Loading...
HomeMy WebLinkAboutTermite cert 10/19/2017 07 :26 AM PDT TO: 17724621578 VROM:5616880909 Page: 1 St Lucie County Inspections ections Cho 2300 Virginia Avenue Ft Pierce, FL 34982 (722) 462-2172 RECEW-7D OCT 19 2017 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT# 1-70 ) ` 0 /6 JOB ADDRESS 3316 Bent Pine Dr, Fort Pierce,FL 34951-2965 BUILDER GHO Homes PEST CONTROL CONTRACTOR HomeTeam Pest Defense, Inc. PEST CONTROL LICENSE# JF0001886 We,the undersigned,hereby certify that we have pretreated the above-described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: 350 Chemicals used: Cypermethrin Percentage of solution: .50% Total gallons used: Date of treatment: 10/17/17 Time of treatment: AM ❑ Footing FBC104.2.6 Certificate of Protective Treatment forprevention of termites. ❑ 1 st Treatment A weather resistant jobsite posting board shall be provided to receive ❑Re-treat duplicate Treatment Certificates as each required protective treatment is El Slab completed,providing a copy for the person the poermit is iisued to and another copy for the building permit files. The Treatment Certficate shall 111 st Treatment provide the product used, identity of the applicator, time and date of the ❑Re-treat treatment,site location, area treated, chemical used,percent concentration and number ofgallons used, to establish a verifiable record ofprotective ❑Driveway treatment. If the soil chemical barrier method for termite prevention is used, ❑ 1 st Treatment final exterior treatment shall be completed prior to final building approval. ❑Re-treat St Lucie County requires for the final inspection for CO,a Permanent ❑Pools Sticker to be placed on the electrical panel box cover,listing all the ❑ 1st Treatment treatments and dates of applications. ❑Re-treat Other �! ❑ 1 st Treatment ❑Re-treat Signature of exterminator ® Perimeter for Final Inspection NOTE. There must be a completed form for each required treatment or re-treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re-inspection fee charged.