Loading...
HomeMy WebLinkAboutEnergy CodeComponent Performance Method for Commercial Buildings Form 400B-97 ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Community Affairs FLA/COM-97 Version 2.2 PROJECT NAME_MAVERICK BOATS ADDRESS: _FT. PIERCE OWNER:. AGENT: MAVERICK BOATS PERMITTING OFFICE: _Fort Pierce CLIMATE ZONE: 6 PERMIT NO: _99-0000 JURISDICTION NO:_661100 BUILDING TYPE: _Business (Office) CONSTRUCTION CONDITION: New construction DESIGN COMPLETION: _Finished Building CONDITIONED FLOOR AREA: _9480 MAX. TONNAGE OF EQUIPMENT PER SYSTEM: 1 COMPLIANCE CALCULATION: NUMBER OF ZONES: 1 METHOD B DESIGN CRITERIA RESULT ----------------- ENVELOPE PERFORMANCE ------ 38.74 ---- 70.87 PASSES OTHER ENVELOPE REQUIREMENTS PASSES LIGHTING INTERIOR LIGHTING 17000.00 19166.20 PASSES LIGHTING CONTROL REQUIREMENTS PASSES HVAC EQUIPMENT COOLING EQUIPMENT 9.00 7.60 PASSES 1. HER HEATING EQUIPMENT N/A 1. Et 1.00 AIR DISTRIBUTION SYSTEM INSULATION REQUIREMENTS PASSES , 1. Unconditioned Space 6.00 4.20 REHEAT SYSTEM TYPES USED NO REHEAT SYSTEM is USED WATER HEATING EQUIPMENT PIPING INSULATION REQUIREMENTS ----------------------------------------------------------------- COMPLIANCE CERTIFICATION: I hereby certify that the plans and specifications covered by this calcu- lation are in compliance with the Florida Energy Efficiency Code. PREPARED BY: DATE, I hereby certify that in compliance with the Efficiency Code. OWNER/AGENT: DATE: this building is Florida Energy Review of the plans and specifica- tions covered by this calculation indicates compliance with the Florida Energy Efficiency Code. Before construction is completed, this building will be inspected for compliance in' accordance with Section 553.908, Florida Statutes. BUILDING OFFICIAL: DATE: I hereby certify(*) that the system design is in compliance with the Florida Energy Efficiency Code. SYSTEM DESIGNER nu REGISTRATION/STATE ARCHITECT : MECHANICAL: PLUMBING 1984 S.W. 8 SUITE 114 ELECTRICAL: LIGHTING r_ D (*) Signature is required where Florida 1requires design to be performed by registered design professionals. Typed\games and registration numbers may be used where all relevant information is contained on signed/sealed plans. - t, BUILDING ENVELOPE SYSTEMS COMPLIANCE CHECK 401------- GLAZING --ZONE 1------------- ------------------------------------- v- Elevation Type U SC VLT Shading Area(Sgft) South, Commercial 1.31 .01 0 None 375 East Y Commercial 1.31 .01 0 None 180 West Commercial 1.31 .01 0 None 105 Total Glass Area in Zone 1 = 660 Total Glass Area = 660 402------- WALLS --ZONE 1------------------------------------------------ --- Elevation Type U Insul R ----- ------- Gross(Sgft) ----------- ----------------------------------------- North Mtl Bldg wall/R-11 Batt .084 11 3950 South Mtl Bldg wall/R-11 Batt .084 11 3950 East Mtl Bldg wall/R-11 Batt .084 11 1500 West Mtl Bldg wall/R-11 Batt .084 11 1500 Total Wall Area in Zone 1 = 10900 Total Gross Wall Area = 10900 403.------DOORS--ZONE 1------------------------------------------------ --- Elevation Type U ----- Area(Sgft) ---------- --------------------------------------------------- North 1-3/4 Steel Door-Fiberglass/Mineral woo 0.60 21 Total Door -Area in Zone 1 = 21 Total Door Area = 21 404------- ROOFS--ZONE.1------------------------------------------------ --- Type Color U Insul R ------ ------------ Area(Sgft) ---------- ------------------------------------ Mtl Bldg Roof/R-19 Batt Medium .051 19 9480 Total Roof Area in Zone 1 = 9480 " Total Roof Area = 9480 405.--- FLOORS -ZONE 1------------------------------------------------ --- Type Insul R ------------------------------------------------------- Area(Sgft) ---------- Slab on Grade/Uninsulated 0 9480 Total Floor Area in Zone 1 = 9480 ., Total Floor Area = 9480 406------- INFILTRATION ----------------------------- --------------------- --- CHECK • Infiltration Criteria in 406.1.ABCD have been met. I MECHANICAL SYSTEMS CHECK HVAC load sizing has been performed. (407.1.ABCD) 407------- COOLING SYSTEMS----------------------------------------------- --- .Type No Efficiency IPLV Tons -=-------------------------- ------------- ------------------- 1. Packaged Terminal Unit 4 9.0 0 10.00•, 408: ------ HEATING SYSTEMS----------------------------------------------- -- Type No Efficiency BTU/hr, r ------------- ------------------- --------------------------- .1. Electric Resistance 4 1 62840 409------- VENTILATION --------------------------------------------------- --- 1CHECK Ventilation Criteria in 409.1.ABCD have been met. 410 ------ AIR DISTRIBUTION SYSTEM---------------------------------------- --- CHECK Duct sizing and design have been performed. (410.1.ABCD) I. AHU Type Duct Location R-value --------------------------------------------------------------- 1.-Packaged Constant Volume Unconditioned Space 6. CHECK =-- '- ---------I----- --- Testing and balancing will be performed.. (410.1.ABCD) 411.-----PUMPS AND PIPING -ZONE -------------------------------- ------ --- Basic prescriptive requirements in 411.1.ABCD have been met. PLUMBING SYSTEMS 411.-----PUMPS AND PIPING -ZONE 1--------------------------------------- --- Type R-value/in Diameter Thickness. -------------------------------------------------- - 412------ WATER HEATING SYSTEMS -ZONE 1---------------------------------- --- Type Efficiency StandbyLoss InputRate Gallons ELECTRICAL SYSTEMS CHECK 413------ ELECTRICAL POWER DISTRIBUTION---------------------------------- --- Metering criteria in 413.1.ABCD have been met. 414.-----MOTORS --------------------------------------------------- ----- --- Motor efficiencies in 414.1.ABCD have been met. 415.-----LIGHTING SYSTEMS -ZONE 1--------------------------------------- --- .Space Type No Control Type 1 No Control Type 2 No' Watts Area(Sgft) ---------- ----------------- ----------------- --- --- -- ---------- Reading, T 1 On/Off 14 17000 9480 Total Watts for Zone 1 = 17000 Total Area for Zone 1 = 9480 Total Watts = 17000 r Total Area = 9480 CHECK Lighting criteria in 415.1.ABCD have been met. --a--------------------------------------------------------------- ----- --- 16. Operation/maintenance manual will be provided to owner.(102.1) ---------------------------------------------------------------------------- PROJECT TITLE MAVERICK BOATS BUILDING TYPE Business (Office) BUILDING LOCATION Fort Pierce BUILDING AREA(ft2): 9480 BUILDING ENVELOPE,COMPONENT PERFORMANCE WALL ORIENTATION WEIGHTED AVER. N NE E SE S SW W NW DESIGN CRITERIA WALL 3950 1500 3950 1500 0.06 0.268 GL 0 180 375 105 WWR WWR SC 0.000 0.010 0.010 0.010 0.01 0.500 PF 0.00 0.00 0.00 0.00 0.00 0.00 VLT 0.00 0.00 0.00 0.00 .0.00 N/A Uof 0.000 1.310 1.310 1.310 0.84 1.150 W Uo 0.08 0.08 0.08 0.08 0.08 0.371 HC 1.00 1.00 1.00 1.00 1.00 1 IP 2 2 2 2 2 N/A L O A D S-TOTAL- HEAT 0.229 0.240 0.573 0.179 1.220< 3.323 COOL 13.409 5.063 14.402 4.649 37.523< 67.552 SUM 13.638 5.302 14.975 4.827 38.743< 70.875 ******** PASSES ******* OTHER ENVELOPE REQUIREMENTS MAXIMUM PERCENTAGE OF ROOF AREA IN SKYLIGHTS: DESIGN CRITERIA Percentage of Roof Area in Skylights 0.000 = 0.0000 n A MAXIMUM ALLOWABLE Uo: Rooff 0.051 < 0.0868 ******** PASSES ******* f PROJECT TITLE MAVERICK BOATS BUILDING TYPE Business (Office). BUILDING LOCATION :' Fort Pierce BUILDING AREA(ft2): 9480 LIGHTING SYSTEM PERFORMANCE BUILDING DESIGN : Interior Lighting Power 17000 W 1.79 W/Gross ft2 Exterior Lighting Power 0 W INTERIOR LIGHTING CRITERIA: . Space No. Type Area Clg Ht Spaces�� AF UPD PB LPB Total LPB_. ,,26 9480.0 25.0 1 1.12 1.80 2.02 19166 19166 Unit Power Density 2.02 W/Gross ft2 Interior Lighting Power Allowance 19166 W ******** PASSES ******** EXTERIOR LIGHTING CRITERIA: AREA . AREA AREA OR ALLOWANCE CODE DESCRIPTION LENGTH WATTS 'Exterior Lighting Power Allowance 0.00 W of **** Not Applicable **** LIGHTING SYSTEM CONTROL REQUIREMENTS: SPACE NO. CONTROLS — NO. DESCRIPTION AREA TASKS TYPE 1 NO. TYPE 2 TOTAL EQUIVALENT CONTROL POINTS NO. DESIGN CRITERIA 26 Reading, T 948.0.0 1 110n/Off 3.41 011 14 > it ******** PASSES ******** PROJECT TITLE MAVERICK BOATS BUILDING TYPE Business (Office) BUILDING LOCATION : Fort Pierce BUILDING AREA(ft2) : 9480 HVAC SYSTEM REQUIREMENTS: Coaling System Type Measure #1 #2 Minim. #1 Minim. #2 System Eff . ##1 System Eff . #2 Result for #1 Result for #2 Pack. Ter. U EER 7.60 0.00 9.00 0.00 PASSES Heating System Measure Minimum Reqj Efficiency Result Ele. Resis. Et 1.00 N/A ******** PASSES ******** AIR DISTRIBUTION SYSTEM INSULATION REQUIREMENTS: Zone # Duct Location Minimum R-Value Design R-Value Result 1. Unconditioned Space 4.20 6.00 PASSES ******** PASSES ******** PROJECT TITLE MAVERICK BOATS BUILDING TYPE Business (Office) BUILDING LOCATION Fort Pierce BUILDING AREA(ft2) : 9480 WATER HEATING SYSTEM REQUIREMENTS System Measure Minimum I Maximum I Design I Design Result PAUE WELCH INC. Mechanical • Electrical - Civil - Engineering 1984 S.W. Biitmore St. #114 Part St. Lucie; FL 34984 Phone (407) 785-9888 FAX (407) 785-9933 w Y date: S e p 2 7 1999 sheet of MANUAL "N" ROOM: L t7 �� AREA: HPAC WORK SKEET g400 `i2ao = l (o G v S.F. JOB: - zI C l� �`� 1 ZONE: I WALL ............... a S D SF x 31 G o SWALL ............... 3 SF x 7. 34 = 0 �Z WALL ........:...... (S60 SF � WALL ............... (SOD SF x U • GLASS............... SF x = �' 41 GLASS.............. SF x LGLASS ............... 1 SD SF x GLASS .............. 102 SF x ROOF..........,........ '14(So SF x 2`2 = 20 t� LIGHTS ................. 53360 W, X 3.41 = 11 PEOPLE.................. lsD x 650 =. goo INFIL. (62-89) ,........ , . 3000 cflM x f;4 Such. St. duct Total = losses = 24- °I 5 TOTAL. _ 6Z 3 q. 0 1 ?-, oA'r5