Component Performance Method for Commercial Buildings
Form 40OB-97
ENERGY EFFICIENCY CODE FOR BUILDING
CONSTRUCTION
Florida Department of Community
Affairs
FLA/COM-97 Version 2.2
PROJECT NAME_COLD AIR
PERMITTING OFFICE:
ADDRESS: _FT PIERCE
_ST. LUCIE COUNTY
CLIMATE ZONE:
6
OWNER: _COLD AIR
PERMIT NO: _00-00
AGENT: IJURISDICTION
NO:_661000
BUILDING TYPE: _Factory - Industrial
CONSTRUCTION CONDITION: New construction
DESIGN COMPLETION: _Finished Building
CONDITIONED FLOOR AREA: _10000.
NUMBER OF
ZONES: 1
MAX. TONNAGE OF EQUIPMENT PER SYSTEM:
15
COMPLIANCE CALCULATION:
r ^'
METHOD B DESIGN
CRITERIA
RESULT
----------------- ------
ENVELOPE PERFORMANCE 34.16
--------
67.29
------
PASSES
OTHER ENVELOPE REQUIREMENTS
PASSES
LIGHTING
INTERIOR LIGHTING 18000.00
18000.00
PASSES
LIGHTING CONTROL REQUIREMENTS
PASSES
HVAC EQUIPMENT
COOLING EQUIPMENT
1. EER 9.20
8.50
PASSES
IPLV 7.50
7.50
PASSES
HEATING EQUIPMENT
1. Et 1.00
N/A
AIR DISTRIBUTION SYSTEM INSULATION REQUIREMENTS
1. Unconditioned Space 6.00
4.20
PASSES
REHEAT SYSTEM TYPES USED
NO REHEAT SYSTEM is USED
WATER HEATING EQUIPMENT
PIPING INSULATION REQUIREMENTS
----------------------------------------------------------------------------
COMPLIANCE CERTIFICATION:
I hereby certify that the plans and
specifications covered by this calcu-
lation are in compliance with the
Florida Energy Efficiency Code.
PREPARED BY:
DATE:
I hereby certify•that this building is
in compliance with the Florida Energy
Efficiency Code.
' OWNER/AGENT:
DATE:
Review of the plans and specifica-
tions covered by this calculation
indicates compliance with the
Florida Energy Efficiency Code.
Before construction i d,
Mbu i i•_ h
SING OFFICIAL:
aAfflEhxr. Awn PF.RMiT MUST B1(EPV0NJW
OR NO INSPECTION WILL BE
I hereby certify(*) that the system design is
Energy Efficiency Code.
' SYSTEM DESIGNER
ARCHITECT
MECHANICAL: rAUL WELCH INC. I
PLUMBING
ELECTRICAL: 20FIT ST, I=WGI�, L 841—A H4
LIGHTING -
compliance with the Florida
INTULTION/STATE
(*) Signature is required where Florida law re%i4es design to be performed
by registered design professionals. Typed nameregistration numbers may
be used where all relevant information is conted on signed/sealed plans.
S
BUILDING ENVELOPE SYSTEMS COMPLIANCE
CHECK
401.------GLAZING--ZONE 1------------------------------------------------ V-
Elevation Type U SC VLT Shading Area(Sgft)
------a------------------ ---- ---- ---- -------------- ----------
North 00 0.01 0 None 0
Total Glass Area in Zone 1 = 0
Total Glass Area = 0
402.------ WALLS --ZONE 1------------------------------------------------ ---
Elevation Type U Insul R Gross(Sgft)
---a-------------------------------------= ----- ------- -----------
North Mtl Bldg wall/R-11 Batt .084 11 2000
South Mtl Bldg wall/R-11 Batt .084 11 2000
East Mtl Bldg wall/R-11 Batt .084 11 500
West Mtl Bldg wall/R-11 Batt .084 11 500
Total Wall Area in Zone 1 = 5000
Total Gross Wall Area = 5000
403. ------ DOORS --ZONE 1----------------------------------------------- ---
Elevation Type U Area(Sgft)
-------------------------------------------------- ----- ----------
North 1-3/4 Steel Door-Fiberglass/Mineral woo 0.60 21
Total Door Area in Zone 1 = 21
Total Door Area = 21
404.------ROOFS--ZONE 1------------------------------------------------ ---
Type Color U Insul R Area (Sgft)
--------------------------------- -- ------ ----------------------
Mtl Bldg Roof/R-19 Batt Medium .051 19 10000
Total Roof Area in Zone 1 = 10000
Total Roof Area = 10000
405.------FLOORS-ZONE 1------------------------------------------------ ---
Type Insul R Area(Sgft)
-----------------------------------------------------------------
Slab on Grade/Uninsulated 0 10000
Total Floor Area in Zone 1 = 10000
Total Floor Area = 10000
406.------INFILTRATION --------------------------------------------------- ---
Infiltration Criteria in 406.1.ABCD have been met. (CHECK
MECHANICAL SYSTEMS
CHECK
------------------------------------------------------------ ---- ---
HVAC load sizing has been performed. (407.1.ABCD)
407.r-----COOLING SYSTEMS----------------------------------------------- ---
Type No Efficiency IPLV Tons
---------------------------- ------------- -------------------
1. Air Cooled ( >= 65,000 Btu/h 1 9.2 0 15.00
408.------HEATING SYSTEMS----------------------------------------------- ---
Type No Efficiency BTU/hr
-------------------------------- ---------------------------
1. Electric Resistance 1 1 50000
409.------ VENTILATION --------------------------------------------------- ---
Ventilation Criteria in 409.1.ABCD have been met. (CHECK
410.-----AIR DISTRIBUTION SYSTEM---------------------------------------- ---
CHECK
------------------------------------------------------------------I----- ---
Duct sizing and design have been performed. (410.1.ABCD)
.AHU Type Duct Location R-value
----------------------------------------------------------------
1. Air Conditioners Unconditioned Space 6
CHECK
------ ------------------------------------------------------------ -----
Testing and balancing will be performed. (410.1.ABCD)
411.-----PUMPS AND PIPING -ZONE -----------------------------------------
.Bas.ic prescriptive requirements in 411.1.ABCD have been met. I
PLUMBING SYSTEMS
411.-----PUMPS AND PIPING -ZONE I ---------------------------------------
Type R-value/in Diameter Thickness
---------------------------------------------------
412. ----- WATER HEATING SYSTEMS -ZONE 1 ----------------------------------
Type Efficiency StandbyLoss InputRate Gallons
------------------------ ------ - --- ---------- ---------- ----------
ELECTRICAL SYSTEMS
c CHECK
413.-----ELECTRICAL POWER DISTRIBUTION---------------------------- -----
Metering criteria in 413.1.ABCD have been met.
414".-----MOTORS --------------------------------------------------- -----
Motor efficiencies in 414.1.ABCD have been met.
415.-----LIGHTING SYSTEMS -ZONE 1------------------------- =-------------
Space Type No Control Type 1 No Control Type 2 No Watts Area(Sgft)
---------- ----------------- ----------------- --- ------ ---------
Reading, T 1 On/Off 24 18000 10000
Total Watts for Zone 1 = 180001
Total Area for Zone 1 = 10000
Total Watts = 18000
Total Area = 10000
CHECK
Lighting criteria in 415.1.ABCD have been met.
------------------------------------------------------------------ -----'
16. Operation/maintenance manual will be provided to owner.(102.1)
-------------------------------------------------------------------------
PROJECT TITLE COLD AIR
BUILDING TYPE Factory - Industrial
BUILDING LOCATION ST. LUCIE COUNTY
BUILDING AREA(ft2): 10000
BUILDING ENVELOPE COMPONENT PERFORMANCE
N NE
WALL
E
ORIENTATION
SE S SW
W
WEIGHTED AVER.
NW DESIGN CRITERIA
WALL
2000
500
2000
500
0.00
0..291
GL.
0
0
10
0
WWR
WWR
SC
0.000
0.000
0.000
0.000
0.00
0.500
PF
0.00
0.00
0.00
0.00
0.00
0.00
VLT
0.00
0.00
0.00
0.00
0.00
N/A
Uof
0.000
0.000
0.000
0.000
0.00
1.150
W Uo
0.08
0.08
0.08
0.08
0.08
0.371
HC
1.00
1.00
1.00
1.00
1.00
1
IP
3
3
3
3
3
N/A
L 0 A D S
TOTA
;HEAT
0.363
0.092
0.412
0.091
0.958<
3.753
COOL
12.606
3.302
14.334
2.956
33.198<
63.536
SUM
12.969
3.394
14.746
3.047
34.156<
67.289
******** PASSES *******
OTHER ENVELOPE REQUIREMENTS
MAXIMUM PERCENTAGE OF ROOF AREA IN SKYLIGHTS: DESIGN CRITERIA
Percentage of Roof Area in Skylights 0.000 = 0.0000
u
MAXIMUM ALLOWABLE Uo:
Roof 0.051 < 0.0868
n
******** PASSES *******
PROJECT TITLE COLD AIR
BUILDING TYPE Factory - Industrial
BUIfLDING LOCATION : ST. LUCIE COUNTY
BUILDING AREA(ft2): 10000
LIGHTING SYSTEM PERFORMANCE
BUILDING DESIGN :
Interior Lighting Power 18000 W 1.80 W/Gross ft2
Exterior Lighting Power 0 W
INTERIOR LIGHTING CRITERIA:
_ Space No.
Type Area Clg Ht Spaces AF UPD PB LPB Total LPB
n
^26 10000.0 10.0 1 1.00 1.80 1.80 18000 18000
Unit Power Density 1.80 W/Gross ft2
-Interior Lighting Power Allowance 18000 W
******** PASSES ********
EXTERIOR LIGHTING CRITERIA:
AREA AREA AREA OR ALLOWANCE
CODE. DESCRIPTION LENGTH WATTS
Exterior Lighting Power Allowance 0.00 W
**** Not Applicable ****
LIGHTING SYSTEM CONTROL REQUIREMENTS:
TOTAL EQUIVALENT
SPACE NO. CONTROLS CONTROL POINTS
NO.' DESCRIPTION AREA TASKS TYPE 1. NO. TYPE.2 NO. DESIGN CRITERIA
26 Reading, T 10000.0 1 On/Off 24 0 24 > 12
******** PASSES ********
PROJECT TITLE COLD AIR
BUILDING TYPE Factory - Industrial
BUILDING LOCATION : ST. LUCIE COUNTY
BUILDING AREA(ft2) : 10000
HVAC SYSTEM REQUIREMENTS:
Cooling System
Type
Measure
#1 #2
Minim.
#1
Minim.
#2
System
Eff.#1
System
Eff.#2
Result
for #1
Result
for #2
Air Cooled.
EER, IPLV
8.50
7.50
9.20
7.50
PASSES
PASSES
Heating System
Measure
Minimum Req.
Efficiency
Result
Ele. Resis.
Et
1.00
N/A
******** PASSES ********
AIR. DISTRIBUTION SYSTEM INSULATION REQUIREMENTS:
Zone # Duct Location Minimum R-Value Design R-Value Result
1. Unconditioned Space 4.20 6.00 PASSES
******** PASSES ********
PROJECT TITLE COLD AIR
BUILDING TYPE Factory - Industrial
BUILDING LOCATION : ST. LUCIE COUNTY
BUILDING AREA(ft2): 10000
WATER HEATING SYSTEM REQUIREMENTS
System Measure Minimum I Maximum I Design I Design Result
PAUL WELCH INC.
Mechanical Electrical • Civil • Engineering
1984 S.W. Biltmore St. #114
Part St. Lucie, FL 34984
Phone (407) 7854888-
FAX (407) 785-9933
date:
ROOM: 0 FriGL PM AREA: I6060 S
sheet —[Of
JOB: GELD NItL
ZONE: 1.
WALL.. ..............
2a00
SF
x:
�.Co4
5 WALL ...............
'LoOa
SF
X
rI.�CQ _
t4120
WALL .............:.
50*
SF
x
`-a(v =
24 a
WALL ...............
.606
SF
x
(�•Siv _
3'L�G
GLASS..............
0
SF,
x
=
GLASS..............
D
SF
X
r =
GLASS ..............
l3
SF
x
_
GLASS ..............
SF
x
ROOF ...................
1dQ
SF
x
rL•2 _
�L Z 0D?1
LIGHTS ..................
1-0a00
W
X
3.41
D
PEOPLE.....................
So
X
(gob =
30600
INFIL (62-89) ..........
100 c>
cfm
x
54 _
aao
Sub
Total
31. duct
losses =
G Cc
TOTAL., =
2 0 G I D I
ST. LUCIE COUN� �I®N
REVIEWED FOR C •
REVIEWED BY ``
.DATE � PLANS AND PERNIIT REM&N JOB