Loading...
HomeMy WebLinkAboutLetter; Stormwater RequirementBOARD OF COUNTY COMMISSIONERS N ti� PUBLIC WORKS DEPARTMENT �OR10 FAX# (561)462-1735 TRANSMISSION COVER FORM 1 _ ff�-A- N -�� Avg DEPARTMENT: INCLUDINGNO. OF PAGES SENDER: rw JOHN D. BRUHN, District No. 1 • DOUG COWARD, District No. 2 • PAULA A. LEWIS, District No. 3 • FRANNIE HUTCHINSON, District No. 4 • CLIFF BARNES, District No. 5 County Administrator - Douglas M. Anderson 2300 Virginia Avenue • Ft. Pierce, FL 34982 Public Works: (561) 462-1485 • FAX (561) 462-2362 Division of Engineering: (561) 462-1707 Fax 462-2362 • Division of Road & Bridge: (561) 462-2511 FAX 462-2363 Division of Solid Waste: (561) 462-1768 FAX 462-6987 Division of Building & Inspections: (561) 462-1553 Fax 462-1735 • TDD (561) 462-1428 Kathy-*Cicio - Re: Stormwater requirements Page 1 From: Raymond Wazny To: Pendarvis, Linda Date: 3/14/02 2:22PM Subject: Re: Stormwater requirements Linda, I believe we determined that those projects which were in an industrial park which already had overall Stormwater approval for the park only needed to provide us with an exemption document from SFWMD. With a SFWMD exemption a stormwater fee would not be charged. However, a letter from the project engineer stating that the project is exempt is not acceptable, we will need a SFWMD exemption notification. >>> Linda Pendarvis 03/14/02 12:OOPM >>> We have Polymeric which is adding a 6000 sq ft building to their site. this site is Bryan Hacht on West Park Lane off of Orange Ave. Are they required to get a Stormwater permit from us? Their engineer gave us a letter saying they are exempt from South Florida Water Management but do they still need to get something from us? We also have Affordable Storage on US1 doing Phase 2 and Phase 4 on their approved site plan. Do they need stormwater approval from us or does their orginal approval cover the whole site plan. I asked Tony and he isn't quit sure if one approval carries over to the next. CC: Dennis Murphy; Kathy Cicio; Tony Giardino Kathy'Cjcio - Stormwater requirements Page 1 From: Linda Pendarvis To: Raymond Wazny Date: 3/14/02 12:OOPM Subject: Stormwater requirements We have Polymeric which is adding a 6000 sq ft building to their site. this site is Bryan Hacht on West Park Lane off of Orange Ave. Are they required to get a Stormwater permit from us? Their engineer gave us a letter saying they are exempt from South Florida Water Management but do they still need to get something from us? We also have Affordable Storage on LIS1 doing Phase 2 and Phase 4 on their approved site plan. Do they need stormwater approval from us or does their orginal approval cover the whole site plan. I asked Tony and he isn't quit sure if one approval carries over to the next. CC: Kathy Cicio; Tony Giardino HP Fax Series 900 Plain Paper Fax/Copier Last Fax Date Time Twe Identification Mar 20 8:56am Sent 817725673263 Result: 'OK - black and white fax Fax History Report for Building Zoning SLC 561 462 1735 Mar 20 2002 8:57am Duration Pages Result 0:51 2 OK