HomeMy WebLinkAboutPower Relase 10-22-'20 09:57 FROM- 7728787656 T-427 P0003/0004 F-804
R.�1�r>�a�ing:�,;: v�elops�ea�t�erv�ce�
'
i
ii 4J ..
. 64-43
772-446: 21-22 165
p,equesffor 30-F?ay Temorary, Power Release
late; -�� Perfwt NL tuber;
Pr*d Addrew
THE UNPERSIGNED HEREBY REQUEST RELEASE QF F ECTRICAL PLOWER TO THE ABOVE DESCRISED
PROPER"L"Y,FOR A PERIOD LOTTO EXCEtP THIRTY 00)-DAYS,FOR THE PURPOSE OF'TESTINC SYSTEMS
AND EQUIPMENT IN PREPARATIQN FOR A FINAL.3NSPECTION. IN CONSWERATION OF APPROVAL OF THE
REQUEST WE-HEMYACKNOW GE AND AGR*EE"ASFOLLOWS,
1, his•emptirary pow relWe is requested for the al m*led pro se onk and dere will be no
oa:upancy of any type,.other than that permizt�d.by coittruction during this time period.
2. As witness by Our signatures,we hereby agree to abide by all t�:rm arld -conditions of ties agreement,
Including Building Division.Pbiicy,which is inC&P.6rated herein by h ence.
3. All cond"rfrons'and requirements Lis.ed in the attached document en=bd"'Requirements for 30 Day
Power bar T,esbW have'been fulfilled acid the'prernise is ready fnr co!npiiartce inspection.
4. All requests for ao ez€ar&on beyond 30 Hays must be,made in writing to the$u€€ding Official stating
the reason for the request Pointer may be rethoved'from,the site and/or a Stop WorkOrderissued if
the Fina1'Inspection has not been approved within 30 days. A fee of$100.00 will be required to Lift
the Stop Work Order.
WE HEREBY RELEASE AND AGREE TO HOLD HMALESS;Sr..LUCIE COUIff`f,AND THEIR EMPLOYEES FROM
ALL LIABILITIES AND GIAINS OF ANY TYKE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT
OF THIS TRANSACTION,INCLUDING ANY DAMAGE'WHICi 'MAY BE INCUR RED DUE TO THE
j DISCONNECTION OF ELECTRICAL POKIER IN TIg9.MW-,0r-VIOLATION OFTHIS AGREEMENT
ik W_N�R siG: & ~"" DATE'
�1•JJ
=9LT_RACT0FZ,5 DATE
EL.EC IRTtAL d6N_ lZAGTOLt SIGNATURE DATE
I