Based on our recent inspection and discussion with you, we propose the following. Single story block
home. Mobilize foundation repair crew and equipment prep and excavate 3 helical pier locations to
hydraulically drive below the affected areas of the structure. We will Install steel pier sections with a Life
Time Warranty to an estimated depth of 25 feet below existing ground surface or to load bearing strata,
Solid Foundations will then perform synchronized lifting to stabilize and attempt to lift the foundation to
best feasible elevation or position.
DESCRIPTION OF PROJECT
WE PROPOSE
To furnish material & labor - complete In
accordance with above specification for the sum of
Total Contract Price $4,850.00
Deposit Required 30% $1,456.00
Due Upon Completion $3,395.00
Note: Steel Piers installed exceeding 25ftwill be charged at a rate of $22.00 per linear foot. It is possible that voids or unknown
anomalies could be encountered during the Polyurethane Target Grout Injection process, requiring additional material. This will be
charged at $100 per gallon.
Client Initial:
Due to the nature of these type of repairs, there Is a possibility that any cracks or stress points created by the settlement may
become apparent during any lifting or stabilizing procedure (usually minor). We will not be responsible for any cosmetic repairs.
Compensation for any additional services you request and that was not covered under this proposal will be based upon the actual
time spent and services performed. We will not exceed the quoted amount without written authorization. In performing our work,
we will use personnel experienced and qualified to perform our services in strict accordance with Industry standards and
manufactures recommendations.
Acceptance of Contract - I am aware of and agree to the contents of the Proposal, You are authorized to do the work as specked
In the Contract. I will make the payment set forth in this Contract upon completion of the physical work. 11we will pay your service
charge of 5 % of the project if i am 5 days or more past due, plus attorneys fees and costs to collect.
Any alteration from the above specifications and corresponding price adjustment (if necessary) will be made only at the
Customer's request or approval. Completing the work in the Proposal at the lime scheduled is contingent upon accidents or delays
beyond our control. A 30% deposit is requred to be placed on the schedule and the remainder is due upon completion.
® Client must be present on the final day of install and a final walk
Client Initial: through is to be performed with the foreman. Balance is to be paid In
full to the foreman on the last day of install. If the project is financed,
all paperwork will be signed before the foreman leaves the job.
Client
Signature:
Date:
SF Representative
Signature: Au`A&V Date:7/15/2020
3" Push Pier'Model 300 Push Pier
3" Push Pier'Model 250 Push Pier
Concrete R & R Per Pier
Helical Piers
g
Spreader Beam (steel)
Crawl Space Pier
CMu Pier
Wood Beam (4x6)
Crawl Space Re -Level
Floor Joist
Polyurethane Injection
Relief Drains
Tiebacks
Shrub & Tree Removal
Engineering
Permit
Solid Foundations
2704 SW Main Blvd
Lake City, FL 32025
855-227-0300
CONTRACT DATE: July 15 2020
SUBMITTED TO: Jade & Bryan Wright
ADDRESS: 6820 Wadsworth Terrace
Port St. Lucie 34952
SF Represntative: Paul Kolzow
Cell: (407)907-2227
Email: PaulOsolidfoundations.com
EMAIL: 4ADEALANA. LONG
Phone: 304-685-5282
32
12
Push Pier Model 300: 0 Interior Pier: • 700:
Push Pier Model 250:0 Low Profile Bracket:* 430: 0
Helical Pier: 0 Porch Bracket: 0 Windows/Doors:
Crawl Space Pier: 0 4x6 Wood Beam: 0 Floor Joist: