP MAsne I STITCH e FASTENE 3-0 COVERAGE 1-0 1-0 1-O BEATING AEC 3/16' z V 51OEUP BB1E: ...eTIO ( 1. CAE FASTENERS A NON SEALED CAVE - 2 PER FOOT 9. SEALED EAVE - 3 PER FOOT 2. INTERMEDIATE FASTENERS A ONE PER FOOT ] STITCH FASTENERS A. SEALED 9DELAP- l'-Y ON CENTER PLUS ONE ADDITIONAL AT FOUR WAY LAP B. UNSEALED 9DELAP- l'-3' ON CENTER UP IW-O' FROM EAVE. REMNNDER OF ROOF r-6' ON CENTER CLOSURE •. 9DELAP MASTIC - SEE BUILDING NOTE) ERECTION P MTS FOR USAGE. 5. LAVE CLOSURE (SEE BUILDING AVE ERECTION PRINTS FOR SEALNO CONDITIONS). k(SEE NOE T) ASTENEMRS A SEALED EAVE - TOP, BOTTOM. AND END JOINTS SEALED. NTH. 3132E 1 1 1/2- MASTICB. NON'SEALED EAVE - NO RU MASTIC REOUHED, STITCH FASTENERS ' 6. PEAK MATH RIDGE ROLL OR 3 - O C EPAR9ON RIDGE. A 1 3pF MASTIC TOP WALL PANEL D BOTTOM AND BOTTOY OF CLOSURE. PT14 �(2'-6" ON CENTER) �YWMAPROOF PANEL • RAKE TRIM i STITCH i -'GABLE - ANGLE FASTENERS .(3.-0".. i ON CENTER [ PURUN ENDWALL 1 ! ENDWALL DETAIL AT RAKE WALL PANEL AT FASTENER AT EACH CRT 0.0SX8 rrSD FASTENER - (OPTIONAL) �12 PER FT.) CRT HEADER TRIM HEADER READ DETAIL WALL PANE(. FILLER � CUP C5C W/ (3) SD iASTOlERS A WALL PAMM CRT / JAMS DETAILS So FASTENER 1 AT EACH CRT �...�,. ....�.........J-.. v NEAII HEiSTRP DOOR JAMB SECTION (HEAD 15 THE SAME RIVETS TRIM wu �. vw%\ ` /=av �GI .ONa1Q aoa errUla ER zwo Onm�w.a..a..ur.vreoaa pa.R.bN aP.r' � o,o m Q�anP-PW[AW Am RW •AHP•L N. QE:'La: WP.WUAW 0�_•�_o_ AM.A.Aa�s�i w L 0001 MINT W IAC•IO • HNNN 0 1'-r THa mIMAL 1 • raXMW 1Nr a q{AW a.ana Nr cA1a TRr•Da WNN wu�Ho COOL PANEL & TRIM NOTES 1. EXCEPT AS SHOWN OR NOTED, TRIM AND FLASHING ENDLAPS SHOULD BE 1". IF TRIM IS LAPPED MORE THAN NECESSARY, THE OUANTITY PROVIDED MAY NOT BE SUFFICIENT TO COMPLETE THE PROJECT. 2. WHEN INSTALLING ROOF SHEETS WITH RIDGE PANELS, IT IS NECESSARY TO RUNE SHEET RIBS ON EACH SIDE OF THE RIDGE. OTHERWISE, THE RIDGE PANELS WALL BE DIFFICULT OR IMPOSSIBLE TO INSTALL PT17 r FASTENERS �(3 PER FOOT) 3/16"X3/4" 1 MASTIC PURUN (MAP) PEAK DETAIL (WITH RIDGE PANEL) SAVE STRUT FASTENERS PM6 GABLE ARGLE (2 PER FLAT) 1/2- naT FASTENERS CLOSURE FUR WSHEI -BASE ANGLE ONLY WTH SEALED I_1 N WALL PANEL - FASTENER — 2 PER FOOT) 1 PER FOOT MSP) BF67T ON CENTER) BY CECO) STANDARD BASE DETAIL ANSI - NOTES: L •RIp fIINR Ma 1P AHWW. rAMAI�o RMxIi- AC• MWnALF�Aa1R1 HINGE —STRIKER JAMBJAMB 1 II1TO1 OI.Q ANO EAIa NAYR URN 0 pr 11aa N•al 1INAI otla •• GfMAIIIL 1pfI ixixt * O - - - LIMWL M0, M.2 Aar •. �UCC BRACE (USE WHEN CRT IS NOT PRESENT) STRIKER .LAMB CLEARANCE DETAIL ®USING MML04 TPLATL DRILL (3) NOOR D RWINT PANIC HARD 1/M' x r DEEP N NN PANG HARDWARE CaC1ETE N AXES M THE MUM OwNE NOTCH TD AMOIOI HRAlIa. IARlIa 1N1.7 TRW FUSING SNIT CUT 10 MEMO 0204 9 NOTE: 1. INSULATION NOT SHOWN FOR CLARITY. 2. MASONRY ANCHORS NOT NRN19HED BY CECO. &{STITCH FASTENERS A NON -SEALED TALL ONE ON AND ONE OETEEN EACH CRT OR 8 -W OR M� UE (2) STITCH FASTENERS BETEEN CRTS) B. SEALED MALL 2'- 0' ON CENTER. 3 16- DIA. MASTIC (OPTIONAL FOR ALED WALL) �l f1�� `STITCH FASTENERS (1 AT ORTS & 1 BETWEEN GIRTS) (EXCEPT 2 BETWEEN GIRTS IF GIRT SPACE IS 6'-0" OR MORE) WALL PANEL�DELAP ME aONE FASTENER PER 3 GIRT OR BASE ANGLE 2 6� GIRT p SIDEWALL CORNER TRIM CORNER TRIM DETAILIM0 (MAP OR MVW) I',TIN000S RIDGE VENT AC�7 9SELECT ON ROOF PITCH SPUCE 'ELEVATION 'GREATER THAN 1:12. DOT THAT RIDGE VENT • MATCHES ROOF PITCH, SCRIBE LINES AND CUT TO ROOF PITCH FASTENERS - (1'-0" ON CENTER) CRIMP ENDS OF ROOF SHEETS i RAIN GUTTER (BLIND RIVET TO VENT) ' \;LO,RESTRIP ' ` PURUN SECTION AT CONTINUOUS VENT -CLOSURE STRIP WITH 3/16" X 3/4' MASTIC (SEE OUTSIDE CLOSURE DETAIL) `-3/16" X 3/4' MASTIC CONTINUOUS VENT INSTALLATION MOSIME R•9WRI REMARK 1 ON STE STORAGE PROCEDURE FOR F•!f0 F1ffRGI.A55 INSULATION INSULATION MATERIAL SHOULD E INSPECTED ON ARRIVAL AT THE JOB SITE TO ENSURE THAT IT 15 EXACTLY AS ORDERED, F THERE 15 ANYIHNG WRONG WIN THE THE INSULATION. IT IS RECOMMENDED THAT THE- ERECTOR -NOT INSTALL IT AND CONTACT THE SUPPLIER IMMEDIATELY. 1. THE ERECTOR SHOULD~STDRE THE INSULATION IN A DRY. PROTECTED AREA 2. ALL PACKAGES SHOULD BE ELEVATED ABOVE THE GROUND OR SLAB, PREFERABLE ON A FLAT SURFACE. TO PREVENT CONTACT MIN SURFACE WATER ACCUMULATIONS. SNCE THE VAPOR BARRIER 15 FRAGILE AND SUBJECT TO IMPACT OAMAGL; EXERCISE CARE N HANDLING. 00 NOT ALLOW PACKAGES TO BE THROW( OFF THE SHIPPING VEHICLE, KICKED. OR PLACED MATH SHARP OBJECTS DURING STORAGE. 3. POLY -SAGS SHOULD HAVE HOLES IN EACH END TO AEREATE THE INSULATION. WHEN STORED IN A DRY. PROTECTED AREA, THE ENDS OF THE S11G.S SHOULD BE OPENED TO ALLOW BETTER AIR CIRCULATION. l PACKAGES CAN BE LEFTUNCOVEREDDURING THE DAY, WEATHER PERMITTING. BUT SNOOD BE PROTECTED AT HGHT WTH POLVETHEEINE FILM. CANVAS OR OTHER COVERING. S. F A DRY. PROTECTED AREA IS NOT AVAILABLE AT THE STE. THE ERECTOR SHOULD PLACE THE INSULATION AT THEiEND OF THE BUILDING WHERE THE ROOF SHEETS WILL FIRST BE APPLIED. THIS WILL PROTDE PROTECTION FOR THE REST OF THE MATERIAL UNTIL THE BURRING 15 COMPLETED.( NOTE: TO MINIMIZE THE RISK OF DAMAGE TO THE INSULATION, IT SHOULD BE INSTALLED AS SOON AS POSSIBLE AFTER DELIVERY. 1 GENERALN•"SAn°" NOTE 1. INSULATION BACKING IS (ALWAYS TOWARD THE INSIDE OF THE BUILDING. (MORE: VINYL BACKING BECOMES BRITTLE IN COLD WEATHER SO CARE MUST BE TAKEN IN HAMXNC) 2. BEFORE INSTALLING WALL NSOATION. RECHECK THE AREA FOR P.UMBIESS 3. WALL INSULATION IS SHiVED IN BAGS OF MAXIMUM LEKKT . THE ERECTOR MUST SPUCE THE INSULATION AT ORTSJCi WHENEVER APPLICABLE I. IMPORTANT: F THE BOTTOM EDGE OF nSERGLASS 15 ALLOWED TO TOUCH HORIZGIITAL SURFACE OF CONCRETE NOTCH OR BASE FILASIM MOISTURE WILL 7MCK' UP THE FIBER- GLASS AND REDUCE THE EFiTENCY OF THE INSULATION. IN ADDITION. CORROSION CAN EASILY BEGIN AT BOTTOM EDGE OF PANEL ONCE WATER HAS ENTERED THE INSULATION. INSULATION NOTES AC10 E FASTENER PER CRT UP OR GIRT WALL PANEL I I/J• GIRT CLOSURE (SOON a WHAT HEADER FLASHING D 1/4" K 1/2" HEX NEAR BOLTS ODOR HEAD SECTION AT DOOR HEAD HAW 1I a MT Para+ PNR FASIDQS O FR RKTAND) Omm RETn1O (WTI Mma2^.:r NVU 6) "plc Rw PANEL aISOE CLODMW (Ir x aµ' MASIIC (AO/OAlge) vor PALL TnpLFLAT 3 INS2 - ST .. RUN OF NSie •TON�M�eF A STARTER RUN OF INSULATION ((N6' WOE FOR ROBED ROOF AND 36' MADE FOR CUP) IS PLACED ON THE ROOF WTH ONE EDGE ON THE CABLE ANGLE AFTER FEW RUN OF SHEETS IS COMPLETE, ADDITIONAL. INSULATION CAR BE INSTALLED. ALWAYS KEEP FORWARD EDGE OF DMILATION JUST AHEAD OF THE LEADING EDGE OF ROOF PANELS. SEE ERECTION Ow5 FOR PANEL GVEINING PT9 RIBBED ROC' PANEL - NDTF LAVE TRIM. FASTENERS () I GUTTER 3-0.._w�.. EAVE STRUT PANEL TT R EAE� GUTTER (STANDARD) GUTTER CLIP X-O" ON CENTER AT PANEL 9DELAP, 'PT12 (2'.-6' O.C. AT CUP) 2 FASTENERS CUP TO ROOF. AS ROOF)FAS7ErQt5 SAME mp (s/•r NOTE: TETHER aro aTiER I 1/A' COLOR OF GUTTER) -T CUTTER ENO CAP IS NOT REOD W/STARDARD \ CORNER CLOSURE ROOF PANELS CUTTER ENDCM SEAL will TUBE CAULKING AND 11 BLIND . RIVETS GU ND RIVET `WALL PANEL 3 D/16' RAKE TRAP GUTTER CORNER w CLOSURE �r CUT'1• IN BOTTOM, OF CUTTER BEND (11 BUD RIVETS PER SIDE) SAVE TRIM DOWNSPOUT F�ECTION STITCH FASTENERS LTUBE CAULKING ENDAPS (16 BLIND RIVETS) OOWSPOUT STRAP V((MANE PER OOWNSPOUT GYON) NOTE NSTALL (6) BIND RIVETS AT - ALL DOWNSPOUT AND FITTING JOINTS. GUTTER AND DOWNSPOUT INSTALLATION RIBBED ROOF PANELS INSULATION lv� 1y .. , / _ _ �'�' •:LI e v+� �,L LAVE STRUT 2c)STRUT FLASHING �O�INSULA�ON DETAILS • "s�Al: �-• 'A MY DA IE SOUIIERV REGION JOB NO. DBL 1214101 Ceco Building Systems Pa am ER 911 ram 10-8-19770-1 £CKED OA 1E D Robertson Coco company COL ISSISSFR 397OLT JAIAPP 12/01 - MEMBER GINEER DAZE CUSTOMER. RF CONCREIE CONST INC SNIP . )a BRYAN mail —_ M B M A 6LH 12/01 664 OLD DIX/E HIGHWAY 159W. 65 PARK LANE , SCALE VERO BEACH. a 32962 FT PIERCE, FL o. wEEr NOlt ST.LUCIE COUNTY A E4 4