HomeMy WebLinkAboutPower Release 10-22-'20 09:57 FROM- 7728787656 T-427 P0001/0004 F-804
Plannlhg::-:Deli topment 9e�tes
23Q0.-` %rrg1n a Ave'
Fr fierce;
' 772-4.62 1. 1165 Fax'7721462-6443
Request-for 3B-day Temoo�ary Por Release
Data; laern itNom. er. �
ProjectAddre: �4 Qs� a CN
THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER!TO THE ABOVE DESCRIBED
PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY(30)-PAYS,FOR THE PU OOSE OFTES71NG SYSTEMS
AND EQUIPMENT IN'PREPARA-TIOA FOR A:FINAL INSPECTION. IN CONSID8RATION OF APPROVAL OF THE
REQUEST'WE-HER 3Y ACK.NOWLEDGE AND AGPJEE•AS .ms:
I. This.ternporary power release is roue ed for the Wye sW)ed ptlrptise orak and here viiN be no
occupancy of any type,.other than that•parniitted.by c)onsb ucbon during this time period.
2. AS wrtness by our signatures,we'hereby agtee'to abide by all berms a d condItl6ns of this agreement,
including Sullding' Division.Policy,which is incorporated harsh by reference.
3. All condition$'arid raequlreinents listed in the a=t hed dowrnent entitl§dd"Requirements for 30 Day
Power for Testing"have•been fulfilled'arid the'premise is ready for coinpliarice inspection.
4. All requests far An a t aansion beyond 3o days must ba made In wnbng tD the wilding Official staling
the reason fbr the request. Power may be refnoved'Frorn.-the site andfdr a Stop Worts Order issued if
the Final'Inspection has not been approved tk thfn 30'days. A fee of,�100.00 witl be required to lift
the ftp Work Order.
WE HEREBY RELEASE AND AGREE TO HOLD HAR[�tLlws�S,
ST..LUCIE COUNTY,AND THEIR EMPLOYEES FROM
ALL Lt461LITIES AND CLAIMS OF ANY TYPE OE NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT
OF THIS TRANSACTION;INCLUDING ANY DAMAGE`WHICKMAY BE INCU R DUE TO THE
DZSCONNECON OF ELECI'fti POWER IN THE' VEN�'OFtI#ATIt3N THIS AGR
OWNER SFGI�i DATE'
RE DATE
F„LECMCAL CONTRACTOR SIGNATURE DATE