HomeMy WebLinkAboutLift DSMOUNTING OPTIONS:
PILING MOUNT SIpE MOUNT
5K - 24K LIFTS 5K - 16K LIFTS
7tB1
1 MOUNT NARDWARE5/8" X
PILING DIA. DEr RMINED 8Y
(All 2X 1 /2" SS LAG 11OLT CONTRACTOR 2X 1/2'X 2 SS
2' MIN. LENGTH HENBOLT W/ LOCKS AND
(B i} V 1/2"SS HEX NUT NUTS
NOTE LOAD SHOULD BE Ev'ENLy
D'STRIBUIED By POSITIONING THE CENTER
CENT ER Of THE
LLIIFTING BEAMS AS SHOWN N THE ILLUSTRATION
CABLE ROUTING:
SINGLE PULL DOUBLE: PULL TRIPLE PULL
5K - 7K LIFTS 1 QK - 16K LIFTS 2OK - 24K
D D LIFTS D
o
v
CDs t: recfFIcToles
4 PILING BOAT LIFT SPECIFICATION SFIEET
2018 TOP BEAM A CRADLE BEAM BUNKS DRIVE DRIVE MINIMUM
) (a) I C) CABLE ESIZED) RI H.P. MOTOR (F) SHAFT PILING
(SIZE &QTY..
5,0001.0. 5" CHANNEL X 12'6' 4" X 6" X 10'
7,000 LB. 6" CHANNEL X 12' 6" 4" X 6" X 12' 6"
1
4
10,000 LB.00
7" CHANNEL X 12'6' 15' X 8" X 12' 6"
113,000 LB..
116,000 LB. 18" CHANNEL X 12'6" 16" X 10" X 14'
120,000 LB.
9" CHANNEL X 14'6"
124,000 LB.
6"X10 "X15'
7"x12"X16'
5K -24K 4 POLE BOAT LIFT
ENGINEERING SHEET
Al ENGINEERING I I
SCALE ASNOTEo ACC 1T2A 1 SHEET 1 OF 1
0
ry
5/16" SS 7/19
(.313) SINGLE
PULL
5/16" SS 7/19 5
(.313) DOUBLE o
PULL
u�
cT
5/16" SS 7/1.9
(.313) TRIPPLE
PULL
PH: 800-325-1116
FAX:252-747-4377
T IDETAMER=M
P.O. BOX 111$
SNOW HILL, NC 26580
ROPOVARY AND
CfJN MOML
THE 14MMATION CONTAffD IFi
THIS ITT AWlHG 5 THE SOLE
PTtoPETm OF iTQE TAMAt
R'!;'A15T'RIFS. ANY RET'Rad1CT1044 P:,
pATiT OTt AS A WHDiiE 1Y11Fi(,fIT THE i
WRH1Tfi PERAHSSWN OFTIDE TAk*k
WOUSTRB S PROHOTED,
3/4 M.P. (CITY. 2)
220V4.9A EACH
1 H.P. (QTY. 2)
220V 6.8A EACH
3/4 H.P. (QTY. 2)
220V 4.9A EACH
1 H.P. (QTY. 2)
220V 6.8A EACH
3/4 H.P. (QTY. 2)
220V 4.9A EACH
1 H.P. (QTY. 2)
220V 6AA EACH
0
N
g" (QTY. 4 )
10" (QTY. 4)
Paul
Welch
�1yILUI y y�u
by Pau Welch
Date: 20.10.16
15:30: , 9 -04'00'
PAUL WELCH INC I
`aE'CMAAUCAL FLE'CTRICAL. CrV7L ENGfNE MNG
r 1984 S. W BIL TAfOREST. Sur7F#114
PORTSAINTLucm, FL 34984
PAUL W'ELCP4 P.E: FIA REG No. 29945