HomeMy WebLinkAboutMisc Letters RECEi".,D JAk .2, 7017
QUEENS COVE PROPERTY OWNERS ASSN., INC.,
r�lac-e�
APPLICATIONIOR PERMIT r�� h l n IdoLk
List Permitted Item
Owner's Name Cl/d 11►a m A r' a G o a Date
Address'' a L4 Qu Pal CaAh erl c_, CA
City f+ Pl J JTe -0— State F L Zip _-�Hq4QPhone rl 7a -y1 0 53�
Property Location:Lot C Block t Unit
Architect �` ( �{� Phone ` ' n/
Contractor aim m-ex 1 I r� s I 'l OJ i rl Uicense# _ H 9,1 q Phone 1-1,2' q4'1 ,L9 CAD
,nn ��,66 (This s A R uired Item) �
Address a L)� �Q r_0 f< U S(�1., C- �(This
- I P�r-� FL 3H`H _p
Permits: Fee Documents Required
Home Construction $1300.00* #1,2,3,&5
(Includes pool.fences,landscaping,etc.)
Bulkheads,Docks,Hoists,&Pilings N/C #3,4,&6
I
post-Construction Additions/Improvements. N/C #1&2(pool only)
(Includes,fences,driveways,pools,roofs,etc.
New or repair)
Queens Cove Documents $15.00
DOCUMENT LIST
1. Plot plan showing location,size,setbacks, &elevation.(For roof repair,specifications only).
2. Complete set of plans and specifications,including pool and enclosure,fencing,landscaping and drainage for surface water,
swales,etc.
3. Survey.
4. Dock or bulkhead drawings.
S. An"as built",survey or final plot plan,AFTER construction.
6. All required governmental permits(County,DEP,&Army Corps of Engineers—if required).
NOTES
a. * $100.00 is refunded upon submission of document#5.
b. A$741.00 credit is;due for new water hookup from St.Lucie County Utilities.
C. Property owners will be held responsible for any damage to the common properties of Queens Cove as a result of
the above construction(whether caused by the owner,contractor or:sub-contractor)'.
d. Owners and contractors will also be responsible for ensuring all suppliers and workers comply with our speed
limit(25 mph) and refrain from littering. Disregard of these requirements could result in the contractor or
person(s)being barred from Queens Cove.
e. All new construction shall conform to the required quality of workmanship and materials and be in harmony with
the external design of existing structures.
f. New construction will not be permitted without existing or simultaneously-constructed bulkheading.
CONTRACTORS;ARE PERMh!'EI)ON THE PREMISES MONDAY—SATURDAY,,BETWEEN THE HOURS OF'7:30'AM-AND
5:001'M,ONLX._CALL GATE COMMITTEE_ F9A CONTRACTOR ACCESS.CODES. DO NOT GIVE OI'T YOUR OWN:
APPLICANT'SJ DATE I -IO 'ILo
APPROVED 7 DATE
(An horMed QCPOA Signature)
Effective 7/.1/08
(Obsolete Previous Editions)