HomeMy WebLinkAboutinspection docs6fA I Universal
Engineering
s
Sciences
Company
Date 10 a)
Facility.
Inspection
When will work be ready? Date
Check one:
D-Regular Inspection:
Century Complete
5711 Eastwood Drive
INSPECTION REQUEST
❑ Reinspection Date of Initial Inspection
Permit No. 1910-0659
Phone No.
This form must be entailed and received by GFA International no later than 1:00 p.m. for next day inspections
Email To: aeintneriJazteam¢fa.com ¢faschedulin¢(a�teamefa.com iduprevCateamefa.com
Inspection Type Requested (check):
BUILDING/ STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rou h-In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Pi in & Test
HW Piping & Test
Wall/ Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/ Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/ Ground
Storm Piping & Test
Insulation
Sheet Rock
A liance/ Equipment
Fixtures
I
I Wall & Ceiling
Roofmg
Lighting Protection
E ui ment
Equipment
Re -ins ection
Re -inspection
Re -inspection
Re -inspection
Final Buildin
Final Electrical
Final Plumbin
Final Mechanical
Other Inspection Type
Area Inspected
Inspection Results:
Conditions/ Comments
1.
2.
3.
4.
5.�
AP -Approved
AE — Approved
with Exceptions
DA-
Disallowed
El
DP -
Disapproved
Inspector's Sig(ee BILLED TIME HrsDate
(` OFFICES THROUGHOUT FLORIDA
Not Ready ❑
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924.3575 • (772) 924.3580 (fax)
www.teamgfa.com