Loading...
HomeMy WebLinkAboutIKO NOAMkoProfessional F SCIS Home Log in I User RegiStratiOn : Hot Topi6 i Submit Surcharge Stats & Facts Publications Contact Us ! BCIS Site Map I Links Search Florida 01m, Product Approval USER: Public User Product Aooroval Menu > Product or Aoollcation Search > AOollcation List > Application Detail FL # Application Type Code Version Application Status Comments Archived Product Manufacturer Address/Phone/Email Authorized Signature Technical Representative Address/Phone/Email Quality Assurance Representative Address/Phone/Email Category Subcategory Compliance Method Certification Agency validated By Referenced Standard and Year (of Standard) Equivalence of Product Standards Certified By FL7006-R10 Revision 2017 Approved *Approved by DBPR. Approvals by DBPR shall be reviewed and ratified by the POC and/or the Commission if necessary. IKO industries Ltd 40 Hansen Road South Brampton, NON -VS L6W 3114 (905) 457-2880 Ext4581 william.liu@iko.com William Liu william.liu@iko.com Bab Metz REMCO of Pinellas 456 Avila Circle NE Saint Petersburg, FL 3703 (727) 776-5261 rmetz001@tampaba .rr.com Don Shaw IKO Industries LTD 120 Hay Rd. Wilmington, DE 19808 (717) 579-6706 don.shaw@iko.com Roofing Asphalt Shingles Certification Mark or Listing FM Approvals Locke Bowden P.E. Validation Checklist - Hardcopy Received Standard ASTM D3161 modifi d to 110 mph ASTM D3462 ASTM D7158 Class ASTM E108 Year 2016 2010 2011 2011 littps://www.tloridabuilding.orglprlpr_app_dtl.aspx?param=wGEVXQwtDgse7mYBd2b3 ... 7/21 /2020 Florida Building Code Online Page 2 of 3 Product Approval Method Method 1 Option A Date submitted 10/08/2017 Date Validated 10/30/2017 Date Pending FBC Approval Date Approved 11/01/2017 C.,m.n�ev of 0-4—rc FL # Model, Number or Name Description 7006.1 Cambridge, Cambridge HD, Biltmore and Biltmore HD Laminated architectural fiberglass asphalt shingle manufactured at IKO's Kankakee, IL; Hawkesbury, Ont.; Wilmington, DE; Sylacauga,AL and Toronto, Ont. plants Limits of Use Approved for use in HVHZ: Yes Approved for use outside HVHZ: Yes Impact Resistant: N/A Design Pressure: N/A Other: Certification Agency Certificate F1.7006 R10 C CAC Letter ASTM D3161 letter - (9-26- 2017) from FM_pdf FL7006 R10 C CAC Letter ASTM D3462 letter - (9-26- 2017).pdf FL7006 Rio C CAC Letter - ASTM F108 letter - (9-26- 2017).odf Quailty Assurance Contract Expiration Date 12/31/2020 Installation Instructions FL7006 R10 II IKO-187-02-01 Letter - Installation Instructions for FBC FL7006. di Verified By: Duc T Nguyen 65034 Created by Independent Third Party: No Evaluation Reports Created by Independent Third Party: 7006.2 Hip and Ridge 12 Cap This is a 12" x 12" fiberglass asphalt shingle used to cover the hip and/or ridge of an asphalt shingle roof system manufactured at IKO's Kankakee, IL, Toronto, Ont. and Brampton, Ontario plants. Limits of Use Approved for use in HVHZ: Yes Approved for use outside HVHZ: Yes Impact Resistant: N/A Design Pressure. N/A Other: Certification Agency Certificate FL7006 R10 C CAC ASTM D 3462 - Shin_letter Surveillance Audit Location - (6-28-2017).pdf FL7006 Rl0 C CAC Letter - ASTM D3161 letter - (9-26- 2 17 fr m FM. df FL7006 R10 C CA Letter - ASTM D3462 letter 9-26- 2017).ndf FL7006 R10 C CAC Letter - ASTM E108 letter 9-26- 2017).pdf Quality Assurance Contract Expiration Date 12/31/2020 Installation Instructions FL7006 R10 II Hip and Ridge Cag Shin le Installation Instructions.ndf FL7 Ofi R10 II IKO 1 7 2-01 Lett r In C Ilation Instructions for FBC FL7006.odf Verified By: Duc T Nguyen PE 65034 Created by Independent Third Party: No Evaluation Reports Created by Independent Third Party: 70D6.3 Leading Edge Plus Asphalt Shingle Starter Strip Limits of Use Approved for use in HVHZ: Yes Approved for use outside HVHZ: Yes Impact Resistant: N/A Design Pressure. N/A Other: 7006.4 Marathon Plus AR, Superglass Plus AR L- one piece fiberglass asphalt shingle used as a starter strip at the bottom of a roof system manufactured in Brampton and Hawkesbury, Ontario plants Certification Agency Certificate FL7006 R10 C CAC Letter - ASTM D3161 letter - (9-26- 20171 from FM. df FL7006 R10 C CAC Letter - ASTM D3462 letter 9-26- 2017 . df FL7006 R10 C CAC Letter - ASTM E108 letter 9-26- 20171.odf Quality Assurance Contract Expiration Date 12/31/2020 Installation Instructions FL7006 R10 II IKO-187-02-01 Letter - Installation Instructions for FBC FL7006.pdf FL7006 R10 I1 Roofing- Produ cts- eadin-Ed a-Plus- Application-EN(1).pdf Verified By: Duc T Nguyen PE 65034 Created by independent Third Party: No Evaluation Reports Created by Independent Third Party: 3 tab fiberglass asphalt shingle manufactured at IKO's Brampton, Ontario, Hawkesbury Ont., Toronto, Ont.; Sylacauga, AL and Kanakakee, IL plants https:/Iwww.floridabuilding.org/pr/pr_app_dtl.aspx?param=wGEVXQwtDgse7mYB d2b3 ... 7/21 /2020 Florida Building Code Online Page 3 of 3 Limits of Use Approved for use in HVHZ: Yes Approved for use outside HVHZ: Yes impact Resistant: N/A Design Pressure: N/A Other: Certification Agency Certificate F1 7006 R10 C CAC Letter - ASTM D3161 I tter 9-26- 2017 from FM. df FL70o6 RIO C CAC Letter - ASTM D3462 letter 9-26- 2 17 . f FL7006 R10 C CAC Letter - ASTM E108 letter - l9-26- 20171.pdf Quality Assurance Contract Expiration Date 12/20/2020 Installation Instructions FL7006 RIQ II IKO-187-02-01 Letter - Installation Instructions for FBC FL7006.Ddf Verified By; Duc T Nguyen 65034 Created by Independent Third Party: No Evaluation Reports Created by Independent Third Party: back Next Contact Vs :: 760E Blair Stone Road,Tallahassee FL32399 Phone: 85 -4 87-1824 The State of Florida is an AA/EEO empEoyer. r„nvnnht 2007-20F3 State of FEorida._ :: privacy Statement u: Accessibility Statement :: Refund Statement Under Florida kaw, email addresses are public records. If you do not want your e-mail address released in response to a public -records request, do not send electronic mall to this entity. Instead, contact the office by phone or by traditional mail. If you have any questions, please contact 850.487,1395. *Pursuant to Section 455.775 (1), Florida Statutes, effective ectober 1, 2012, licensees licensed under Chapter 455, F.S. must provide the Department with an email address if they have one. The emails provided may be used for official communication with the licensee. However email addresses are public record. If you do not wish to supply a personal address, please provide the Department with an email address which can be made available to the public. To determine if you are a licensee under Chapter 455, F.S., please clock here . Product Approval Accepts: tc si el:,hn;k Credit Card Safe https://www.floridabuilding.org/pr/pr_app_dtl.aspx?param=wGEVXQwtDgse7mYBd2b3... 7/21 /2020 M-1 CONSTRUCTION MATERIALS TECHNOLOGIES October 27, 2017 IKO Industries, Ltd 120 Hay Rd. Wilmington, DE 19809 Re: FBC FL7006 Sir(s), PRI Construction Materials Technologies has completed a technical review and attached sealed shingle instructions in compliance the 2017 Florida Building Code. This review was completed based on the receipt of following evidence from IKO Industries, Ltd: 1) IKO Shingle Application Instructions-- 3-Tab Shingles (EN-3Tab_Appins_8AGXEFS-2012-11_reformatted 2013-02-rev07/13-Florida) 2) IKO Laminated Shingles Application Instructions (EN-Laminated—Appins_8TTEFS-2012-04_reformatted 2013-02-rev07113-Florida) 3) IKO Hip and Ridge 12 Application Instructions (EN-HipandRidgel2_3HRTri-2013-08_reformatted 2013-08) 4) IKO Leading Edge Plus Shingle Application Instructions (EN-3LEP-Tri-2012-06_reformatted 2013-03) 5) ASTM D3161 Test Report (FM Approvals Project No. 3040947) The attached instructions should be used in conjunction with the published manufacturer's application instructions and applicable code. In the event the instructions conflict, these instructions shall govern. Statement of Independence: PRI Construction Materials Technologies and/or Duc T. Nguyen, FL P.E. do not have nor plan to acquire a financial interest in any company manufacturing or distributing products for which the test reports are issued. /f� Signed:�Drect�®r� Signal: Brad GDuc T, u enManagiFlorida Re ered Professional Engineer P.E. Number: 65034 Date: October 27, 2017 Date: October 27, 2017 Attachments: A) IKO Shingle Application Instructions - 3-Tab B) IKO Laminated Shingles Application Instructions C) IKO Hip and Ridge 12 Application Instructions D) IKO Leading Edge Plus Application Instructions I KO-1 B7-02-01 PRI Construc ion Materials Technologies, LLC. 6412 Hadger Drive Tampa, FL 33610 Tear. 813-621-SM Fax: 813-621-5840 a -mail: materialstesting@pricmtcom web5ite: httpJlwww.pdcmtcom IKO Installation Instructions for Asphalt Shingles Page 2 of 5 IKO Shingle Application Instructions — 3-Tab Shingles (ASTM D3161, Class F — IKO Marathon 25 AR and CRC Superglass M25AR) NOTE: THESE INSTRUCTIONS SHALT. BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT, THESE INSTRUCTIONS WILL GOVERN. ROOF DECK: Solidly sheathed and fastened deck conforming to 2417 FBC. UNDERLAYMENT: Applied in accordance with building code requirements. For areas where the roof slope is less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code requirements, the first sheet overlapping the eave protection by 19", followed by full 36" widths overlapping each preceding course by 19" or other Approved underlayments in accordance with the qualified application instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of underlayment laid parallel to the eaves, with 2" horizontal laps and 4" end laps. Apply metal drip edges on top of any underlay along rake edges and directly to the deck along eaves in accordance with building code requirements. NAILING: Use galvanized (zinc coated) roofing nails, 11 or 12 gauge, with at least 3/8" diameter heads, long enough to penetrate through plywood or 3/4" into boards. Use 4 nails per shingle placed 6-118" above the butt edge, approx. 1" and 13" from each end and 1/2" above each cutout. Drive nails straight so that nail head is flush with, but not cutting into shingle surface. NAILING ON STEEP SLOPES: For steep slopes of 21" per foot (60*) or more, use 6 nails per shingle placed as shown below. Ensure that no nail is within 2" of a joint/cutout of the underlying shingle. Seal down each shingle at time of application with three 1" diameter (approx. size and thickness of a quarter) spots of asphalt plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle. Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight. EXPOSURE: Installed shingles shall have a maximum average exposure of 5-5/8". STEEP SLOPES �— �— SEALING STROP 0 • T i i I I � fr118" 6-118 0 NAILS NAILS DO NOT NAIL INTO OR ABOVE THE SEALING STRIP PRI ConstoMn Matenals Technologies, L-C. 6412 Badger onve Tampa, FL 33610 Tel: 613-621-5M Fax: 813-621-5840 e-mail: mate6alstes5ng@pricmt.com WebSlte: httpalwww,PdCntcom IKO Installation Instructions for Asphalt Shingles Page 3 of 5 IKO Laminated Shingles Application Instructions (ASTM D3161, Class F — Cambridge, Cambridge HD, and CRC Biltmore AR) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE, IN THE EVENT THE INSTRUCTION CONFLICT, THESE INSTRUCTIONS WILL GOVERN. ROOF DECK: Solidly sheathed and fastened deck conforming to 2017 FBC. UNDERLAYMENT: Applied in accordance with building code requirements. For areas where the roof slope is less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code requirements, the first sheet overlapping the eave protection by 19", followed by full 36" widths overlapping each preceding course by 19" or other Approved underlayments in accordance with the qualified application instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of underlayment laid parallel to the eaves, with 2" horizontal laps and 4" end laps. Apply metal drip edges on top of any underlay along rake edges and directly to the deck along eaves in accordance with building code requirements. NAILING: Use galvanized (zinc coated) roofing nails, 11 or 12 gauge, with at least 3/8" diameter heads, long enough to penetrate through plywood or 3/4" into boards. Use 4 nails per shingle placed in the nail line 7-318" below the top edge, approx. 1" and 13" in from each end. Drive nails straight so that nail head is flush with, but not cutting into shingle surface. NAILING ON STEEP SLOPES: For steep slopes of 21" per foot (60°) or more, use 6 nails per shingle placed as shown below. Ensure that no nail is within 2" of a joint/cutout of the underlying shingle. Seal down each shingle at time of application with three 1" diameter (approx. size and thickness of a quarter) spots of asphalt plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle. Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight. EXPOSURE: Installed shingles shall have a maximum average exposure of 5-7I8". 6 3) NAILING -STEEP SLOPES APPLICATION USESiX nails asshown_ NAIL LINE PROPER APPLICATION REQUIRES THAT THE NAILS PENETRATE BOTH THE OVERLAY AND UNDERLAY PORTIONS OF THE SHINGLE PRI Construction Materials Technologies, LLC. 6412 Badger DC vE Tampa, FL 33610 Tel: 813-621-5777 Fax: 813-621-5840 a -mail: ma&alsteAng@pricmtcom WEbSlte: http:!lww++.pdcml.com IKO Installation Instructions for Asphalt Shingles Page 4 of 5 IKO Hip and Ridge 12 Application Instructions (ASTM D3161, Class F — IKO Hip and Ridge 12) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT, THESE INSTRUCTIONS WILL GOVERN. Cut hip and ridge shingles into thirds, using the perforation marks as a cutting guide. These shingles are designed for a 5 118" (130 mm) exposure. (For a neater appearance, the top of each side of each piece has been factory trimmed on a 1" (25 mm) taper (see drawing). Bend each piece over the hip or ridge, and nail 5 518" (143 mm) above the butt edge 1" (25 mm) in from each edge, exposing each piece 5 118" (130 mm). Apply hip pieces starting at the lower end of the hip, working up toward the ridge. On hip roofs, apply ridge pieces starting at each end, meeting in the middle. On gable roofs, apply ridge pieces starting at the end opposite to the prevailing wind direction and continue to the other end. Note: To obtain a three --dimensional effect, (which is recommended, but not required), apply hip and ridge shingles double thickness by stacking 2 pieces on top of one another, the lower piece extending about 3/4" (19 mm) further than the top piece (see diagram). The final shingle should be set in cement, and the exposed nail heads of the final shingle should be covered with cement. Prior to application in cold weather, storing the shingles in a heated area will allow for easier bending. NOTE: SHINGLES MUST BE APPLIED PROPERLY. THEY ARE DESIGNED FOR USE AS HIP AND RIDGE SHINGLES ONLY, AND SHOULD NOT BE USED FOR ANY OTHER APPLICATIONS. WE ASSUME NO RESPONSIBILITY FOR LEAKS OR DEFECTS RESULTING FROM POOR APPLICATION OR FAILURE TO PROPERLY PREPARE THE SURFACE TO BE ROOFED OVER, OR FAILURE TO PROVIDE PROPER VENTILATION IN ACCORDANCE WITH MINIMUM PROPERTY STANDARDS REQUIREMENTS. REVIEW ALL APPLICABLE BUILDING CODES, MINIMUM PROPERTY STANDARDS, AND REQUIREMENTS PRIOR TO APPLYING THESE SHINGLES USING THESE APPLICATION INSTRUCTIONS. TAPER CUT PRI Construction Materials Technologies, LLC. 6412 Badger Drive Tampa, FL 33610 Toi; 813-621-5777 Fax: 813-621-5840 e-mail: materiatstestng@pricmtcom WObSite: http:llwww.pricmtoom IKO Installation Instructions for Asphalt Shingles Page 5 of 5 IKO Leading Edge Plus Application Instructions (ASTM D3161, Class F — lK0 Leading Edge Plus) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH lKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT, THESE INSTRUCTIONS WILL GOVERN. 1. Apply any underlayment, eave protection, valley flashings, or drip edges to roof deck as required. 2. Each 39 318" x 13114" (1000 mm x 336 mm) IKO Leading Edge Plus strip is perforated lengthwise for separation into two (2) shingles. Take one IKO Leading Edge Plus strip and fold flat at perforation to separate. 3. Take one of the separated shingles 39 318" x 6 518" (1000 mm x 168 mm) and remove approximately 20"(500 mm). Install this shingle on the lower left corner of the roof deck, granule side up, with the factory installed sealant adjacent to the eaves. The shingle should overhang the rake edge and eaves by a nominal 114" (6 mm) minimum. Fasten the shingle to the roof deck with nails located 3" to 4" (75 mm to 100 mm) from the eave edge and 1" (25 mm) in from each end. 4. Take the leftover 20" (500 mm) piece shingle. Rotate the piece and align it vertically up the rake edge with the factory installed sealant adjacent to the outer edge of the roof. The shingle should overhang the rake edge by a nominal 114" (6 mm) minimum. Fasten the shingle to the roof deck with fasteners located 3" to 4" (75 mm to 100 mm) from the rake edge and 1" (25 mm) in from each end. 5. Repeat Steps 3 — 4 for the right lower corner of the roof deck. NAILING: Use galvanized (zinc coated) roofing nails, 11 or 12 gauge, with at least 318" (9 mm) diameter heads, long enough to penetrate through plywood or 314" (20 mm) into boards. Use 4 nails per shingle placed 3" to 4" (75 mm to 100 mm) from the eave edge and approximately 1" and 13" (25 mm and 330 mm) in from each end. Apply full-length IKO Leading Edge Plus shingles to the remaining eave edges of the roof deck. Install the shingles granule side up with the factory applied sealant adjacent to the eaves. The shingles should overhang the rake edge and eaves by a nominal 114" (6 mm) minimum. Fasten the shingles to the roof deck with nails located 3" to 4" (75 mm to 100 mm) from the eave edge, 4 nails per shingle. Apply roof shingles as per the instructions printed on each product's package. Make certain the first course of field shingle lies flush with the edges of the fastened IKO Leading Edge Plus. In this way, the sealant on the IKO Leading Edge Plus shingles will adhere to the first -course field shingles and help keep them from lifting in high winds. PRI Construction Materials Technologies, LLC, 6412 Badger Drive Tampa, FL 33610 Tel: 613-621-5777 Fax: 813-621-5840 e-mail: materialstesing@pdcmteom WebSite: httpJJwww.pricmtcom