Loading...
HomeMy WebLinkAbout205217-1d Compaction - signedHeadquarters 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando 723 Progress Way Sanford, FL. 32771 Mailing PO Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A.# 5693 KSMengineering.net DATE TESTED:KSM JOB #: 205217-1d/MH/jo PERMIT #:NUC #630 CONTRACTOR:AEM & Associates Nuc Model:MC-1DR-P JOB LOCATION:1633 Sweetbay Circle Nuc Serial #:30630 Palm City, Florida ITEM TESTED:Addition Slabs TEST LOCATION OF SAMPLE DEPTH PEN READ DRY DENSITY MAX. DRY PROCTOR VALUE (P.C.F) PERCENT COMPACTION 1. West Addition 0" - 12"50 110.4 111.6 98.9% 2. North Addition "50 109.6 "98.2% 3. N.W."50 109.6 "98.2% Soil Description: Brown Sand In Place Moisture: 9.3% Proctor Optimum Moisture: 12.0% Proctor Max. Dry Density: P.C.F. 111.6 @ Test Locations the Density & Penetrometer readings indicate the Degree of Compaction Meets Minimum Requirement for Staked Foundation Respectfully Submitted: Bryan E. Dahlke, P.E. V.P. of Engineering PE # 81439 10/21/2020 Email to: andre@aemandassociates.com Disclaimer:Contractor is responsible to maintain the tested area in the condition that KSM completed the indicated passed compaction test. KSM is not responsible if the tested area has been altered from the approved inspected condition. Proudly Serving Florida since 1990 SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 6938 October 20, 2020 2007-0507 108.0 109.0 110.0 111.0 112.0 113.0 9 10 11 12 13 14 15 W E I G H T P . C . F . D R Y Moisture -% of Dry Weight