Request for 30-Day Temporary Power Release
Permit Number: (;�QjO9) — OS 19
Project Address: $toga LUne.SUfYle -CCV
THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE
ABOVE DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR
THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION FOR FINAL
INSPECTION. IN CONSIDERATION OF APPROVAL OF THE REQUEST WE HEREBY
ACKNOWLEDGE AND AGREE AS FOLLOWS:
1. This temporary power release Is requested for the above stated purpose only, slid there will be no occupancy
of any type, other than that permitted by construction during this time period.
2. As witness by our signatures, we hereby agree to abide by all terms and conditions or this Agreement, including
Building Division Policy, which is Incorporated herein by reference.
3. All conditions and requirements listed In the attached document entitled "Requirements for 30 Day Power for
4. Testing" have been fulfilled and the premise Is ready for compliance inspection.
5. All requests for An extension beyond 30 days must be made In writing to the Building Official stating the reason
for the request. Power may he removed from tl+c site and/or a Stop Work Order Issued If the Final Inspection
has not been approved within 30 days. A fee of S 100,00 will be raqulred to lift the Stop Work Order,
WE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, ST. LUCIE COUNTY, AND
THEIR EMPLOYEES FROM ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE
WHICH MAY ARISE NOW OR IN THE FUTURE OUT OF THIS TRANSACTION, INCLUDING
ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE DISCONNECTION OF
ELECTRICAL POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT.
Af le nJ4YEA,5 s7`cvr, C3�t RS
Sl.(:PDSD Re•ned IIa11V2010
St. Luele County
Bullding and Zoning Department
Requirements for 30 Day Power for Testing
1. Forni entitled "Request for, 30-Day Temporary Power Release" must be fully executed and posted
in the Building Department record files prior to inspection.
il. Inspection Requirements:
1. Address numbers shall be posted per county Ord, No. 7.05.09.
2. All entrances, exits, windows and garage doors must he lockable.
3. All circuits on exterior shall be terminated in a box with weatherproof cover. The same
applies to a disconnect, If circuits are at or above 7'6" fiom grade they may be capped with
wire nuts and taped.
4• All breakers must be installed. Any blank space must be closed by a breaker or approved
filler plates.
S. Interior Wiring: All receptacles, light fixtures and fans must be trimmed. Any fixture below
7'6" from the floor or mezzanine that is not available at the time of inspection must have an
lnviso plate installed. Fixtures at or above that height maybe capped with wire nuts and
taped.
6. All smoke detectors must be installed.
7. Kitchen cabinets must be installed; any exception for special conditions or circumstances
must have an approval prior to scheduled inspection.
8• Sewer and water connections must be complete, Only well pumps are excluded from this
requirement.
9. Exterior construction must be complete and weather tight, including stucco, siding, roof and
soffit.
10. Permit work shall be substantially completed except for back orders, paint on exterior, carpet
and/or floor covering, pumps, air conditioner's and driveway.