HomeMy WebLinkAboutApproved PlansW -I" T.O.B.
S
Union Corrugating Co. 26 ga. 5V crimp metal roofing
FLU: 1211.4 Attach roofing to deck using 99 x 1.5"
wood screws with washer Per Approval over 30 Ib felt
underlayment installed with min. V side laps
and 6" end laps fastened with corrosion resistant tin
caps with 1 1/4" ring shank nails spaced 6" o.c.
at all laps and two staggered rows 12" o.c. in Field.
Roof deck to be 19/32" COX plywood nailed to
trusses with 8d x 2.5" long ring shank nails per sheeting
attachment detail on roof plan
Max allowable uplift = 85.8 psf
12
4 1 SLOPE
2'
Braden AIA, PA
Product Approval Submittal Affidavit
Building Design Is: Enclosed Risk Category: II Wind Velocity: 165 mph ultimate
Mean Roof Height:
Building Corp.
2,"
Architects
Internal Pressure Coe Icent: ±0.18
rp
Sub,lectability to damage from: Weathering: Negligible Termites: Very Heavu
Opening Schedule Swing Doors, Overhead Doors, Sliding Doors, Windows & Skylights
5/8" thick light textured
stucco on typical concrete
block construction
Opening
p g
Type
Wind Exposure Classification: C
NOA FL
/
NUMBER
Product
Model #
- - - - - - - - - - - - - - - - - - - - - - - - -
Glass
Attachment method
TEST
Expiration
Date
Design Pressure
g
of Approved Testa
1.2.3
t4
Roof Zone: 3.+20.4/-84.0 psf
5/8" thick x 8"w cut
coral finished stucco bands
LEFT ELEVATION
SCALE: 1/4" = I' -O"
Union Corrugating Co. 26 ga. 5V crimp metal roofing
FLU: 1211.4 At
roofing to deck using #9 x L5"
wood screws with washer Per Approval over 30 Ib Felt
underlayment installed with min. 4" side laps
and 6" end laps fastened with corrosion resistant tin
caps with 1 1/4" ring shank nails spaced C o.c.
at all laps and two staggered rows 2" o.c. in field.
Roof deck to be 19/32 COX plywood nailed to
trusses with 8d x 2.5" long ring shank nails per sheeting
attachment detail on roof plan
Max allowable uplift = 85.8 psf \
2° 5/8" thick x 8"w cut
.H. coral finished stucco bands
`3
�5/8" thick light textured
stucco on typical concrete
block construction
RIGHT ELEVATION
Union Corrugating Co. 26 ga. 5V crimp metal ooring
FLU: 1211.4 Attach roofing to deck using #9 x 1.5"
wood screws with washer Per Approval over 3C Ib felt
underlayment installed with min. 4" side laps
and 6" end laps fastened with corrosion resistaet tin
caps wrth 11/4" ring shank nails spaced 6" o.c
at all laps and two staggered rows 12" o.c. in 'field.
Roof deck to be 19/32 COX plywood nailed to
trusses with 8d x 2.5" long ring shank nails pe sheeting
attachment detail on roof plan
Max allowable uplift = 85.8 psf
M
5/8" thick x 8"w cut O
coral finished stucco bandsLJ
---- - - - - --
-
Finish Columns with
5/8" thick cut coral
finished stucco bands
=L��ATIO>\1 \ IOT=S
liGtillil lIC IhroA IYiC1I1 ru;%auinr.0
CONCEALED FASTENEK OR ATTACHMENTS
ARE THE RES IBI V OF THE
WW= OF RECORD
12
SLOPE �{ ALL MANUFACTURES LABLES SHOWING
U FACTORS AND SHGC COMPLIANCE
WITH FBC ENERGY CODE MUST
REMAIN ON ALL DOORS AND WINDOWS
UNTIL INSPECTIONS ARE APPROVED
12'
O H.
C ;1'll<;6t Ed!AN:a siP!L ,',L"u 01";J't'v6l::ly1 WUh?`
,fol 'If rsf� �ffluCT&
li
,?,Calf i) U11 MEL
KAY @L j'A ; SPAR-IMW Os�l��� TO
"�i'�PLY @1rcHAl ��i(�("„
!7' -CJ" = Finie6crl Flnnr /�
5/8" thick llcht textured
stucco on typical concrete
block construction
REAR ELEVATION
Overhangs at I' -O" unless otherwise noted on Roof Plan
Roof pitch at 4:12 unless otherwise noted
Arg changes to this plan shall be submitted to the architect
for approval in writing prior to starting construction.
Return ALL Stucco Bands Into Window or Door.
12
SLOPE 4
SCALE: 1/4" = 1'-0"
Union Corrugating Co. 26 ga. 5V crimp metal roofing
FLU: 1211.4 Attach roofing to deck using 49 x 1.5"
wood screws with washer Per Approval over 30 Ib felt
underlayment installed with min. 4" side laps
and 6" end laps fastened with corrosion resistant tin
caps with 1 1/4" ring shank nails spaced 6" o.c.
at all laps and two staggered rows 12" o.c. in field.
Roof deck to be 19/32'' COX plywood nailed to
trusses with 8d x 2.5" long ring shank nails per sheeting
attachment detail on roof plan
Max allowable uplift = 85.8 psf
\ Finish Columns with
5/8" thick cut coral
finished stucco bands
# 1101, 03-)%
ST. LLTCFV rntTKTV Tit
FFVWN1 LL0 FOR
SCALE: 1/4" = I' -O" 1<✓ILS�'E YJ
DATE 3 l
VLAN� l ATPD PER -MIT Al
On NO LNSIVL�C,rlo,
T)IVI5ION
: KEPT ON JOD
A1ADE.
1/8" Thick cut coral stucco over paper
backed wire lath nailed to substrate through
one layer of 15 Ib felt using 8d nails. Substrate
to be 19/32" COX Plywood nailed at 6" o.c.
in field and edges with IOd ring shank galvanized
nails into truss webbing.
12
SLOPE 4
2"
I" T.O.B. rth
22
H r
H
®® .
5/8" thick x cut
coral finished stuccoo bands
O' -O" =Finished Floor Finish Columns with 5/8" thick light
textured
5/8" thick cut coral stucco on typical concrete
finished stucco bands block construction
FRONT ELEVATION
SCALE: 1/4" = 1'-0"
2" x 4" top plate 1/2" drywall ceiling on truss bottom cord
1/2" drywall on
2" x 4" studs at 16" o.c.
base -board I II / 2 x 4" P.T. bottom plate
\ 4" concrete slab with fibermesh OR
6"xC 3*10/10 WWM on 6 mil Visqueen over
clean compacted termite treated fill
_w +,}._,_
2"
0
-� 5/8" thick x 8"w cut
coral finished stucco bands
-0'-4" A.F.F.
ALL CONTRACTOR WARRANTIES BEGIN WHEN THE CLOSING
OCCURS BETWEEN THE BUYER AND WYNNE BUILDING CORP.
AND WILL CONTINUE FOR ONE YEAR FROM THAT DATE
PERMITTING INFORMATION (F=ORM 100)
Braden AIA, PA
Product Approval Submittal Affidavit
Building Design Is: Enclosed Risk Category: II Wind Velocity: 165 mph ultimate
Mean Roof Height:
Building Corp.
II' -O" Roof Pitch: 4:12
Architects
Internal Pressure Coe Icent: ±0.18
rp
Sub,lectability to damage from: Weathering: Negligible Termites: Very Heavu
Opening Schedule Swing Doors, Overhead Doors, Sliding Doors, Windows & Skylights
Width of ROOF End Zone: 3'- " Wind Speed: Idr mph ultimate
Opening
p g
Type
Wind Exposure Classification: C
NOA FL
/
NUMBER
Product
Model #
Manufacturer
Glass
Attachment method
TEST
Expiration
Date
Design Pressure
g
of Approved Testa
1.2.3
t4
Roof Zone: 3.+20.4/-84.0 psf
FLU 11499.2Mi
Single Hung
Series 185
Windows
and doors
�= Roof Zone I
3/16' dia. Tapcons w/ min. 1 1/4" penetration at 6" max.
from each clorner and 19' o.c. thereafter thru PT Buck
into solid filCMU wall
Walls Zone 4
+41.2/-50.0 psf
E -mall:
Shear Walls Considered for Structure? Yes
A
I6-0330.02
Roof Zone 2
Overhead
Garage Door
Model 824
191-0" max height
DAB
Install track to buck per product approval and per
inanaracAttachtBuck to well uam 3/8" x 6" anchor bolts at IS' o.c.
10-9-21
+50.0/-60.0 psf
Roof Zone 3
B
FLU 15221.1
Fiber lash
9
Smooth Wood grain
a
series o fiberglass
Plaspro/Nanga
Plastics Corp.
Sic* 1/4" dia. tapcon with min 1.25" embedment at 6" max
from corners and I4' o.c. thereafter in ,lambs.
Pressure based on SCHLAGE hardware.
+ 45,0 PSF
-
C
FLU 15332.2
Sliding Glass
Door
Series 420
a
MndI WmdoWs doors
3/IC dia. Tapcons w/ min. 1 1/4" penetration at 6" max.
from each corner and 19" o.c. thereafter Oru PT Buck
filledinto
+ 40.0 PSF
Product
NOA/FL
NUMBER
Model #
Manufacturer
Attachment Method
TEST
Date
Design Pressure
of Approved Tests
Mullions
FLU 15353.2
5164
vertical mullion
Mi Windows
and doors
For CMU use (4) 3/16" dia. to cons with min 1 1/4"
penetration with anchors locate per product approval drawings.
MFG TO PROVIDE REBAR IN MULL
+ 44.2 PSF
-
Roof
FLU 1211.4
5V Crimp
Metal Roofin 9
INSTALLATION
METHOD: A -IS
Union Corrugating Co
u9ox l5�wg000ddnsscrews withgwashercper approval over UDLe25 lus9
P PP P
underlayment installed with min. 9" aide IaQs and 6' end laps fastened with
corrosion resistant tin caps and with 1.25 ring shank nails spaced 6" o.c. at all
lata and two staggered rows 12 o.c, in field. Attached deck per sheeting
attachment detain on roof plan
FIELD:
-85.8 PSF
Edge and Perimeter:
-113.1 PSF
Siding
stucco on Block
Soffit
IS -1021.02
Model T4 12" Vented
Vin I Soffit
Kaycan
Installed using any approved anchors as shown in product approval.
Contractor to strictly adhere to the product approval for the use
f fasteners, bacings. and edge distaices.
4-20-21
+ 55.0/-35.0 PSF
Hurricane
Panels
Fltt 15016.2
24 Gauge
Storm Panels
Global Protection
Products LLC
Installed using any approved anchors as shown in product approval.
Contractor to strictly adhere to the product approval for the use
f f enerspacings.tances.
+55.5/-12.0 PSF
I have reviewed
the above and approved it by my seal below. ( Architect or Engineer of Record )
Union Corrugating Co. 26 ga. 5V crimp metal ooring
FLU: 1211.4 Attach roofing to deck using #9 x 1.5"
wood screws with washer Per Approval over 3C Ib felt
underlayment installed with min. 4" side laps
and 6" end laps fastened with corrosion resistaet tin
caps wrth 11/4" ring shank nails spaced 6" o.c
at all laps and two staggered rows 12" o.c. in 'field.
Roof deck to be 19/32 COX plywood nailed to
trusses with 8d x 2.5" long ring shank nails pe sheeting
attachment detail on roof plan
Max allowable uplift = 85.8 psf
M
5/8" thick x 8"w cut O
coral finished stucco bandsLJ
---- - - - - --
-
Finish Columns with
5/8" thick cut coral
finished stucco bands
=L��ATIO>\1 \ IOT=S
liGtillil lIC IhroA IYiC1I1 ru;%auinr.0
CONCEALED FASTENEK OR ATTACHMENTS
ARE THE RES IBI V OF THE
WW= OF RECORD
12
SLOPE �{ ALL MANUFACTURES LABLES SHOWING
U FACTORS AND SHGC COMPLIANCE
WITH FBC ENERGY CODE MUST
REMAIN ON ALL DOORS AND WINDOWS
UNTIL INSPECTIONS ARE APPROVED
12'
O H.
C ;1'll<;6t Ed!AN:a siP!L ,',L"u 01";J't'v6l::ly1 WUh?`
,fol 'If rsf� �ffluCT&
li
,?,Calf i) U11 MEL
KAY @L j'A ; SPAR-IMW Os�l��� TO
"�i'�PLY @1rcHAl ��i(�("„
!7' -CJ" = Finie6crl Flnnr /�
5/8" thick llcht textured
stucco on typical concrete
block construction
REAR ELEVATION
Overhangs at I' -O" unless otherwise noted on Roof Plan
Roof pitch at 4:12 unless otherwise noted
Arg changes to this plan shall be submitted to the architect
for approval in writing prior to starting construction.
Return ALL Stucco Bands Into Window or Door.
12
SLOPE 4
SCALE: 1/4" = 1'-0"
Union Corrugating Co. 26 ga. 5V crimp metal roofing
FLU: 1211.4 Attach roofing to deck using 49 x 1.5"
wood screws with washer Per Approval over 30 Ib felt
underlayment installed with min. 4" side laps
and 6" end laps fastened with corrosion resistant tin
caps with 1 1/4" ring shank nails spaced 6" o.c.
at all laps and two staggered rows 12" o.c. in field.
Roof deck to be 19/32'' COX plywood nailed to
trusses with 8d x 2.5" long ring shank nails per sheeting
attachment detail on roof plan
Max allowable uplift = 85.8 psf
\ Finish Columns with
5/8" thick cut coral
finished stucco bands
# 1101, 03-)%
ST. LLTCFV rntTKTV Tit
FFVWN1 LL0 FOR
SCALE: 1/4" = I' -O" 1<✓ILS�'E YJ
DATE 3 l
VLAN� l ATPD PER -MIT Al
On NO LNSIVL�C,rlo,
T)IVI5ION
: KEPT ON JOD
A1ADE.
1/8" Thick cut coral stucco over paper
backed wire lath nailed to substrate through
one layer of 15 Ib felt using 8d nails. Substrate
to be 19/32" COX Plywood nailed at 6" o.c.
in field and edges with IOd ring shank galvanized
nails into truss webbing.
12
SLOPE 4
2"
I" T.O.B. rth
22
H r
H
®® .
5/8" thick x cut
coral finished stuccoo bands
O' -O" =Finished Floor Finish Columns with 5/8" thick light
textured
5/8" thick cut coral stucco on typical concrete
finished stucco bands block construction
FRONT ELEVATION
SCALE: 1/4" = 1'-0"
2" x 4" top plate 1/2" drywall ceiling on truss bottom cord
1/2" drywall on
2" x 4" studs at 16" o.c.
base -board I II / 2 x 4" P.T. bottom plate
\ 4" concrete slab with fibermesh OR
6"xC 3*10/10 WWM on 6 mil Visqueen over
clean compacted termite treated fill
_w +,}._,_
2"
0
-� 5/8" thick x 8"w cut
coral finished stucco bands
-0'-4" A.F.F.
ALL CONTRACTOR WARRANTIES BEGIN WHEN THE CLOSING
OCCURS BETWEEN THE BUYER AND WYNNE BUILDING CORP.
AND WILL CONTINUE FOR ONE YEAR FROM THAT DATE
PERMITTING INFORMATION (F=ORM 100)
Braden AIA, PA
Florida Building Code Residential: 5th Edition and ASCE 1-10 for Wind Loading
Building Design Is: Enclosed Risk Category: II Wind Velocity: 165 mph ultimate
Mean Roof Height:
Building Corp.
II' -O" Roof Pitch: 4:12
Architects
Internal Pressure Coe Icent: ±0.18
rp
Sub,lectability to damage from: Weathering: Negligible Termites: Very Heavu
Width of ROOF End Zone: 3'- " Wind Speed: Idr mph ultimate
Wind Exposure Classification: C
2,12
Adjustment factor for Exposure Height.. gg
p g 1.21 x O.6 = 0.126 ASD design
ITCH
Load Combination: ASCE 1-10 Section 2.4 DL+LL; 0L+0.6WL; 0.6DL+0.61DL
Components t Cladding Wind Pressure (NET) Roof Zone: I. +20.6/-32.6 paf
(�12) 281-8258
Roof Zone: 2. +20.6/-51.0 psf
Roof Zone: 3.+20.4/-84.0 psf
Components t Cladding Wall End Zone Width. 3'-4"
Fax
Components E Cladding Wind Pressure (NET) Wall Zone: 4.+35.8/-38.1 psf
�= Roof Zone I
Wall Zone: S. +35.8/-41.8 psf
Walls Zone 4
Components t Cladding Wind Pressure (NET) on Garage Door: +32.0/-40.3 per
E -mall:
Shear Walls Considered for Structure? Yes
Continuous Load Path Provided? Yes
Roof Zone 2
Are Components an Cladding Detai s Provided? Yes
Walls Zone 5
END ZONE
Minimum Soil Bearing Pressure: 2.500 psi, Presumptive: X Bg Test: psi
This Building Shall Have the Following:-
Corner Zones
APPROVED SHUTTERS: X IMPACT GLASS: BOTH: NEITHER:
Roof Zone 3
ROOF LIVE LOAD: 31 psf ROOF DEAD LOAD: 10 psf
FLOOR LIVE LOAD: 45 pisf FLOOR DEAD LOAD: 10 psf
Braden it
Braden AIA, PA
U.1W rine
Building Corp.
Architects
- Planners
S.L. Coconut Avenue
� 2 I
Grand Carlton
11
Telel
(�12) 281-8258
Fax
: (712) 281-8283
Spanish
Lakes
E -mall:
bradenala°comcast.net
St. Lucre
County Florida
Stuart. FL
34994 UAAC000032
GARAGE
RIGHT
Date Drawn
12 -8 -IL
Drawn by:
C.C.U.
Checked by:
D.R.B.
Revisions
Sheet Comm #
1. 1�-2S8
C lata
FLOOR FLAN
1<� CRASH POST DETAIL
TYPICAL
NOTES: SCALE 1/4" = I'-0"
Orientation
Framing
Member
Max. spacing
of fasteners
Nail sizing options for
installation of drgwall into
I.
prior to
Contractor to verify ALL notes and dimensions p
spaced 6" o_c.
Spacing
Maximum
Roof deck to be 19/32 CDX
ste high be 4" diameter
steel
el crash post. Floor
trusses with 8d x 2.5" long ring
proceeding with work.
attachment detail on roof plan
Garage =
Max allowable uplift = 85.8 psf
Flange wth 4 - 3/8"
2,
Contractor to STRICTLY enforce ALL OSHA Requirements.
2" x mm. thickness
sq.
Ceiling
into
slaba(3/8"bolts 50 ksl steel plate)
3.
ALL Lumber to be used as Beam, Rafters, etc.,. to have
12"
13ga 13/8" long with 19/64" head
P -O" X 6'-8"
ZONE 4
4.
a minimum 1,400 P.S.I. fiber stress.
54/e"x 54)8'
H
Single Hung
Solid Core - Wood - 6 -Panel
`
ALL
4.
No dissimilar metals to touch.
2'-8" X 6'-8"
0.098" diameter x 1 1/4" long
elevations.
vanitu to e
ALL
S.
ALL Concrete used for slabs shall be min. 2,500 PSI concrete.
0
'�'
windows in bathrooms to
be tempered
%1
All
ALL Concrete used for vertical filled cells, cont. tie beams etc.. to
O
x
Walls
Either
141,8
manufacturers Specs prior t0 construction
Ib"
m
shall be 3,000 P.S.I. concrete and/or 4,000 P.S.I. grout mix
H.B.
Direction
X3/8"°
8'-0" to 9'-8" A.F.
2/,"
15/64" head
6.
Drywall at ceilings shall be leveled and attached to bottom chord
Vaulted Ceiling
4'
OC
O
of trusses with screws per FBC 8102.3.5.
G board nail 0.086" dia.
° °
2
'
Mrr
1.
ALL wood in contact with concrete shall be pressure treated.
1psum
x 5/8" with 9/32" head.
Ceiling
Perpendicular
8.
ALL wall dimensions are nominal and not finished wall or stud dimensions.
12"
13ga 1 5/8" long with 19/64" head
/e"
9.
ALL plumbing fixtures to be low flow.
ROOM I
b� ;F
8° L
Rod Shelf
10.
Contractor to Provide Drain at water heater in accordance
0.098" diameter x 1 3/8" long
ae
with the current edition of the Florida Plumbing Code.
HO �
D
o
ul
11.
Contractor to Provide a 2'-8" wide door at one bathroom for
handicap accessibility requirements.
a'
Walls
Either
16"
12.
Lowest finished floor t0 be set by Governing Building Department
BAT
6„/,”
W
surveyor to set in field.
Direction
13,
Separation between residence and garage shall be per FBC 8302.6
14,
Door between garage and residence shall be 1-3/4"t 20 min. rated door
Lu
w.H: = Water Heater
15.
Wall and Ceiling shall have a flame -spread classification of not greater than 200 per FBC
8302.9.1
16.
Wall and ceiling finishes shall have a smoke -developed index of not greater than 450 per
FBC R302.9.2
11.
All exposed attic insulation materials installed on attic floors shall have a critical radiant
I" x 6" P.T. Buck nailed to Masonrg Beam
flux not less than 0.12 watt per square centimeter. Exposed foam plastic insulation
block with case hardened nails
I
materials exposed on the underside of the roof deck or on the attic walls shall comply
prior to door attachment
x 11/B" with 19/64" head.
with F.B.C. 8316 - see permit info box of code edition
O I
18.
G�yypsum board material shall conform to ASTM C36, C-19, 04-15, C514, C630, C931
C960, C1002, C1047,01-11, C1178, C12-18, 01395, or C1396 and shall be installed
_-
- Uver
J O
according to the following: (FBC R-702.3.5)
Vent
tfiroug
ro
All
DrywallLocation
Thickness
FL#: 1211.4 Attach roofing to
Orientation
Framing
Member
Max. spacing
of fasteners
Nail sizing options for
installation of drgwall into
and 6" end laps fastened with corrosion resistant tin
caps with 1 1/4" ring shank nails
spaced 6" o_c.
Spacing
Maximum
Roof deck to be 19/32 CDX
wood framingmembers
trusses with 8d x 2.5" long ring
shank nails per sheeting
attachment detail on roof plan
Garage =
Max allowable uplift = 85.8 psf
sq,
Nails
Screws
2" x mm. thickness
sq.
Ceiling
Perpendicular
24"
1"
12"
13ga 13/8" long with 19/64" head
P -O" X 6'-8"
ZONE 4
4.
4'-5%a"x 4'-2%a"
54/e"x 54)8'
H
Single Hung
Solid Core - Wood - 6 -Panel
ZONE 4
ALL
Windows to be aluminum
Windows w/ tint
2'-8" X 6'-8"
0.098" diameter x 1 1/4" long
elevations.
vanitu to e
0
ALL
windows to withstand
pressures In permit info box On
annular -ringed or 5d cooler nail
/2
windows in bathrooms to
be tempered
34 %,"high
All
rough opening
O
x
Walls
Either
141,8
manufacturers Specs prior t0 construction
Ib"
m
0.080" dia. 1 5/8" long with
H.B.
Direction
8'-0" to 9'-8" A.F.
2" x 6" knee -wall
15/64" head
0 o
Vaulted Ceiling
OR
OC
O
G board nail 0.086" dia.
I
Mrr
r
1psum
x 5/8" with 9/32" head.
Ceiling
Perpendicular
24"
T'
12"
13ga 1 5/8" long with 19/64" head
ROOM I
b� ;F
8° L
Rod Shelf
LINEN
ABINET
0.098" diameter x 1 3/8" long
ae
HO �
D
o
ul
annular -ringed or 6d cooler nail
OR
Walls
Either
16"
8'
16"
BAT
0.092" dia. xx 1 1/8" long with
W
Direction
34 y2 "high I
1/4" head
Lu
OR
11
I
G psum board nail 0.0915" dia.
I
DO
x 11/B" with 19/64" head.
Install SGD thru buck Into p I O
block with ti tap -con with
I I/2" penetration at 6" o.c. max. CIINI��IIII
From each corner and 20." o.c. max
thereafter at head per product approval
Use 3/16" tap -con with
1 1/2" penetration at L" o.c. max.
from each corner and 20" o.c. max
thereafter at sill per product alipro
19. ALL ceramic the surfaces installed Shall conform to ASTM A108.1 thru A108.6,
A108.1, A118.1, A118.3, A136.1 and A131.1
20. Cement, fiber -cement or glass mat g psum backers In accordance with ASTM
C1288, C1325, OR C1118 and installed I.A.W. manufacturers recommendations shall
be used as backer for the wall tile in tub areas and wall panels In shower areas.
21. Insulation including facings such as retarders or vapor permeable members installed
within floor -ceiling assemblies, roof -ceiling assemblies, wall, crawl spaces and attics
shall have a flame spread index not to exceed 25 with an accompanyln smoke
developed index not to exceed 450 when tested in accordance with ASTM E 84.
Insulation shall comply with F.B.C. 8316.
Union Corrugating Co. 26 ga. 5V crimp metal roofing
FL#: 1211.4 Attach roofing to
deck using #9 x 1.5"
wood screws with washer Per Approval over 30 Ib Felt
underlaoment installed with min. 4'
side laps
and 6" end laps fastened with corrosion resistant tin
caps with 1 1/4" ring shank nails
spaced 6" o_c.
at all laps and two stayered rows 12" o.c. in field.
Roof deck to be 19/32 CDX
plowood nailed to
trusses with 8d x 2.5" long ring
shank nails per sheeting
attachment detail on roof plan
Garage =
Max allowable uplift = 85.8 psf
sq,
ft.
Total Under Roof=
Simpson HETA 20 or equal
sq.
hurricane anchor at each truss
with (10) IOd x 1 1/2" nails
12
PRE-ENGINEERED TRUSSES
( 24" o.c.) supporting Max.
18101be,
4 �- at 24"o.c. TYPICAL
uplift
(shop drawings bg manufacturer)
Aluminum Drip —� \R-30 blown fiberglass
Edge t Fascia in bottom chord of trusses
/2" drowall with smooth finish
2" x 6" Sub -Fascia Two rows of beam block Filled with concrete
and (U 45 bar cont. in each row. Substi*te
K%can Full o vent vingl soffit installedprecast lintel filled with concrete and (1) 5
using 1/8" de shank x 15" long galy, bar cont. for bottom row over openings
roaring nails with 3/8" dm. head per
product approval - see chart sheet #1 1/2" drgwall ovdr I" x furringg
strips at I6" o.c, with R4.1 ?1 -rod
insulation on tgpical 8" Block walls
5/8" thick light textured - All drywall to be installed per FBC 8102.3.1
stucco on topical concrete and shall meet all pertaining ASTM codes.
block construction ro Mortar to be Type M onlgg pr ortioned per FBC 8601.1
and Mortar ,fonts shall comply with FSC R6OT2J.
Provide Dur -O -Rock at all wet areas (ex. showers, tubs etc...)
#5 bar vert. w/
30" overlap Fill cell with concrete and
at each Filled cell () #5 bar vert. (topical).
Max. spacing shall not exceed
Wood 48" unless otherwise noted
Base see foundation plan notes for
spacing at openings
4" concrete slab with fibermesh OR
6"xV #10/10 WWM on 6 mil Visqueen over
clean compacted termite treated fill
Grade
III-IIII III III 4'.'k "• IIII-IIII IIS
'��I=III IIII=IIII=
1—IIII 11— —III - 1114" x 14" Conerete footing
14" with (2) #5 bart'e cont. and 45
T Y F1 C A L S E C T f O N transverse bars at 48" o.c.
Scale : 1/2" = 1'-0"
N.T.S.
Head
fixed door
sliding door
C v2
AREA CALCULATIONS
Window
Schedule
Living A/C =
1446
sq.
ft.
Front Porch =
141
sq.
ft.
Rear Porch =
200
sq.
ft.
Garage =
321
sq,
ft.
Total Under Roof=
2108
sq.
ft.
2" VTR
JAL
1
1
I
21' VTR
Master rx� -I-
Bath i
I
Lay.
2"
Lay.
4" 1 2' VTR
W.C.JAL
I 1
Shwr. S„ /
Kit. Sink
I
Kitchen 2
I
Lay.
3"
w.c.
Bath #2 Si
S'
C.O. To Septic
FLUMBING RISER
I" x 6" P.T. Buck nailed to
block with case hardened naris
prior to door attachment \
Masonrg Wall
Bottom Track �Tupical Flooring
CJ' 111 Install SGD thru buck, Into
block with 3/16" taf5=con with
S l From
penetration at 6" ." max.
rom each
l 1 d 1 n g D Oor D e t a i f
corner and 20." o.c. max
thereafter at iambs per product approval Jamb
At Masonry Wall NTS
Door Schedule
Window
Schedule
Rough Opening
Mark
Size
Rou h Open.
Window Description
PRESSURE ZONE
I.
4'-5%8"x 5'-3%8"
54%8"x 63%9"
3'-0" X 6'-8"
Single Hung
Fiberglass Panel - Inswing
ZONE 4
2,
11 5'-3 %8"
15" x 63 %4"
Sliding Glass Door
Single Hung
D
ZONE 4
3.
2'-2" x V-2 1/2"
21�2'x 38%8'
Solid Core - Wood - 6 -Panel
Single Hung
P -O" X 6'-8"
ZONE 4
4.
4'-5%a"x 4'-2%a"
54/e"x 54)8'
H
Single Hung
Solid Core - Wood - 6 -Panel
ZONE 4
ALL
Windows to be aluminum
Windows w/ tint
2'-8" X 6'-8"
and mullions per
elevations.
vanitu to e
0
ALL
windows to withstand
pressures In permit info box On
sheet I
ALL
windows in bathrooms to
be tempered
34 %,"high
All
rough opening
dimensions
to be verified by contractor
N
with
manufacturers Specs prior t0 construction
Door Schedule
Mark
Size
Rough Opening
Door Description
PRESSURE ZONE
A
9'-0" X 1'-0"
108" x 84"
Overhead Garage Door
ZONE 4
B
3'-0" X 6'-8"
41 %9"x 8319"
Fiberglass Panel - Inswing
ZONE 4
C.
6'-0" X 6'-8"
011 t
14" x 81 %2" Feer re saeom
Sliding Glass Door
ZONE 4
D
2'-0" X C-8"
Solid Core - Wood - 6 -Panel -Bi-Fold Finished 24" x 81 %2"
E
2'-6" X C-8"
Solid Core - Wood - 6 -Panel
F
P -O" X 6'-8"
Solid Core - Wood - 6 -Panel - Bi -Fold
G
2'-8" x V-8" x 1 %"
Solid Core Wood, Steel, or Masonite Door
H
2'-8" X 6'-8"
Solid Core - Wood - 6 -Panel
J
2'-6" X 6'-8"
Solid Core - Wood - 6 -Panel - Bi -Fold
K
2'-8" X 6'-8"
Solid Core - Wood - 6 -Panel - Bi -Fold
ALL Exterior doors to withstand pressures stated in permit info
box on sheet #I
GARAGE DOOR SPECIFIED IN PRODUCT APPROVAL FORM AND SHALL
WITHSTAND THE PRESSURES STATED IN PERMIT INFO BOX ON SHEET 41
All rough opening dimensions to be verified by contractor
with manufacturer s Shiers hrinr to ce)nstructl
It
8����9'-6-6„
PATIO/SLAB
12" x 12" concrete column block filled
with concrete and (2) 41 bars vert. tied
into lintels above
Covered Porch
EGRESS
12'- 8 "
u
I
MASTER
8'-0" to 9' ! 8" A.F.F. BEDROOM
Vaulted Ceiling 8'-O" A.F.F.
I Flat Ceiling
Install windows thru buck Into
block with 3/16" tap -con with
1 1/2" penetration at 6" o.c. max.
from each corner and 20." o.c. max
thereafter at faints and 20" o.c. may
Exterior face at head and mil per product approval
of wall —\ / \ Buck to be I" x 4" PT
r -----------------T
Block wall in
garage to be
struck block
1 I
I I
I I
I
I
I I
I
3'-5" 9'-O"
3'-4" 5'-4"
Attach buck to block wall with
1/4" dia. Elco cont screws witll min.
1 1/4" penetration at 12" o.c. max
and 4" max from each corner thru
Exterior face 2" x 6" PT Buck
of wan
Aries
I"x4" P.T. Buck nailed to INSTALL VULKEM BLOCK SEALANT #e Wood screws lthru iamb into buck
block with case hardened Wads ON ALL JAMB, HEADER, AND - at so" hence eId IS" o:c. max and
INSTALLATION
J D e L d l l a L w I n d OUB S prior to window attachment SILL BLOCK PRIOR TO BUCK D e t
on NTS
GREAT
ROOM
wunne BuIlding Corp.
Date Drawn
o
Architects - Planners
oo°
_
12-8-16
eS.L. Coconut Avenue
2nere12"
GARAGE
Drawn by:
Tel l : (712) 281-8258
o
C.C.U.
C
VER
I
x 12"
Checked by:
a column block
filled
N
:h concrete and
(2) 41 bars vert.
tied
ORC
Rod Shelf
"
into II
tela above
II' -6"
\
\
6,
2„
vanitu to e
0
r
34 %,"high
N
I
m
H.B.
8'-0" to 9'-8" A.F.
2" x 6" knee -wall
L SET
0 o
Vaulted Ceiling
below counter top
OC
O
I
Mrr
r
DiNING
ROOM I
b� ;F
8° L
Rod Shelf
LINEN
ABINET
I
ae
HO �
D
o
ul
Vanitu to be
BAT
W
34 y2 "high I
Lu
I' -O s/9 9 �4„H1gh41W
11
I
I
DO
O I
KITCHEN
_-
- Uver
J O
Vent
tfiroug
ro
All
r
ang
8'-O" A.F.F.
i
0
o
Flat Ceiling N
Upper cabinets to
extend over Ref.
v
i
1
ly
fdierN
ATH
—
C�
— fTapnuey Rer.
Nar✓-vtaY Pemn
O
Rod E Shelr
N
_
N N
H
—II Betts solation
/ nt
Ill 'I I a
Steel
1�„ $ems detail qn this
Ballard
sheet
#
O
I > #t a
22" x 54"
°
I O
Attic Access
Provide auto
i
I with light I
L
closer
0
-
8'-O" A.F.F.
�Q_ 22„
---
Flat Ceiling
150 Amp
Meter
m
Panel
SECOND
�
m
_�
BEDROOM
E GRGEN RESS Y
GARAGE
OD T OD
0
FI �
Flat Ceiling -O
0
� °
Install windows thru buck Into
block with 3/16" tap -con with
1 1/2" penetration at 6" o.c. max.
from each corner and 20." o.c. max
thereafter at faints and 20" o.c. may
Exterior face at head and mil per product approval
of wall —\ / \ Buck to be I" x 4" PT
r -----------------T
Block wall in
garage to be
struck block
1 I
I I
I I
I
I
I I
I
3'-5" 9'-O"
3'-4" 5'-4"
Attach buck to block wall with
1/4" dia. Elco cont screws witll min.
1 1/4" penetration at 12" o.c. max
and 4" max from each corner thru
Exterior face 2" x 6" PT Buck
of wan
Aries
I"x4" P.T. Buck nailed to INSTALL VULKEM BLOCK SEALANT #e Wood screws lthru iamb into buck
block with case hardened Wads ON ALL JAMB, HEADER, AND - at so" hence eId IS" o:c. max and
INSTALLATION
J D e L d l l a L w I n d OUB S prior to window attachment SILL BLOCK PRIOR TO BUCK D e t
on NTS
EGRESS
wunne BuIlding Corp.
Date Drawn
°M °
Architects - Planners
oo°
12-8-16
eS.L. Coconut Avenue
2nere12"
GARAGE
Drawn by:
Tel l : (712) 281-8258
R GH
C.C.U.
C
VER
D
x 12"
Checked by:
a column block
filled
St. Lucie County Florida
:h concrete and
(2) 41 bars vert.
tied
ORC
_
into II
tela above
II' -6"
\
\
6,
2„
Install windows thru buck Into
block with 3/16" tap -con with
1 1/2" penetration at 6" o.c. max.
from each corner and 20." o.c. max
thereafter at faints and 20" o.c. may
Exterior face at head and mil per product approval
of wall —\ / \ Buck to be I" x 4" PT
r -----------------T
Block wall in
garage to be
struck block
1 I
I I
I I
I
I
I I
I
3'-5" 9'-O"
3'-4" 5'-4"
Attach buck to block wall with
1/4" dia. Elco cont screws witll min.
1 1/4" penetration at 12" o.c. max
and 4" max from each corner thru
Exterior face 2" x 6" PT Buck
of wan
Aries
I"x4" P.T. Buck nailed to INSTALL VULKEM BLOCK SEALANT #e Wood screws lthru iamb into buck
block with case hardened Wads ON ALL JAMB, HEADER, AND - at so" hence eId IS" o:c. max and
INSTALLATION
J D e L d l l a L w I n d OUB S prior to window attachment SILL BLOCK PRIOR TO BUCK D e t
on NTS
Braden It Braden AIA, FA
wunne BuIlding Corp.
Date Drawn
Revisions
Architects - Planners
—
12-8-16
eS.L. Coconut Avenue
2( G r d n d Carlton i I
GARAGE
Drawn by:
Tel l : (712) 281-8258
R GH
C.C.U.
Spanish Lakes
Fax (112) 281-8283
E-mail: bradenaia8comcast.net
Checked by:
Stuart. FL 34996 UAAC000032
St. Lucie County Florida
D.R.B.
Sheet
2.
OF 5
NTS
Comm #
I�-2S8
I DETAIL AT GARAGE STEPDOUIN
12" x 12" concrete column
block filled with concrete
and (2) #1 bars vert. tied
into lintels above
Top of footer
I6" below finished
CALE 1/2" = I' -O"
30"
COLUMN FOOTING DETAIL
30"x30"xl6" concrete
column footing with (4)
#5 bars each sway
SCALE 1/2" = 1'-O"
FS
GARAGE CURB DETAIL
SCALE 1/2" = I' -U
2" x L" PT wood secured with \
3/8"dia. x C anchor bolt at 18" o.c.
overhead door track secured to wood
,Iamb per manufacturer's product approval
Garage Door Jamb Detail
GARAGE DOOR TO WITHSTAND PRESSURES STATED NTS
IN PERMIT INFO BOX ON SHEET 41. SEE PRODUCT
APPROVAL FORM FOR MANUFACTURER MAKE AND MODEL.
tilled Cell rlasonry L olumn UJILn vne
45 From Footing To Beam Each.
Conc. FIII To Be 3000 PSI
See Floor Plan For Location
Double Filled Cell Column
NTS
Braden it
Braden AIA, FA
Architects
- Planners
IF
F4 11
Tel
: (172) 287-8258
Fax
("172) 281-8283
E-mail:
bradenaia8comcast.net
Stuart. FL
34996 #AAC000032
WITH 2 45 BARS CONTINUOUS
F
12"W
X 12"D
STRUCTURAL NOTES:
WITH (2) 45 BARS CONTINUOUS
30"
x 30" x ICD
COLUMN FOOTING WITH (4) #5 BARS EACH WAY
818"W
x 8"D
THICKEN SLAB EDGE
WITH 1 45 BAR CONTINUOUS
14"W
x 14"D
F5
With
F4
MONOLITHIC FOOTING
I. ALL FOOTING ARE DESIGNED FOR A MINIMUM OF 2,500 PSF SOIL 9. SLOPE ALL PORCH SLABS, COVERED WALK, ETC. AWAY
BEARING CAPACITY, IF ANY SUB -SOIL, MUCK OR NON-UNIFORM FROM HOUSE TO DRAINS (IF PROVIDED) PER PLANS
7_
I I
CONDITIONS EXIST, REPORT TO ARCHITECT AND OBTAIN
I
- - - - -00 00_1_1_1_1_ 00 00
PROPER ENGINEERING DATA FOR DESIGN.
l0. FOLLOWS:
L
- - _1_1_1_:_
1_ - - - F4-
° t - - - ® - L
DESIGN LOADS ARE AS
2. ALL SLABS AND FOOTINGS TO BE A MINIMUM 2,500 PSI AT 28 DAYS ROOF (DL+LL) = 41 PSF
-
I Ia J� I
ALL COLUMNS, FILLED CELLS, AND BEAMS SHALL BE MIN. 3000 PSI WIND VELOCITY = PER PERMIT INFO BOX ON SHEET #I
Filled cell under -
BE 3000 PSI OR 4,000 PSI GROUT MIX AT 28 DAYS EXPOSURE ="C"
i girder above O i FI I
O
3. POISON SOIL AND COVER W/ 6 MIL. VISQUEEN WITHIN 24 HOURS. NO
SOIL POISONING TO BE ACCOMPLISHED OUTSIDE OF FOUNDATION. I. ALL REINFORCING STEEL SHALL BE GRADE 60, MEETING ASTM A-16, &
O
1 - � Rear Patio/Slab
I
4 GROUND FLOOR SLAB TO BE A MINIMUM 4" THICK W/ 6X6 10/10 A-35 SPECIFICATIONS. ALL ANCHOR TO BE A - 30-1 STEEL.
-
Lu be poured separate L
I F4 L1L from the house slab. T
WELDED WIRE MESH REINFORCING ON 6 MIL. POLYETHYLENE VAPOR 12, ALL DOWELS, SLEEVES, CONDUITS, INSERTS, BLOCKOUTS, ANCHOR
BARRIER ON TERMITE TREATED, CLEAN MACHINE COMPACTED FILL
1 O O
I I
°
BOLTS AND FRAMES SHALL BE IN PLACE PRIOR TO POURING CONCRETE.
(MINIMUM 95% DENSITY), LAP POLYETHYLENE 12" MINIMUM, FIBERMESH FOR OPENINGS AND SPECIAL FEATURES OMITTED ON THESE PLANS,
v7 r
I I Thicken 'd
MIX MAY BE SUBSTITUTED FOR WELDED WIRE MESH.
SEE ARCHITECTURAL OR MECHANICAL PLANS WHERE APPLICABLE.
x`m 4tL
24°w x under l 2
a O 1 under filled cell FI I
5. LOT TO BE CLEARED OF ALL SMALL PLANT GROWTH AND DEBRIS
00 O O ° O O 00 under girder bearing.
BEFORE FILL IS BROUGHT IN. FILL TO BE SPREAD IN 12" LAYERS AND
PSI IN AREA OF 13. MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS:
FI 10-
-
MACHINE COMPACTED TO A MINIMUM OF 2500
FOOTING: 3"
1
BUILDING CONSTRUCTION BEAMS: 1-1/2"
R ear Patio/Slab to I
° I be flush with bottom of
m
6. TEST FOR FILL COMPACTION MINIMUMS PRIOR TO FORMING SLAB,
i sliding door recess. " 1
Slope I/2
q�
A, LAP ALL REINFORCING STEEL A MINIMUM OF 48 BAR DIAMETERS.
_a
1
u-
-I- GENERAL CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND
DIMENSIONS. BRING ANY DISCREPANCIES OR OMISSIONS TO THE 15. USE STRUCTURAL GRADE WOOD WITH A MINIMUM Fb OF 1600 PSI
ATTENTION OF THE ARCHITECT, 16. ALL STANDARD LUMBER SHALL BE SYP WITH A MINIMUM Fb OF 1000
8. GARAGE FLOORS TO BE SMOOTH TROWEL FIN15H (SLOPPED PER PSI OF NO.2 SOUTHERN PINE, UNLESS NOTED OTHERWISE.
I I
FOUNDATION PLAN). PROVIDE 1-1/2" RECESS FOR OVERHEAD DOOR 1-1 ALL LUMBER IN CONTACT WITH ANY CONCRETE OR MASONRY SHALL BE
-18 1
O F L 4 N PRESSURE TREATED. FASTENERS TO HAVE MIN. G185 RATING.
U D T 10 �l
I JE
01
32'-8" °
Y /4
1 I
I. Any changes to plans must be submitted to the architect SCALE: I/4" = 1'-O"
H.B.
for approval before proceeding with construction.
Termite Protection for New
O 4" concrete slab with fibermesh OR
I 6"x6° WWM 6 ell en over O
C)l
2. Contractor shall be responsible for verification of all
dimensions before construction. Construct
I ar co to
clean co patted termite treated fell
reate
I
notation and starting
3. Soil conditions assumed to be 2500 psf, Should any other conditions be
Soil treatment used for subterranean termite prevention
encountered, the architect shall be notified in Writing for revision inside the foundation perimeter shall be done after all
O I I
ry
�. Verify all recess thickness at Showers, tile, eta.... excavation, backf1111ng and compaction is complete.
-i
S. Contractor to provide filled cell With concrete and i U5 bar Vert. at 48 If soil area Is disturbed after initial chemical soil treatment
O.c, max. Provide (1) filled cell on each side of openings upp to 5'-11" Wide, area shall be re -treated with a chemical soil treatment o
boxed framed.
-
- 1FI i/� '
-; ° CI] -
T_ I
(o' -O" ncluding spaces or
Provide (2) filled cells on each side of openings from to 9' -ll"
b
_i,
and Provide (3) filled cells on each side of openings from 10'-0" and Up Treatment must be in accordance with the rules and laws
Contractor to see plans for any other condition used. Foundation walls established bg the Florida Department of Agriculture and
shall have filled cells at 24" o.c. unless otherwise noted (see section) consumer services.
l,. Contractor to provide for Form Board Survey - Form oar
FBoard Survey Protective sleeves around metallic piping penetrating 1
Truss Company to truss Construction concrete slab on grade floors shall not be of cellulose
°
to be provided to prior
1. Contractor top rovide for soil test prior to construction and provide containing materials and shall receive application of
termiclde In annular space between sleeve and pipe.
4 -�
a copy of soil test to architect for review prior to construction
1
8, ALL Reinforcing steel shall be grade 60, meeting ASTM A-16 ando
O o__ � a 1
A-35 specifications. ALL Anchors to be A-307 steel.
— —
9_ Provide a minimum of 3" concrete protection at footings and
_ _ _ _ _ _
— I
IFI I
-
1-1/2" concrete protection at beams For ALL reinforcing bars.
� - 4"0 Steel Ballard
1 ? J� 1 ®filled w/ Concrete 1
#
i
Thicken to 8"x8"
v F
QJI F I O
#5 bar vert. w/ edge
30" overlap SEE TYPICAL with concrete and 4" concrete slab with flbermesh OR ��
I 1 I
at each filled cell ECTIONS one #5 bar continuous b' x6" #10/10 WWM on 10 mil Visqueen over m U E
clean compacted termite treated fill a Wm
w N
I I 1 v ' I
a m
GRADE
4" concrete slab with flbermesh OR H N
u_
1 1 w w E
�
6"x6" #10/10 wwm on 10 and visqueen over
clean compacted termite treated fill 00 ' _ _
ill 1 1
1 I
1
Grade IIII IIII I I I I III
`- -
a 00 1 L a ! 1 0
I r00
0-0 I'
m
- 2 _ _ _ 3$„
it
N
E; - ——IIII-
' 8-F RCH SLAB EDGE DETAIL
// � r1
foox twit concrete monolithicFI
footing with (2) 45 bars cont. SCALE /2" = '-O"
1 S IE
/ 0O u
3
------------- IFS o
14"
#5 bar vert, w/
OO O' O O I W Q3O U F5 I
F I TYPICAL FOOTING DETAIL 30" overlap
=_ _
I F4 ° ° 1 ula I °
SCALE I/2° = I' -O" at each filled cell SEE TYPICAL
1 1 x
ECTIYPI
Filled Cell Masonry Column With One
CIL I
4" concrete slab with flbermesh OR Adjust curb height
6"x6" #10/10 WWM on 10 mil Visqueer over based on gar. floor 4" concrete slab with flbermesh OR #5 From Footing To Tie Beam
1 1
slope. 6"x6° 410/10 WWM on 10 and Visqueen over Conc. Fill To Be 3000 PSI
clean compacted termite treatedfill clean compacted termite treated fill See Floor Plan For Location
r
N I
r L - _ - _ Recess for
#5 bar cont. S15pbar In curb
°� _ - - -� - - - °� _
° 00 ° Garage Door 00 00
Step per
foundation plan Grade .;
�L
2" x 12" concrete column block filled
N
E` Felled Cell Column
with concrete and (2) #i bars vert. ti
edSingle
into lintels above
0" (2) #5 bars cont. bottom steel 14% x 14"d concrete monolithic NTS
footing with (2) #5 bars cont.
I DETAIL AT GARAGE STEPDOUIN
12" x 12" concrete column
block filled with concrete
and (2) #1 bars vert. tied
into lintels above
Top of footer
I6" below finished
CALE 1/2" = I' -O"
30"
COLUMN FOOTING DETAIL
30"x30"xl6" concrete
column footing with (4)
#5 bars each sway
SCALE 1/2" = 1'-O"
FS
GARAGE CURB DETAIL
SCALE 1/2" = I' -U
2" x L" PT wood secured with \
3/8"dia. x C anchor bolt at 18" o.c.
overhead door track secured to wood
,Iamb per manufacturer's product approval
Garage Door Jamb Detail
GARAGE DOOR TO WITHSTAND PRESSURES STATED NTS
IN PERMIT INFO BOX ON SHEET 41. SEE PRODUCT
APPROVAL FORM FOR MANUFACTURER MAKE AND MODEL.
tilled Cell rlasonry L olumn UJILn vne
45 From Footing To Beam Each.
Conc. FIII To Be 3000 PSI
See Floor Plan For Location
Double Filled Cell Column
NTS
Braden it
Braden AIA, FA
Architects
- Planners
411
S.E. Coconut Avenue
Tel
: (172) 287-8258
Fax
("172) 281-8283
E-mail:
bradenaia8comcast.net
Stuart. FL
34996 #AAC000032
Wgnne Building Corp.
2' Grdrd Carlton f
Spanish Lakes
St. Lucie County Florida
Date Drawn Revisions Sheet
12-8-16 Comm
GARAGE Drawn by:
RIGHT C_C.U. :3,
Checked lb�y:
D.R.B. OF 5
FOOTING
SCHEDULE
Mark
Sizo
Description
FI
14"W
x 14"D
MONOLITHIC FOOTING
WITH 2 45 BARS CONTINUOUS
F
12"W
X 12"D
MONOLITHIC FOOTING
WITH (2) 45 BARS CONTINUOUS
30"
x 30" x ICD
COLUMN FOOTING WITH (4) #5 BARS EACH WAY
818"W
x 8"D
THICKEN SLAB EDGE
WITH 1 45 BAR CONTINUOUS
14"W
x 14"D
F5
With
Curb at Garage
MONOLITHIC FOOTING
WITH 2 #5 BARS CONTINUOUS - CURB ® O' -O"
Date Drawn Revisions Sheet
12-8-16 Comm
GARAGE Drawn by:
RIGHT C_C.U. :3,
Checked lb�y:
D.R.B. OF 5
ROOF: SHEETING
ATTACH>IENT DETAIL
I. Minimum Nall Size = 8d ring shank (min. 2.5" long)
2. Minimum Screw Size = #8 x 2"
3. Minimum Sheathing Thickness 19/32" CDX Plgwood
4. Use nails or screws based on pressure for roof stated
in permit Info box on these plans for zone 3
Ke
Area
Edge
Field
FastenerPressure
BI
continuous In each row. Hook vert. bar over top bar with
Zone I
45 90° bend bar with a 10" min. lap at top bar.
is
8d ring shank
45 psf
Bottom
Steel
Zone 2
4"
L"
8d ring shank
% Pelf
;5Zone
3
4°
4"
Sd ring shank
84 psf
1**
Zone 3a
L"
L"
48 wood screw
112.5 psf,
** Use nails or screws based on pressure for roof stated
In permit info box on these plans for zone 3
Provide U5 bars with mm. 48 bar
diameters overlap Into beam. Tie
filled cell steel into continuous
beam block steel.
Provide U5 bar set In pre -cast
lintel into beam where length of
the opening calls For it.
Provide Cast -Crete—`— -8—
SUB-OB/OT precast - _ _ _ _ _ _ _ ` _ _� 'LL
lintel set in mortar
Min. B" Bearing
Veriry with Flan
Concrete 12"x 12"
/Lintel Column Block
#7
Rebar
Rebar <
48 Bar Dia.
Min. Overlap
Column to LIntl ttachm&nt
NTS
SEAN SCHEDULE
Mark
Size and Description
Clear
Span
Two rows of beam block filled with concrete and 1 45 bar
BI
continuous In each row. Hook vert. bar over top bar with
2'-8"
45 90° bend bar with a 10" min. lap at top bar.
Additional Precast Lintel
tt5 bars
- `'('+•'`)" CLEAR
Lintel
Length
Bar
Length
Clear
Span
„ u
A
Bars
ii ii
B
Bars
2'-10"
2'-8"
I'-6"
2?t3
none
ii 1 i t t
Bottom
Steel
Size
Top
Steel
Size
Max
Gravity
Load
(PLF)
Max.
Uplift
Load
(PLF)
Max
Lateral
Load
(PLF)
L22
2'-2"
3'-L"
8F8-OB/IT
r,w
N
3'-6"
3'-4"
2'-2"
2,43
none
81111 8F8-15AT 8F8-3/271'
L31
T-6"
2'-8"
3'-1"
4'-0"
8F8-013/IT
Additional
4'-0"
3'-10"
2'-8"
2,#3
none
- tt5 bars F.
L45
4'-5"
5'-I0"
CLEA i,: ,'
4'-6"
4'-4"
3'-2"
2.U3
more
• One Row of "H:,`
51-410
5'-2"
4'-O"
2,U3
none
•' Block Above
1
tt5
1138 1
835
"121
L60
2,tt4
none
8111
Precast Lintel
1
tt5
loll
121
534
LBO
8'-O"
T-4"
I Additional i
6'-6"
6'-4"
5'-4"
2.U4
none
tt5 bars ,___y'
591
1'-O"6'-2"
L90
2,45
none
8FIL-IB/IT 8FIL-IB/2T
8'-4"
T-10"
1'-O"
2 u5
none
TOTES,
530
401
L90B
9'-O"
10'-4"
ALL reinforcing steel Is grade 60.
I. min, coverage or steel -LS"
2. min. bearing required a ea. end=s•'
3. standard for reinf. steel -ASTM A615
tt5
TYPICAL LINTEL SECTION
U5
( PRECAST CONCRETE )
1183
- ALL LINTELS SHALL BE MADE BY CAST -CRETE.
- LINTELS SHALL BE FILLED SOLID WITH 3000 PSI CONCRETE
- REFER TO CAST -CRETE CATALOG FOR ALL INFORMATION REGARDING
LINTEL CONSTRUCTION, HANDLING INFORMATION, AND SAFE LOAD REQ.
REQUIREMENTS
- LINTELS OVER 14'-O" LONG ARE TO BE PRESTRESSED.
Provide PT Buck
attached per ,Iamb
etails into filled ce
4" Pre -cast
SIII \
oured Filled Cell
Provide U5 bars with min. 48 bar
diameters overlap in oiled cell. Tie
filled cell steel into continuous
footer steel.
CBS WALL
Scale: 1/2" = 1'-0"
SINGLE PLY REAR GIRDER TRUSS
Nail 2" x 4" blockmrq to vert. leg of
truss with IOd x 1.5' nails at 4" o.c.
Install Simpson MGT into wall using
5/8" dia. threaded rod set min. 12"
into wet beam and (22) IOd nails into truss
Poured Ccncretd
concrete block u
I
I
I
—
I
I
LINTEL
SCHEDULE
I
I
I
Mark
Window
or Doo
Unit
Width
Lintel
Size
Cast -Crete
Specification
Rows of
"H" Block
Above
Bottom
Steel
Size
Top
Steel
Size
Max
Gravity
Load
(PLF)
Max.
Uplift
Load
(PLF)
Max
Lateral
Load
(PLF)
L22
2'-2"
3'-L"
8F8-OB/IT
r,w
N
490
1
tt5
3049
151.9
1024
L31
T-6"
2'-8"
3'-1"
4'-0"
8F8-013/IT
1
tt5
2541
13(3
143
L45
4'-5"
5'-I0"
BFe-OBAT
1
tt5
1 1105 1
909
339
L50
5'-0"
4'-4"
BF8-OB/IT
1
tt5
1138 1
835
"121
L60
4'-8"
T-6"
8111
1
tt5
loll
121
534
LBO
8'-O"
T-4"
SFS-]B/2T
1
tt5
2
U5
152
591
512
L90
T -O"
10'-L"
8F8-IB/2T
1
U5
2
tt5
443
530
401
L90B
9'-O"
10'-4"
8FIL-IB/2T
ONE
1
tt5
2
U5
1533
1183
401
LI00
10'-0"
II' -4" 1
8F8-IB/2T
1
U5
2
tt5
582
494
452
LIOOB
10'-0"
II' -4"
81ii
ONE
I
tt5
2
tt5
1344
1028
452
LI20
12'-0"
13'-4"
8F8-IB/2T
1
U5
2
tt5
411
428
324
L120B
I2' -O"
13'-4'
Bleii /2T
ONE
1
U5
2
U5
1015
7'10
324
L140
14'-0"
15'-4"
8FI4-IB/2T
ONE
1
U5
2
45
1250
609
259
LI60
IG' -O"
IT -4"
BF8-IB/2T
1
U5
2
tt5
300
192
194
LILOB
IL' -O"
IT -4"
8FI1.-IB/2T
ONE
1
tt5
2
US
950
500
194
- ALL LINTELS SHALL BE MADE BY CAST -CRETE.
- LINTELS SHALL BE FILLED SOLID WITH 3000 PSI CONCRETE
- REFER TO CAST -CRETE CATALOG FOR ALL INFORMATION REGARDING
LINTEL CONSTRUCTION, HANDLING INFORMATION, AND SAFE LOAD REQ.
REQUIREMENTS
- LINTELS OVER 14'-O" LONG ARE TO BE PRESTRESSED.
Provide PT Buck
attached per ,Iamb
etails into filled ce
4" Pre -cast
SIII \
oured Filled Cell
Provide U5 bars with min. 48 bar
diameters overlap in oiled cell. Tie
filled cell steel into continuous
footer steel.
CBS WALL
Scale: 1/2" = 1'-0"
SINGLE PLY REAR GIRDER TRUSS
Nail 2" x 4" blockmrq to vert. leg of
truss with IOd x 1.5' nails at 4" o.c.
Install Simpson MGT into wall using
5/8" dia. threaded rod set min. 12"
into wet beam and (22) IOd nails into truss
Poured Ccncretd
concrete block u
I
I
I
—
I
I
v
2 I/j
I
I
I
v
I
>
°
I
I
m
I
`v
or in
m
I
�
I
x
I
II
IOd nails into truss. Add
blocking to
r,w
3LOCKING DETAIL Mush Mounted Shutter Detail
)ER STRAPPING
TER BEARING POINT
1/8" thick light textured stucco installed per
ASTM C 92( over ASTM D type 2 paper backed
wire lath nailed to substrate through one layer of
ASTM D Type 2 felt paper using 8d nails. Substrate
to be 19/32' COX Plywood nailed at 6" o.c. in field -
and edges with IOd ring shank nails into studs.
Union Corrugating Co. 26 ga. 5V crimp metal roofing
FLU: 1211.4 Attach roofing to deck using 49 x 1.5"
wood screws with washer Per Approval over 30 Ib felt
underlayment installed with min. 4" side laps
and 6" end laps fastened with corrosion resistant tin
caps with 1 1/4" ring shank nails spaced C o.c.
at all laps and two staggered rows 12" o.c. in field.
Roof deck to be 19/32 COX plywood nailed to
trusses with 8d x 2.5" long ring shank nails per sheeting
attachment detail on roof plan
Max allowable uplift = 85.8 psf
12
Simpson HETA 20 or equal 4
hurricane anchor at each truss
with (10) IOd x 1 1/2" nails
( 24" o.c.) supporting Max.
ISIOIbs. uplift
Aluminum Drip —
Edge t Fascia
2" x
full o vent vingl soffit Installed
8" dia shank x 15" long galv.
nails with 3/8" dia. head per
approval - see chart sheet Ul
into lintels above
thicken edge to 8"x8"
with concrete and
one U5 bar continuous
BEYOND
Top of footer
16" below finished floor
Aluminum Drip
Edge it Fascia
Flash and Counter
flash
Nail ledger to
naLl— —..J •�..
Aluminum Panel
Sizes per manufacturer
— see Tuoical Stud Deta I
7/8" x 3/32" Wing Nut w/
appropriate washer and spacing
per manufacturer's Details \
0:
Stud Detail
Stud w/ Die Cast Zinc NTS
Nickel Plated Wing Nut
v4•
nts
Brace Gable end
with 2" x 4" SYP U2
8ft back nailed to bottom
of top chords using (2) IOd
nails at each truss
PRE-ENGINEERED WOOD TRUSSES
8 24"o.c- TYPICAL
( shop drawings by manufacturer )
\R-30 blown fiberglass
in bottom chord of trusses
-1/2" drywall with smooth finish
Two rows of beam block filled with concrete
-and (U U5 bar cont. in each row. Substitute
precast lintel filled with concrete and (1) 45
bar cont. for bottom row over openings
1/2" drywall over I" x furring
strips at I6" o.c. with RA fi-foil
-insulation on tgpical 8" Block walls
All drywall to be installed per FBC R102-3-1
and shall meet all pertaining ASTM codes.
Mortar to be Type "M" only proportioned per FBC 8601.1
and Mortar ,joints shall comply with FBC 4601.2.1.
Provide Dur -O -Rock at all wet areas (ex. showers, tubs etc...)
Simpson HETA 20
hurricane anchor at each truss
( 24" o.c.) supporting Max.
1810 lbs. uplift
Fill cell with concrete and O O
(U U5 bar vert. (typicaU.
-Max. spacing shall not exceed
48" I h d
ETA 20
Strap
truss to wall using Simpson
MGT with
X
• N
— ROOF PITCH
5/8" dia.
into
threaded rod with min 12"
beam either wet set
embedment
4
DRAWINGS TO BE PROVIDED BY MANUFACTURER
�''1
t ri
a 0 -
or in
epoxy with
I t
til U)
��,
(22)
IOd nails into truss. Add
blocking to
r,w
N
490
truss leg per detail on
this sheet
Q
L
B 1
F L A N
N
u)
— OVERHANGS
3
X
• N
— ROOF PITCH
O�
rn
N
�
DRAWINGS TO BE PROVIDED BY MANUFACTURER
/�•�
F_Q
a 0 -
ILI
CL CL
I t
til U)
83E
u
n rli
�
—
N
490
FL 349% UAAC000032
N
Q
L
B 1
BI
460
/
BI
O
I
co
L90 BI
N
BI
W LGO
I
12
I-
L BI L
�
I
cn —
�
2"
U I
I BI
S OPE a to
1 W N
L
UJ
I
I
E
L B
BI L31
..
W U11
- -
l�N�
-- -- -- ii
Union
/j
--/J I-1.
Corru atinCo. 26 a.
5V trim metal roofin
wood screws with washer Per
pproval over 30 Ib Felt O
underlayment installed with min.
4" side laps r-
and „
0)
t In
Is spaced 6" o.c.
caps with 1 1/4" ring shank na
at all laps and two sta`�ered
rows 12" o.c. in Field.
Roof deck to be 19/ 3 CDX
plywood nailed to
attachment detail on or of plan
Max allowable uplift = 85.8 psi
V BI
J�
r- - - - --
O
ttic Aecess
1.4
Q
with light
L - - - - -- SLOPE 4
BI I T (,
I
l
1 P
Td
8'-O" MAX.
( T S
S
TI
2"
j — �—
--
I
I
I
� I
1
1 Bl
BI L31
;
bo I
1 1
BI I BI 1
I
1
I
I
BI L45
I
BI
450 on ET
hurrlca ant r a
2
eat
truss
O
N
BI
( c.) uppo
ting
ax.
.fi
1810 bs. UlDlift
L1bI0
1
B I
B08
440
L9
F L A N
N
u)
— OVERHANGS
3
X
4° concrete slab with eahsqueen
— ROOF PITCH
O�
rn
N
�
DRAWINGS TO BE PROVIDED BY MANUFACTURER
/�•�
F_Q
a 0 -
ILI
CL CL
I t
til U)
83E
u
n rli
�
—
N
Num
FL 349% UAAC000032
N
Q
L
Brace Gable end
with 2" x 4" SYP U2 min.
—8Ft back nailed to bottom
of top chords using (2) IOd
nails at each truss
W,
un ass of erwise note
see Foundation plan notes for
spacing at openings
— OVERHANGS
AT 1'-0"
UNLESS CTHERWISE NOTED ON THIS SHEET
4° concrete slab with eahsqueen
— ROOF PITCH
AT � :12
UNLESS OTHERWISE NOTED ON THIS SHEET
m
6"x6" 4I0/10 WWM on 6 mil il Viover e
/ clean compacted termite treated fill
— TRUSS SHOP
DRAWINGS TO BE PROVIDED BY MANUFACTURER
/�•�
— A N Y C H A N G E S T O
T H I S P L A N
Tublcdl SectIon dt Front Porch
HALL BE SUBMITTED To THE
ARCHITECT FOR APPROVAL IN WRITING PRIOR TO STARTING CONSTRUCTION.
— ALL TRUSS TO TRUSS CONNECTIONS BY
TRUSS MANUFACTURER
— ARCHITECT TO REVIEW TRUSS SHOP DRAWINGS PRIOR
TO CONSTRUCTION FOR LAYOU7 AND UPLIFT VERIFICATION
— CONTRACTOR TO PROVIDE FOR FORM BOARD SURVEY AND TO PROVIDE
FORM BOARD SURVEY TO TRUSS COMPANY PRIOR TO TRUSS CONSTRUCTION
LUynne Building Corp. Date Drawn : Revisions : Sheet Comm 4
12 -8 -IL
2' Grand Carlton f� GARAGE
Drawn by:
, 8
p
Spanish Lakes Checked b I —
St. Lucie County Florida �'
ID, R. OF 5 i
Braden • -
. Architects PlannersI411
/�•�
S.E. Coconut Avenue
83E
-mail: bradenaia8 comcast, netStuart.
FL 349% UAAC000032
HALL BE SUBMITTED To THE
ARCHITECT FOR APPROVAL IN WRITING PRIOR TO STARTING CONSTRUCTION.
— ALL TRUSS TO TRUSS CONNECTIONS BY
TRUSS MANUFACTURER
— ARCHITECT TO REVIEW TRUSS SHOP DRAWINGS PRIOR
TO CONSTRUCTION FOR LAYOU7 AND UPLIFT VERIFICATION
— CONTRACTOR TO PROVIDE FOR FORM BOARD SURVEY AND TO PROVIDE
FORM BOARD SURVEY TO TRUSS COMPANY PRIOR TO TRUSS CONSTRUCTION
LUynne Building Corp. Date Drawn : Revisions : Sheet Comm 4
12 -8 -IL
2' Grand Carlton f� GARAGE
Drawn by:
, 8
p
Spanish Lakes Checked b I —
St. Lucie County Florida �'
ID, R. OF 5 i
PANEL
"A" LOAD CALCULATION
SHEET
Electric Notes_
PANEL
"A"
BR
oles BR
Load
3.5 kw
Wire
Description
circ9
circ9
Description
2 40
1.0
kw
98
A/C comp
I
2
AHU
2
,500
1,500
1
1,200
3
4
1,200
1,200
2 30
43
kw
910
40 gal. water HTR
5
G
Range
1,800
1
810
BIO
#12
1.2 kw
e
1
912
1 20
1.8
kw
912
Pump
9
10
Or er
First 10000 Watts
20
1
412
10,000
20
12
912
O
1 20
1.5
kw
912
20
13
14
Dishwasher
1 20
1.5
kw
412
Microwave
15
14
Refrigerator
1 20
1.5
kw
#12
Kitchen S.A.C.
I,
18
Recepts
1 20
1.5
kw
#12
Kitchen S.A.C.
19
20
Recepts
1 20
1.2
kw
912
Clothes Washer
21
22
Recepts
1 20
0.81
kw
#12
Garage Door Opener
23
24
Recepts
1 20
1.4
kw
912
25
24
Recepts
1 20
1.92
kw
912
21
28
Recepts
I 15
414
General Lighting
29
30
Recepts
1 15
914
General Lighting
31
32
Recepts
1 15
914
General Lighting
33
34
Exterior GF -Cl
1 15
#14
General Lighting
35
34
Bathroom GPI
1 20
912
Smoke Detectors
37
38
General Lightir
1 20
912
Bathroom GFI
39
40
General Lightir
snare-
4l
42
snare
PANEL
"A" LOAD CALCULATION
SHEET
Electric Notes_
i0ire
Load
BR
Poles
910
3.5 kw
30
2
3
5,205
2
1,500
3,000
I
12,000
12,000
U.
12.0 kw
50
2
,500
1,500
1
1,200
1,200
1
1,200
1,200
910
5.0 kw
30
2
4,500
4,500
1
1,800
1,800
1
810
BIO
#12
1.2 kw
20
1
912
1.2 kw
201
31.415
912
20
1
912
First 10000 Watts
20
1
412
10,000
20
1
912
O
20
I
412
1
20
1
912
duration of the work.
20
1
912
Calculated Wattage Divided by Voltage = Total Amps
Panel Size
20
1
912
20
1
912
year from closing sale of house.
20
1
912
24. All exposed wire below 9'-1" shall be installed in metal EMT
20
1
914
is
1
914
15
I
PANEL
"A" LOAD CALCULATION
SHEET
Electric Notes_
411
Load Description
Qtq-
Watts
Total(Watts)
General Lighting (3 watts
Small Appliance. C.ircuit(s)...
Range
Refrigerator
Microwave
Dish Washer
Clothes .Washer......
Clothes ,Dryer .....
Water Heater
Water Pump,
Garage. Door Opener.
sq. ft.)
... ...
1135
3
5,205
2
1,500
3,000
I
12,000
12,000
1
1,200
1,200
1
,500
1,500
1
1,200
1,200
1
1,200
1,200
1
5,000
5,000
1
4,500
4,500
1
1,800
1,800
1
810
BIO
Il.
ALL A/C Equipment shall comply with energy calculation
20. All material shall be new and shall bear underwriters'
12.
Total
Watts
31.415
contractor, the completed system shall be fully operative.
13.
Contractor shall pay for all fees, permits, testing, and
21. All equipment and panel sizes shall be verified before
First 10000 Watts
5100%
1
Io,000
10,000
Remainder
21,415 1140%
1
O
10,941
Electric Heat or A/C
10,000 SL5%
1
10,000
10,000
Calculated Load
duration of the work.
Watts
Voltage
16.
30,911
240
Calculated Wattage Divided by Voltage = Total Amps
Panel Size
Required
129.03
= 150 Amps
H.B.
Ve_n_t _thru__
S offlt
PATIO/SLAB
GR AT
ROOM
I
I
Center Registers1130
63 CFM
163 CFM on ceiling fan
IOxlOxl I OlOxl
DINING
ROOM
W
12 fR%A '
x4
A T �ei�ingJ
i
I
I
I
I
I
I
83 CFM
12x/xl j
I
SECOND
BEDROOM
12xl2x8 1 /I
Balanced Air B/A .
= THERMOSTAT LOCATION O
MECH,4NIC/4L
12"
ni
110 CFM
12xsx8
M TER
BE ROOM
110 CFM
i2x8x8
12xl2x9
B/A
ip ----- ----- a'I
12%12x9 °
B/A
H.H.
1 C /\
B s 8x4 x4
8x x4
21 M
Vent-t{1ru_
Soffit
LJ i
I
w I �., ss" x 34'
Attic Access
�j= with light
COVERED
PORCH
GO Ampf Meter
Panel 1A1 �1
GARAGE
Ir -----------------i
I 1
I I
I 1
I I
I I
I I
I i
I i
I I
I 1
I i
A/C disc.
I50
92/0 Aluminum feed AMP
I '/2'Conduit � pCB
A EL
M TE
AHU
2" PVC (FPL
2" rigid service FPL Bare 9G copper wire
9 �to 95 cont. rebar in slab
ELECTRICAL RISER
- Contractor shall use AL -CU Landing lugs. NTS
- Contractor shall torque lugs I.A.W.
manufacturers recommendations which
shall be verified prior to construction
Braden t
Braden AIA, FA
SCALE: 114" = I' -O"
Electric Notes_
411
S.E. Coconut Avenue
I.
Use copper wire ono aluminum.
Alall
11. It Is not the Intent of these plans to show every minor detail
2.
Provide and wire required smoke detectors.
of construction. The contractor shall furnish and install
3.
Contractor to verify location of electrical
all Items for a complete electrical system and provide all
service and provider.
the requirements necessary for the equipment to be placed in
4.
ALL paddle fans shall be on a rheostat.
proper working order.
S.
ALL bath and kitchen receptacles to be GFIprotected.
18. All work shall be done in accordance with the N.E.C. and
6.
ALL exterior outlets to be WP/GFI protected.
shall comply with all local codes and ordinances, and shall
1.
Recessed cans to be installed per NFPA requirements.
meet all standard requirements of the local electric utility
8.
AF -Cl receptacles are required in all rooms except
and telephone company.
Kitchen, Bathrooms, and Garage.
9.
A/C Return Air Balance Must comply. w/ FBC RM1402
19. The electrical system shall be completely and effectively
10.
A/C Refrigerant lines that are run thru slabs must be
grounded as required by the latest edition of the N.E.C.
sleeved in PVC
Il.
ALL A/C Equipment shall comply with energy calculation
20. All material shall be new and shall bear underwriters'
12.
All work shall be performed by a licensed electrical
labels where applicable.
contractor, the completed system shall be fully operative.
13.
Contractor shall pay for all fees, permits, testing, and
21. All equipment and panel sizes shall be verified before
Inspections including blower testing where required.
ordering. The contractor shall provide circuit routings to
14.
All work shall be coordinated With other trades to avoid
suit the conditions.
interference with the progress of construction.
,lob
15.
All required insurance shall be provided for protection
22. Furnish and install all fixtures as called for on the plans
against the public liability and property damage for the
or as selected by others.
duration of the work.
16.
Contractor shallguarantee all materials and workmanship
23. All raceways and pipes placed in or through any concrete
free of defects for a period of not less than two years from
slab shall be spaced a minimum of three diameters of the
the date of acceptance or certificate of occupancy, or one
largest conduit or pipe from any other service.
year from closing sale of house.
Correction of defects shall be completed without additional
24. All exposed wire below 9'-1" shall be installed in metal EMT
charge and shall include replacements or repair of any
conduit.
other phase of Installation that may have been damaged.
25 Dryer Vents to be installed per FBC RM15O2
GO Ampf Meter
Panel 1A1 �1
GARAGE
Ir -----------------i
I 1
I I
I 1
I I
I I
I I
I i
I i
I I
I 1
I i
A/C disc.
I50
92/0 Aluminum feed AMP
I '/2'Conduit � pCB
A EL
M TE
AHU
2" PVC (FPL
2" rigid service FPL Bare 9G copper wire
9 �to 95 cont. rebar in slab
ELECTRICAL RISER
- Contractor shall use AL -CU Landing lugs. NTS
- Contractor shall torque lugs I.A.W.
manufacturers recommendations which
shall be verified prior to construction
Braden t
Braden AIA, FA
Architects
- Planners
411
S.E. Coconut Avenue
Tel :
(112) 281-8258
Fax :
(112) 281-8283
E -mall:
bradenaia5comcast.net
Stuart. FL
34996 UAACOO0032
Exhaust Duct
Thru Soffit -
Wire For
.
Front Post
Light
PATIO/SLAB
/covered Porch \\
MASTER
BEDROOM
I
1
V
V V /
IEP/
G I /
R I AT Smoke / Carbon J) - - - -
R OOP M Monoxide Detector
Combo �
I S
I M
I
I
I II � I L i SET
II I
II I
DINING I II - - -
ROOM I '
I I G J, F i� - -GFfi G F I
KITCHEN
Q I
J _ Smokg / Carbpl 4 J
Monoxide Detector
ri Hines Combo
3'-2" 3'-2" 24" \
M
50 M I\ / O
IGF
\ I�
HI
M
� GFI I
------- L42"1h GFI
�_\ I H.
r W �I ---
( enter ? I , 22" x 54" I
i O Attic Access
with light i
BEDROOI�f PC
V v Cr
FB �\
1 � \
GFI
�ONERED /
P OR -C 4 � f-1
MEMM
Optional I 1y0 Amp
P
panel location / Panel
ull chain /
light in attic /
a�"h GFI
GARAGE
Garage
Door
Opener
r----------------- I
I I
I I
1 I
I I
I I
I
I I
I I
I I
I I
N
N
Exhaust Duct
Thru Soffit
4" Exhaust
Duct Thru
Wall
P. ',GPI
ratdile.
N "\under disc.
not shown for
clarity
A/C
/I
eter
ELEC7 f=L/4N
SCALE: 1/�4" = I'-0"
6,-3"
a�
inci
Op
Post Light with
I Photo cell
Wgnne Building Corp.
�2' Grand Carlton II
Spanish Lakes
St. Lucie County Florida
Attic Venting Calculations FBC 2309.7
Total Attic Space = 212.f sq. ft.
Venting Ratio 1/150 = 14.1(0 sq, ft. required
Frovide A Continuous Vented Soffit
Date Drawn Revisions
12-8-I
GARAGE 12-8-16
RIGHT Drawn by:
C.C.U.
Checked by:
D.R.B.
Sheet Comm 4 `
E-1
OF 5
iu
a
Exhaust Duct
Thru Soffit
4" Exhaust
Duct Thru
Wall
P. ',GPI
ratdile.
N "\under disc.
not shown for
clarity
A/C
/I
eter
ELEC7 f=L/4N
SCALE: 1/�4" = I'-0"
6,-3"
a�
inci
Op
Post Light with
I Photo cell
Wgnne Building Corp.
�2' Grand Carlton II
Spanish Lakes
St. Lucie County Florida
Attic Venting Calculations FBC 2309.7
Total Attic Space = 212.f sq. ft.
Venting Ratio 1/150 = 14.1(0 sq, ft. required
Frovide A Continuous Vented Soffit
Date Drawn Revisions
12-8-I
GARAGE 12-8-16
RIGHT Drawn by:
C.C.U.
Checked by:
D.R.B.
Sheet Comm 4 `
E-1
OF 5
A=LIFE SAFETY WARNING
This symbol identifies Life Safety Warnings that should be read
given special attention by all persons installing trusses.
5PAGING NOTE
ARRANGE WITH CRANE OPERATOR IN ADVANCE
FOR A SPREADER
BAR OF 17' - 23' IN LENGTH
�1
ALL TRUSSES ARE TO BE SET
AT 2'-01 ON CENTER
EXCEPT AS NOTED
MULTIPLE PLY TRUSSES MUST BE
ASTENED TOGETHER PER ENGINEERIN
BEFORE SETTING. REFER TO
ENGINEERING DRAWING TO DETERMINE
JA IF MULTIPLE PLY. A
DON'T LIFT TRUSSES
WITH SPANS LONGER THAN
30' BY THE PEAK.
CONSULT BCSI
30' Span or less Al 30' to 60' Span A&
0 degrees Spreaer Bar
or less
f— ) /2 —1,
T g Line span approx.
REFER TO BCSI
Truss must be set this way if crane used.
Truss is an example, year tmas may not match.
Insist crane operator sets truss this way.
Iraq *_Approx 2/3 to_,,
Lina 1/2 of Span
REFER TO BCSI
iss must be set this way if crane used.
This is an example, truss may not match.
Insist crone operator sets truss this way.
All load bearing walls, headers,
beams & lintels must be in place
at indicated height before trusses
Q are installed. AL
AIR HAN��—�R NOTA
UNLESS NOTED ELSEWHERE ON THIS LAYOUT, THESE TRUSSES
ARE NOT DESIGNED FOR AIR HANDLERS IN THE ROOF OR FOR
ANY OTHER A/C REQUIREMENTS. THIS MAY BE IN CONFLICT
WITH BUILDING CODE AND A/C DESIGN REQUIREMENTS.
CONSULT WITH BUILDING DEPARTMENT AND A/C CONTRACTOR.
U REPRESENTS A HANGER
Carrying Girder
For Truss to Truss
Connections see
hanger/connectorTNalisbe as
de tabs
schedule in engineeringe nails.
package.
SEAT PLATES BY CHAMBERS
INDICATES LOAD BEARING WALL
REQUIRED BY TRUSSES
SUPPLIED BY BUILDER
AT A HEIGHT OF 8'-1"
ABOVE FINISHED FLOOR
12
4.00 F_
upset --114" heel=315/16"
PLUMB CUT END
2 x 4 Top Chord
WALL HEIGHT 8'-1"
TYPICAL END DETAIL
12
4.00 F_
12 2.00 8�
" upset=11/4" heel=3 15116"
PLUMB CUT END
2 x 4 Top Chord
WALL HEIGHT 8'-1"
END DETAIL: A
Ll
ARRANGE WITH CRANE OPERATOR IN ADVANCE
FOR A SPREADER
BAR OF 17' - 23' IN LENGTH
�1
ARE
Do not
stand
on
trusses until
they are
braced
per BCSI
& properly nailed
Wind Design Criteria
ASCE 7-2014
to
straps
&
hangers
GARAGE LEFT
FABRICATION AGREEMENT
,T,RIIsen CANNOT BE STARTED UNTILTHIB AORE�RIENT 18 SIGNED b RETURNED
,TM legal description of the property where the busses will be Installed Ic ..
a In #Wct ardance with this truss which b aro solo authotlty for determininngg successful fabrication of @le trruusses. apram layout,
2
An dimensions In this layout have been varl11ed by the underlined.
' •3. Unlade written notice Is far by certified mea to t�nember Truss within ten (1�
such Neaten nodes NM%ed Chambers Trues shholl have three (3) busL»a& dnd ays !n which
to, begin ropelrs rogdred, tato wbatiWe oMertreses, et Cnsmber op n.
:ItTho undersigned admaNedges receipt of"SCSI 1-W summary sheaf by TPI d WTG4
,�g,[�b�e�avory to to Job site. h Is the buyefi roaponalbalty to make the Job aIle eultebb for
de)H{ery Chamber Trae hes me sole auNorlty to determine the suitability of Me Job aka oY a
pdipon of the Job site for delivery, Chamber Truss will be mspomlbte for dump delivery only.
The.Duysr Is nns@le for eddltlonaI'd elivery expenses a Chambers Truss hes to retfethror
bemuse Job Ike b not prepard for dlivery or buyer Is not prepared for delivery of trusses.
Suydeb rsponelbI to Chamber Truss for towlnp coat's due to site conditions.
•• t9:1'doe u shwm N pergrph 7 below b sub]acl to ctwnga a any changes ars, metle Rn
Qs,)ayeuL A $60 per hole fee for revisions may be chaNed by Chamber Truax. '
egIto Is a PURCHASE ORDER to Chamber. Truss of the sum agreed to, or If nq
ad a reasonable price. Invoke will be made on dollvery and paid within terms of nal;
ontdekvery, lnvoim msy be made at scheduled date M delivery If buyer cannot accept
ye�Jery'o1 febrimted busses. The underlined agrees to pay Chaniber.Ttuss reasonable
alta mays fee for coaectlone In event of payment not timely made, 11-1@ %. per month service
'charge will be added for as sums not paid within terms. ,
,S; Slgnatur or btitals anywhere on this sheet constitutes agreement to as terms hereln.
:•r,c n eon ily guan ofrantees es payymeambers nt whrust en due o a credit and er loll Indebteaterial dness undersigned
ow d to
uneondars Tru gua he
'phember Truss by arty entity receiving material and Me underlgnad agrees to pay such
indebtedness Including attorneys tees, k default in payment for material be made by are
rodplem• '
10. In the seem of any litigation concerning 016 agreement, the Rams furnished hereunder
lir psymerde retorted to heroin, the, parties agree that are sole venue (or any such action will
�baeakd Node County, Florida.
. ,e".:n..n.w reams nsibiiities are oar-Neaonal Standard And Recommended Guidelines On
1• D
—
)R r: .
ai•-.
-Viiltiple ply trusses must be fastened together per engineering
;;46-i6ro they are set, failure to do so can resultin roof collapse.'
t¢jnporary and permanent bracing are required and can save life
"and property and Is the responslbillty of the truss erector.
ext.;
$fluty the contents of the information packet lytcluded on delivery
i"• before setting trusses.
n.a,rty,
,i,,jrtmfssralattlesetarldbraced p!LdestgnioprevertWtrry&damage.
Trusses must be set plumb and square
Do riot Iset bunks or stack of plywood, roofing material or any
.;,-ether cottoentrated loads on trusses, this can cause Collapse,
: DO NOT SET TRUSSES USING THIS LAYOUT
-$JSE LAYOUT DELIVERED WITH TRUSSES TO SET TRUSSES
:.,,1-.:.CHAMBE1F3%S TRUSS INC -
3105 Oleander Avenue
Fort Plerce; Florida 34982-8423
' 800-551-5932
r' �djt Plates 772.46rt-2012 Fax 772.485-5711
+i, �l�ro Beach 772369.2012 Stuart - 772-2863302
?:ati;w Web Site! CHAMBERSTRUSS.COM
The Ar'hitect's. or Architects re�resenta;3„„
hop drawing approval is NOT a
ouble check" of the contractor.
The ontractor shall remain responsible
for Checking field measurements and
oth r construction criteria. Architect's
a ravel covers general roof shape,
rev of truss strapping, and loading on
$true ure from gr ty and uplift'.•nus and
their roy.ld... 1-.;-Y
Braden & Bra Jen A,t.A. �,A.
W
H
a
c
GARAGE RIGHT
92.0/93.2 MITEK 4.2
dz:
13 TRUSS DRAWINGS
ARE
DESIGN CRITERIA
TO LAYOUT
County
SAINT LUCIE
Building Department
SAINT LUCIE COUNTY
Wind Design Criteria
ASCE 7-2014
Wind Design Method
Main Wind Force Resisting
Roofing Material
Shingle or Shake
0
Loading in PSF
Roof R.D.L.
.9
Top Chord Live
20
20
o
Top Chord Dead
7 4.2
r N
'� I
o I
Bottom Chord Live
10 Non -Concurrent
E
—
Bottom Chord Dead
10 3
cI
`
TOTAL Load
37 7.2
cc
�. l
U)
Duration Factor
1.25
`
Wind Speed
165mph
0
12
Top Chord C.B.
Sheeting by builder.
H
s
Bottom Chord C.B.
Sheeting by builder.
~
Highest Mean Height
14'-0"
Building Type
ENCLOSED
Building Category
II:Non Restrictive
Exposure Category
C
Barrier Island
No
Conforms to FBC 2014
W
H
a
c
GARAGE RIGHT
dz:
13 TRUSS DRAWINGS
ARE
ATTACHED
TO LAYOUT
_%x"a,uau u, rtr wwou -cru l -u- %guiiunuuubi oraOlno
Verify DESIGN CRITERIA shown above with the
building department and your engineer.
Design Criteria is the responsibility of the
Chambers Truss Inc. Drawing Name: Ml 1323
Scale: 1/4 = 1'
72 total trusses, 13 different trusses.
MI 4: SAE ACAD: SAE Reviewed By: Xle lu/y%J—
Date: 04/24/12 Revised: 10/07/15
FOR
WYNNE BUILDING CORP.
DESCRIPTION:
62' GRAND CARLTON III
PAGE 1 of 1 CUSTOMER INITIALS EACH PAGE 3 g6
M 11323 � ae�wk vllf,",_