Loading...
HomeMy WebLinkAbout30 day for test 08-19-'20 09:30 FROM- 7728787656 T-186 P0001/0001 F-491 Plelrm A Mv.e[Qpment Services 801100ni&Code AegulAtion Division 231DO V11xginia Ave • b Fort'Piercie; FL 34982 772-462-2165 Fax 772-462-6443 Request for 30-Day Temporary Power Release Date. \�� Permit Nombe: ` a Project Addtss: ., THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY(30) DAYS, FOR THE PURPOSE OF TESTING SYS r:MS AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF THE REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS: 1. This temporary power release is requested for the above stated purpose only,and here wllf be no occupancy of any type, other than that permitted by construction during this time period. 2. As witness by our signatures,we hereby agree to abide by all terms and conditions of this agreement, including Building Division Policy,which is incorporated herein by reference. 3. All conditions and requirements listed in the attached document entitled"Requirements for 30 Day Power for Testing"have been fulfilled and the premise is ready for compliance inspection, 4- All requests for an extension beyond 30 days must be made in writing to the Building Offidal stating the reason for the request. Power may be removed from the site and/or a Stop Work Order issued if the Final Inspection has not been approved within 30 days. A fee of$100.00 will be required to lift the Stop Work Order. WE HEREBY RELEASE AND AGREE TQ HOLD HARMLESS, ST. LUCIE COUNTY, AND THEIR EMPLOYEES FROM ALL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE DISCONNECTION OF ELECTRICAL POWER IN THE EVENT flF VIOLATION OF THIS AGREEMENT, <a-V e �� OWNER SIGNATUR -- DA GEN �CIGWTRACFDRRE DATE ELECTRICAL CONTRACTOR SIGNATURE DATE