Loading...
HomeMy WebLinkAboutLetter; Relocation of the South End Wall Framing & Wall BracingM L Engineering, Inc. 116-43rd Ave. SW Vero Beach, Florida 32968 (561) 569-1257 Fax: (561) 569-4041 June 5, 2001 Mr. Dennis Grimm, Building Official St. Lucie County Building Department 2300 Virginia Avenue Fort Pierce, Florida 34982 Re: Maverick Boat Company - Phase 4 Addition 3054 Industrial 31st Street Fort Pierce, Florida Engineer's Project No. 99-113 � Dear Mr. Grimm: This letter is written in response to the Building Inspector's question regarding the relocation of the south end wall framing and wall bracing. The addition to the existing office which was permitted and constructed in 1998 was designed with an expandable end wall to the south, in which the pre-engineered rigid frame was designed as a clear span and the end wall framing was noted to be relocated in the future. Please refer to the note on the original documents dated July 1998 which was permitted and constructed, and also a similar note on the more recent Phase 4 addition on sheet S 1 which has also been permitted and constructed, noting that the same end wall to be relocated. J The design criteria has not been changed and the end wall framing was originally designed to support the intended design loads as prescribed by the St. Lucie County Building Department. If all the diagonal wall and roof bracing are in place as designed and specified by the Pre-engineered Metal Building Designer, the location of the overhead doors are incidental and does not affect the performance of the structure. If you have any further questions, please give us a call. Respectfully; Michael A. Lue, -,.E. Consulting Engineer mU JUN 4 2001va� St Lucie County Public Works