HomeMy WebLinkAboutEnergy CodeComponent Performance Method for Commercial Buildings Form 400B-97
ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Community Affairs
FLA/COM-97 Version 2.2
PROJECT NAME_MAVERICK BOATS
ADDRESS: _FT. PIERCE
OWNER:.
AGENT:
MAVERICK BOATS
PERMITTING OFFICE:
_Fort Pierce
CLIMATE ZONE: 6
PERMIT NO: _99-0000
JURISDICTION NO:_661100
BUILDING TYPE: _Business (Office)
CONSTRUCTION CONDITION: New construction
DESIGN COMPLETION: _Finished Building
CONDITIONED FLOOR AREA: _9480
MAX. TONNAGE OF EQUIPMENT PER SYSTEM: 1
COMPLIANCE CALCULATION:
NUMBER OF ZONES: 1
METHOD B
DESIGN
CRITERIA
RESULT
-----------------
ENVELOPE PERFORMANCE
------
38.74
----
70.87
PASSES
OTHER ENVELOPE REQUIREMENTS
PASSES
LIGHTING
INTERIOR LIGHTING
17000.00
19166.20
PASSES
LIGHTING CONTROL REQUIREMENTS
PASSES
HVAC EQUIPMENT
COOLING EQUIPMENT
9.00
7.60
PASSES
1. HER
HEATING EQUIPMENT
N/A
1. Et
1.00
AIR DISTRIBUTION SYSTEM INSULATION REQUIREMENTS
PASSES
, 1. Unconditioned Space
6.00
4.20
REHEAT SYSTEM TYPES USED
NO REHEAT SYSTEM is USED
WATER HEATING EQUIPMENT
PIPING INSULATION REQUIREMENTS
-----------------------------------------------------------------
COMPLIANCE CERTIFICATION:
I hereby certify that the plans and
specifications covered by this calcu-
lation are in compliance with the
Florida Energy Efficiency Code.
PREPARED BY:
DATE,
I hereby certify that
in compliance with the
Efficiency Code.
OWNER/AGENT:
DATE:
this building is
Florida Energy
Review of the plans and specifica-
tions covered by this calculation
indicates compliance with the
Florida Energy Efficiency Code.
Before construction is completed,
this building will be inspected
for compliance in' accordance with
Section 553.908, Florida Statutes.
BUILDING OFFICIAL:
DATE:
I hereby certify(*) that the system design is in compliance with the Florida
Energy Efficiency Code.
SYSTEM DESIGNER nu REGISTRATION/STATE
ARCHITECT :
MECHANICAL:
PLUMBING 1984 S.W. 8 SUITE 114
ELECTRICAL:
LIGHTING r_ D
(*) Signature is required where Florida 1requires design to be performed
by registered design professionals. Typed\games and registration numbers may
be used where all relevant information is contained on signed/sealed plans.
- t,
BUILDING ENVELOPE SYSTEMS
COMPLIANCE
CHECK
401------- GLAZING --ZONE 1------------- ------------------------------------- v-
Elevation Type U SC VLT Shading
Area(Sgft)
South, Commercial 1.31 .01 0 None
375
East Y Commercial 1.31 .01 0 None
180
West Commercial 1.31 .01 0 None
105
Total Glass Area in Zone 1 =
660
Total Glass Area =
660
402------- WALLS --ZONE 1------------------------------------------------
---
Elevation Type U Insul R
----- -------
Gross(Sgft)
-----------
-----------------------------------------
North Mtl Bldg wall/R-11 Batt .084 11
3950
South Mtl Bldg wall/R-11 Batt .084 11
3950
East Mtl Bldg wall/R-11 Batt .084 11
1500
West Mtl Bldg wall/R-11 Batt .084 11
1500
Total Wall Area in Zone 1 =
10900
Total Gross Wall Area =
10900
403.------DOORS--ZONE 1------------------------------------------------
---
Elevation Type U
-----
Area(Sgft)
----------
---------------------------------------------------
North 1-3/4 Steel Door-Fiberglass/Mineral woo 0.60
21
Total Door -Area in Zone 1 =
21
Total Door Area =
21
404------- ROOFS--ZONE.1------------------------------------------------
---
Type Color U Insul R
------ ------------
Area(Sgft)
----------
------------------------------------
Mtl Bldg Roof/R-19 Batt Medium .051 19
9480
Total Roof Area in Zone 1 =
9480
" Total Roof Area =
9480
405.--- FLOORS -ZONE 1------------------------------------------------
---
Type Insul R
-------------------------------------------------------
Area(Sgft)
----------
Slab on Grade/Uninsulated 0
9480
Total Floor Area in Zone 1 =
9480
., Total Floor Area =
9480
406------- INFILTRATION ----------------------------- ---------------------
---
CHECK
• Infiltration Criteria in 406.1.ABCD have been met.
I
MECHANICAL SYSTEMS
CHECK
HVAC load sizing has been performed. (407.1.ABCD)
407------- COOLING SYSTEMS----------------------------------------------- ---
.Type No Efficiency IPLV Tons
-=-------------------------- ------------- -------------------
1. Packaged Terminal Unit 4 9.0 0 10.00•,
408: ------ HEATING SYSTEMS----------------------------------------------- --
Type No Efficiency BTU/hr,
r
------------- ------------------- ---------------------------
.1. Electric Resistance 4 1 62840
409------- VENTILATION --------------------------------------------------- ---
1CHECK
Ventilation Criteria in 409.1.ABCD have been met.
410 ------ AIR DISTRIBUTION SYSTEM---------------------------------------- ---
CHECK
Duct sizing and design have been performed. (410.1.ABCD) I.
AHU Type Duct Location R-value
---------------------------------------------------------------
1.-Packaged Constant Volume Unconditioned Space 6.
CHECK
=-- '- ---------I----- ---
Testing and balancing will be performed.. (410.1.ABCD)
411.-----PUMPS AND PIPING -ZONE -------------------------------- ------ ---
Basic prescriptive requirements in 411.1.ABCD have been met.
PLUMBING SYSTEMS
411.-----PUMPS AND PIPING -ZONE 1--------------------------------------- ---
Type R-value/in Diameter Thickness.
-------------------------------------------------- -
412------ WATER HEATING SYSTEMS -ZONE 1---------------------------------- ---
Type Efficiency StandbyLoss InputRate Gallons
ELECTRICAL SYSTEMS
CHECK
413------ ELECTRICAL POWER DISTRIBUTION---------------------------------- ---
Metering criteria in 413.1.ABCD have been met.
414.-----MOTORS --------------------------------------------------- ----- ---
Motor efficiencies in 414.1.ABCD have been met.
415.-----LIGHTING SYSTEMS -ZONE 1--------------------------------------- ---
.Space Type No Control Type 1 No Control Type 2 No' Watts Area(Sgft)
---------- ----------------- ----------------- --- --- -- ----------
Reading, T 1 On/Off 14 17000 9480
Total Watts for Zone 1 = 17000
Total Area for Zone 1 = 9480
Total Watts = 17000
r Total Area = 9480
CHECK
Lighting criteria in 415.1.ABCD have been met.
--a--------------------------------------------------------------- ----- ---
16. Operation/maintenance manual will be provided to owner.(102.1)
----------------------------------------------------------------------------
PROJECT TITLE MAVERICK BOATS
BUILDING TYPE Business (Office)
BUILDING LOCATION Fort Pierce
BUILDING AREA(ft2): 9480
BUILDING ENVELOPE,COMPONENT PERFORMANCE
WALL ORIENTATION WEIGHTED AVER.
N NE E SE S SW W NW DESIGN CRITERIA
WALL
3950
1500
3950
1500
0.06
0.268
GL
0
180
375
105
WWR
WWR
SC
0.000
0.010
0.010
0.010
0.01
0.500
PF
0.00
0.00
0.00
0.00
0.00
0.00
VLT
0.00
0.00
0.00
0.00
.0.00
N/A
Uof
0.000
1.310
1.310
1.310
0.84
1.150
W Uo
0.08
0.08
0.08
0.08
0.08
0.371
HC
1.00
1.00
1.00
1.00
1.00
1
IP
2
2
2
2
2
N/A
L O A D S-TOTAL-
HEAT
0.229
0.240
0.573
0.179
1.220<
3.323
COOL
13.409
5.063
14.402
4.649
37.523<
67.552
SUM
13.638
5.302
14.975
4.827
38.743<
70.875
******** PASSES *******
OTHER ENVELOPE REQUIREMENTS
MAXIMUM PERCENTAGE OF ROOF AREA IN SKYLIGHTS: DESIGN CRITERIA
Percentage of Roof Area in Skylights 0.000 = 0.0000
n
A
MAXIMUM ALLOWABLE Uo:
Rooff 0.051 < 0.0868
******** PASSES *******
f
PROJECT TITLE MAVERICK BOATS
BUILDING TYPE Business (Office).
BUILDING LOCATION :' Fort Pierce
BUILDING AREA(ft2): 9480
LIGHTING SYSTEM PERFORMANCE
BUILDING DESIGN :
Interior Lighting Power
17000
W 1.79 W/Gross ft2
Exterior Lighting Power
0
W
INTERIOR LIGHTING CRITERIA:
. Space No.
Type Area Clg Ht Spaces�� AF
UPD
PB LPB Total LPB_.
,,26 9480.0 25.0 1
1.12
1.80
2.02 19166 19166
Unit Power Density
2.02 W/Gross ft2
Interior Lighting Power Allowance
19166
W
******** PASSES ********
EXTERIOR LIGHTING CRITERIA:
AREA . AREA AREA OR ALLOWANCE
CODE DESCRIPTION LENGTH WATTS
'Exterior Lighting Power Allowance 0.00 W
of
**** Not Applicable ****
LIGHTING SYSTEM CONTROL REQUIREMENTS:
SPACE NO. CONTROLS —
NO. DESCRIPTION AREA TASKS TYPE 1 NO. TYPE 2
TOTAL EQUIVALENT
CONTROL POINTS
NO. DESIGN CRITERIA
26 Reading, T 948.0.0 1 110n/Off 3.41 011 14 > it
******** PASSES ********
PROJECT TITLE MAVERICK BOATS
BUILDING TYPE Business (Office)
BUILDING LOCATION : Fort Pierce
BUILDING AREA(ft2) : 9480
HVAC SYSTEM REQUIREMENTS:
Coaling System
Type
Measure
#1 #2
Minim.
#1
Minim.
#2
System
Eff . ##1
System
Eff . #2
Result
for #1
Result
for #2
Pack. Ter. U
EER
7.60
0.00
9.00
0.00
PASSES
Heating System
Measure
Minimum Reqj
Efficiency
Result
Ele. Resis.
Et
1.00
N/A
******** PASSES ********
AIR DISTRIBUTION SYSTEM INSULATION REQUIREMENTS:
Zone # Duct Location Minimum R-Value Design R-Value Result
1. Unconditioned Space 4.20 6.00 PASSES
******** PASSES ********
PROJECT TITLE MAVERICK BOATS
BUILDING TYPE Business (Office)
BUILDING LOCATION Fort Pierce
BUILDING AREA(ft2) : 9480
WATER HEATING SYSTEM REQUIREMENTS
System Measure Minimum I Maximum I Design I Design Result
PAUE WELCH INC.
Mechanical • Electrical - Civil - Engineering
1984 S.W. Biitmore St. #114
Part St. Lucie; FL 34984
Phone (407) 785-9888
FAX (407) 785-9933
w Y
date: S e p 2 7 1999
sheet of
MANUAL "N"
ROOM: L t7 �� AREA:
HPAC WORK SKEET
g400 `i2ao
= l (o G v S.F. JOB:
- zI C l�
�`� 1
ZONE:
I
WALL ...............
a S D SF x
31 G o
SWALL ...............
3 SF x
7. 34 =
0 �Z
WALL ........:......
(S60 SF
� WALL ...............
(SOD SF x
U
• GLASS...............
SF x
=
�'
41
GLASS..............
SF x
LGLASS ...............
1 SD SF x
GLASS ..............
102 SF x
ROOF..........,........
'14(So SF x
2`2 =
20 t�
LIGHTS .................
53360 W, X
3.41 =
11
PEOPLE..................
lsD x
650 =.
goo
INFIL. (62-89) ,........ , .
3000 cflM x
f;4
Such.
St. duct
Total =
losses =
24- °I 5
TOTAL. _
6Z 3 q. 0 1
?-, oA'r5