HomeMy WebLinkAboutBuilding Design SpecificationsDocuSign Envelope ID: 1CDOB347-7C5D-4OB2-BEB7-4975A4EA649F
Customer: David KosKO Date _
ADDENDUM 1
Confirmation of building specifications and other information
Buildin Desi
EV E MAF E Door and Window Locations
4;L91\III
a A-
RIGHT SIDE
n Specifications
7/10/2020
Roof Type
a
14' t RRGULAR
Note: Walk door and window locations are approximate and may change slightly when installed In the field. If a
walk door or window Installed on the eave side of the building does not fall between legs, a $150 header fee
will be charged. If a walk door (or similarly sized) frame -out does not fall between legs, an $95 header fee will
be charged. If a window (or similarly sized) frame -out does not fall between legs, a $70 header fee will be
charged.
BACK
LEFT SIDE
Buyer understands that the location of the roll up doors installed on the side of the building as shown are approxii
The engineer may have to adjust the locations by a few Inches to avoid having to add additional bows/trusses at B
Building Color Selections:
Walls TBD
Roof TBD
Trim TBD
Wainscot TBD
8OXED Rave- '
Side and End Sheeting Type
;.
t
f +
}t��.��...
yy
Y
Y off
�yt
t
Note: Obtaining a drainage plan, site survey, site development
plan, floor plan and termite treatment are Buyers
responsibility.
*Note: As built drawings take approximately 4-6 weeks to complete. Any revisions made to the building after one week of the date on this document that Impacts the drawings Pa. a
changes to building dimensions, any changes to door/window/frame out locations) WILL result In an additional charge for new plans and will add an additional 4-6 weeks to the timellne
complete them.
*Note; $300.00 Document & Permit Doeugl' head b NOT yet been paid by buyer will be collected prior to drawings being ordered from engineer and permit being pulled.
Y'
Signed ��/j�_p , Date 7/12/2020
11175 Cicero Dr Ste 135