HomeMy WebLinkAboutVegetation Removal PermitNOTICE OF
VEGETATION REMOVAL
PERMIT
THE APPLICANT SHALL KEEP THIS PERMIT POSTED ON -SITE AT ALL TIMES DURING LAND
CLEARING.
ERD Permit#: 20201017 Fee: $1,020.00
Building Permit#: 2010-0271 (Building C)
Date Issued: 10/19/2020
Date Expires: Upon completion of work or 10/19/2021, whichever occurs first.
Property Owner: Baron Island Storage, LLC,
Project Location: 9563 South Ocean Drive, Jensen Beach, 34957
Parcel ID#: 4502-212-0001-020-7
Property Size: 1.93 acres
Contractor: Pav-Co Contracting, Inc. (772-286-7385) & Steve Hooks (772-905-8828)
Project Description: Applicant requests a vegetation removal permit to remove invasive vegetation and impact
native palm trees meeting the mitigation threshold outlined in LDC 6.00.05.D for the construction of a storage
facility consisting six (6) buildings (Bldg. A: 2010-0252, Bldg. B: 2010-0267, Bldg. D: 2010-0274, Bldg. E: 2010-
0277, Bldg. F: 2010-0279, Dumpster: 2010-0282). Specifically, forty-four (44) cabbage palms meeting mitigation
threshold outlined in Land Development Code 6.00.05.D, will be impacted due to the proposed development,
requiring mitigation at the 1:1 ratio. No additional native vegetation is permitted to be removed at this time.
Field Notes:
1. HABITAT:
a. Uplands: Non -Residential
b. Wetlands: None identified.
2. WILDLIFE: None Identified.
3. SIGNIFICANT ARCHAEOLOGICAL OR HISTORIC FINDINGS: None Identified.
General Conditions of Issuance:
• The following minimum standards for vegetation protection shall be applied to areas of vegetation designated
to be preserved. A barrier shall be placed and maintained around the tree's perimeter to form a continuous
boundary as specified below subject to restrictions as detailed below:
■ At a minimum distance of either ten (10) feet from the edge of groups of protected vegetation or from the
radius of the dripline from all protected trees, whichever is greater;
■ Protective barriers or protective designations shall remain in place until removal is authorized by SLC
ERD, or until issuance of a certificate of occupancy;
• In the event that any protective barriers are removed or altered and clearing activities are conducted within
an area identified for preserve, SLC ERD is authorized to direct that all land clearing and site alteration
work at the site be stopped until the barriers are restored and any necessary corrective actions taken to
repair or replant any vegetation removed or damaged as a result of these encroachments.
• The preserve areas and tree preservation areas shall be maintained in their natural state, so as not to alter
the water and oxygen content of the soil and impair its function;
• A National Pollutant Discharge Elimination (NPDES) Permit from the Department of Environmental
Protection may be required for construction activities disturbing 1 acre or more. Please visit NPDES
Stormwater Program website at https://floridadep.gov/Water/Stormwater or contact Jose Vega, St. Lucie
County Stormwater Program Coordinator, at 772-462-1668 for more information.
No grade changes or excavation of any sort may be made within the barricaded areas;
• If any excavation or other activities are expected outside of the preserve area or dripline, the roots should
first be pruned (to the depth of required excavation) to sever them cleanly;
• If underground utilities must be routed through a protected root zone area, tunneling under the roots shall be
required;
• If irrigation must be installed, it shall be installed outside of the dripline of all preserve areas and protected
trees;
• No fill material, construction material, concrete, paint, chemicals, or other foreign materials shall be stored,
deposited or disposed of within a vegetation preservation area;
• No signs, permits, wires, or other attachments shall be affixed or attached to protected vegetation;
• No equipment, including passenger vehicles, shall be driven, parked, or stored or repaired within designated
vegetation preservation areas.
****ANY NATIVE VEGETATION DESTROYED OR DAMAGED OUTSIDE THE LIMITS OF THIS PERMIT, DUE TO CONSTRUCTION ACTIVITIES OR
FILL PLACEMENT, SHALL BE MITIGATED AT A RATIO OF 4:1 (4 INCHES OF REPLANTING FOR EACH INCH DESTROYED OR DAMAGED) ****
Post Clearing Requirements:
1. Mitigation: Mitigation for the impacted forty-four (44) cabbage palms will be met via onsite planting at the
required 1:1 ratio.
2. Landscaping: Landscape shall be in compliance with the approved landscape plan prepared by Redtail.
PLEASE NOTE:
• THIS IS NOT AN AUTHORIZATION TO PLACE FILL ON OR RE -GRADE PROPERTY.
• PLEASE CONTACT A PROFESSIONAL SURVEYOR TO DETERMINE IF YOUR PROPERTY IS AFFECTED BY OR LIES WITHIN A
FLOODPLAIN.
• THE APPLICANT SHALL KEEP THIS EXEMPTION POSTED ON -SITE AT ALL TIMES DURING LAND CLEARING.
• THE PROPERTY OWNER AND/OR AGENT SHALL BE RESPONSIBLE FOR OBTAINING ALL APPLICABLE STATE AND/OR FEDERAL