HomeMy WebLinkAboutMisc Letters (2) V • PLAN, N' IN G & DEVELOPMENT
SERVICES
To Whom it May Concern,'
ST. LUCIE COUNTY
BOARD OF COUNTY A request was made by the owner,(Jeremy Wheeler)to inspect property at 101 El
CONUvMSIONER.S Mar Dr. I performed an onsite inspection accompanied by Monica Barrios on
10/16/18. Mr. Wheeler was also present during the inspection.A list of work that
FRANNIE HUTCHINSON was to be done by contractor were the main issues for the inspection. There is also
CHAIR safety issues that need to be addressed.Required exits must be maintains during
DISTRICT 4_ -co} etiP ' A __..
_IST .._�nncn of thy-a�p�mentbetween-owner--an
contractor(BSL Construction Co)is attached. Following is a line by line inspection
CHRIS D7ADOVSKY results:
DISTRICT 1
Month 1)
LINDA BARTZ Upper deck to be completed:Not complete.
DISTRICT 3 Drywall finished&primed:Not complete.
Pecky ceiling installed: Complete
CATHY TowNSEND Month 2)
DISTRICT 5 Wood flooring installed:Not complete.
Tile flooring complete:Not complete.
HOWARD N.TIPTON Trades(plumbing,Mechanical,electrical):Not complete.
COUNTY ADMINISTRATOR Interior trim:Not complete.
DAN MCINTYRE Month 3)
COUNTY ATTORNEY 1 floor deck:Not complete.
Kitchen installed:Not complete.
MAILING ADDRESS Exterior siding complete:Not complete.
2300VIRGINIA AVENUE
FORT PIERc1 4FL 3482 Month 4)
Deck railing:Not complete.
PHONE Deck repair:Not complete.
(772)462 Final inspections:Not complete.
TDD After careful review of submitted plans and onsite inspection,it was determined that
(772)462-1428 revisions to the plans will need to be done.
1) Second floor deck boards were to be replaced over existing joists. Revision for deck
FAX framing required. Existing joists replaced.
(772)46Z-XXXX 2) Second floor exterior siding has been changed from Hardi-plank siding stucco siding with
lap siding look.
E-MAIL
4'�{T
04TL66ECo ORG:
-2010
WEBSITE "
�,,p 0 w eS
VifWVif.STLUCIECO.GOV 1a
BSL CONSTRUCTION CO
Apra 10,2016
JeremyWhoeler
5n08aynriew,Dr
Fort Lauderdale,FL 33308
RL 10t El Mar Or,Janson Beach FL 34957
PROJECf9 N-284 UPDATE-2
I
DearMrWhoefer.
As per theon•slte meeting(V6118)8SLConsvuuton Co.agrees to have complete
the-original scope of work outlined in the above referenced contract p4.284
UPDATE•2)widrin 120 days from signed agreement outlined here.Change orders
agreed and paid in fufl prior to(4/6/18)are included in the completion date.
CONDMONS:
t) Complaintwithdtawnlrestinded.CcpyofvntltdrawpmvidedtoBSLConstrudon
2) �niems o�tt �s� us�a"StttH""f�o�tt�l 6it�aJ$��+�p��lylya to�. �{a�ng�'jtgm�ipns�ta p
� GCCOJrei�a�rt,.-l�WU1hC7prrtA�REl1712A1�4 a3(tUi dt�a30tlitie�ItQ
3! l cess en Tral f madean ti Vlv od ar u ftd below,
pay�meo+�ez o�i�`edma ad.85t.&onsoucnan orre�tvaredn too t�hge�property
41 aiterrct�ne-1f o ov rem�4/11/18a{oorei eludede� �if rte�weil as an
a ai east�t nm�^t o tuna npo orm orxn gn greomentand i
PY �op t
S) B5L nstru gnvIllneo�ardhesafertro6d����cTCnam m tedi�ttime.i�
rsu Cd° at an ^ enusuea o anstru f wnerwl i
1vot�Ct iroug erssue necessarytostayof osetoomeasp e.
6I rma ta�t�a�tionaltir�teforcomplotionIhesees fit and toofhatrush
rlgeo anyunseen slue.
In summery 65!Oonstmdion is aware owner is requesting a completion date k
totheprojectand will work rLGgentlytohaw compfetedinthe oudinedifine-17-
Owner has atthintime(4111118)paid$189476S.26 with a balance due an 1
completion of=0011110 plus anyADOlChangs Ordarsagmed tolmm this date.
s693 NW NORTN MACEDO BLVD PORT ST WCIE.FL32983 561.346.9346
(i
t
I t
t�
I
i
r
1
j
r
Owneragrees tosUpply/havean hand:
,At!Flaodrtg '
.,All Cabinetry
Al Har)Surfaces(countertops+window sills other them standard marble)
4me6orDaora&Hatdware
.tntedorTrim
Tie for Shower I Bath
-Plumbing Famres
.Gas Installation
Payments asfoilawk
SIS,000upartawationofthisagreement ✓
$3,750onApn7271th ✓ I
$3,750 an May I I v
53,750 on May 2S'✓ '
$1,750 an June8if 1 t
S3,750onJune 22 V
S3.7SOonJu1y6 ./ 1
$3,750 anJuly20�/ 4
$3.750onAu93
S5.000witl+in 72hm of%al Inspection
'Please Nate:if job progresses fa-.or payments wibe modified. t
preliminary Work S6eduls:
Month t) Upper Rock to be completed
Drywall(InTshed and primed
Peetry Coiling Installed
Month 21 Wood Flooiinginstallod
t 1
Tile Floars installed
Trades(PlumbingligeculcabMerhanimt) '
IntedorTrim
' l t
r r
i 1
' i s
I
I
Month3) Sstfloo(Deck
Kitrhon's Install r
,
Extodor Wing Complete �
Month 4) Deck Railing
Dock Repair I
Finish Inspedons
4
. 4
I
if you are in agreement to the above terms please sign and return.
Liz
Jer my Wheeler Date
l
Sincerely yours.
ar..,MV
Byron Lenon
BIN ConstruNon Co
BSL CONSTRUCTION CO
April 10,2018
Jeremy Wheeler
5720 Bayview Dr
Fort Lauderdale,FL 33308
RE:101 EI Mar Dr,Jensen Beach,FL 34957
PROJECTS N-284 UPDATE-2
Dear Mr Wheeler,
As per the on-site meeting(4/6/18)BSL Construction Co.agrees to have complete
the'original scope of work outlined in the above referenced contract(N-284
UPDATE-2)with-in 120 days from signed agreement outlined here.Change orders r
agreed and paid in full prior to(4/6/18)are included in the completion date.
CONDITIONS:
I
1) Complaint withdrawn/rescinded.Copy of withdraw provided to BSL Construction
2) ela�pyocanoc tlltnedr�o0on^ers o onjiYilitgSsur liY o eerota7anetci�nionm II to {
bgqm8 toflcompletioh4 'aolprwlllphejp ugvpe terns rlii(eri�es pulled�ec�dc�it, '
3) Pegrpiier�is ca�i a mat ed to��aLt ri tiucuon or e�nreceed oihe property'. )
4) pdd/Chan e O Wers fir m(4/11/181 a u n t included i t o limit.BSL
e um ri as�t(rreptncro�aee ot4me iepeiRem�7wneea�stlgnhirnrsgogreewrreseni and
pay a at time o`t'placement tv
5) BSL drsioo ai If en �nsu�eriassue arses 6o�tdSt� nnstrtuctionlecw a wi�f
is roug t e issue s necessary to stay as close to nme as possi.7e:
6) cmer mamrvt additional time for completion if he sees fit and to offset rush
c angle or s or any unseen issue.
In summery 8SL Construction is aware owner is requesting a completion date
to the project and will work diligently to have completed in the outlined time-line
Owner has at this time(4111/18)paid$189,765.26 with a balance due on
completion of$50,000.00 plus any.ADD/Change Orders agreed to from this date. j
5693 NW NORTH MACEDO BLVD PORT ST LUCIE,.PL32983 561,346,1346 i I
r
i
j I {
x
i
t i
3
r
NIT jq D�GIf �i
Month 3) 1st Floar Deck
Kitchens Install ~I 7 /I'+ Q�I/�t�K M STI~(. J-riew -
Exterior Siding Complete "' NN t o
Month 4) Deck Railing O/s y o j Nt N D .f`91ljy �' go t
Dock Repair MO T. 8i Ne AW4cc i
Finish Inspections
Sia,
4z
If you are in agreement to the above terms please sign and return. s
�m
Jer/my Wheeler Date
' r
Sincerely yours,
Byron Lenoff
BSL Construction Co
1
t
i
Owner agrees to supply 1 have on hand:
-All Flooring
-All Cabinetry
-All Hard Surfaces(counter-tops+window sills other then standard marble)
-Interior Doors&Hardware
-Interior Tri m
-rile for Shower[Bath
-Plumbing Fixtures
-Gas Installation
Payments as follows:
$15,000 upon execution of this agreement ✓ ,
$3,750 on April 27th ✓ i
$3,750 on May 11 v `
$3,750 on May 25'J j
t
$3,750 on June 8 f
53,750 on June 22
53,750onJuly6 ✓�
$3,750 on July 20'✓
$3,750 on Aug 3 ✓
$5,000 with-in 72hrs of final inspection ; +,
'Please Note:If job progresses faster payments will be modified.
PreliminaryWork Schedule: ® 7 1040
Month 1) ' Upper Deck to be completed �
Drywall finished and primed N6
Pecky Ceiling Installed
Month 2) Wood Flooring Installed N 4�. d®4M
Tile Floors Installed N
Trades(PlumbingtElectricaUMechanical)
Interior Trim
�'dT O�rc¢T,
i
l �
, I
I h
R t io N 1703 - 0 0. 6
�It&tvl«+L. r 7oi-- 03 Sy
, I
i
N� T/��c '� /�/u cl L /,mss TO
L"A-T iA /4 47 611
!Ns%A4��o N o