Loading...
HomeMy WebLinkAboutProposalRIAYES P.O. Box 1114 Vero Beach, FL 32961 Phone 772-226-0061 construction group U g p Inc. brian@hayesgroupinc.com Certified General and Roofing Contractor CGC 1506170, CCC 1329309 PROPOSAL DATE: September 12, 2019 MANAGEMENT CO: Elliott Merrill Community Management / Gene Ross RECEIVED ASSOCIATION: Ocean Harbor North OCT l X P019 JOB NAME: Roof Doors Permitting De St' Curie ePantment SCOPE OF WORK: Remove existing doors and frames. Build curbs, install reinforcing steel, pour curbs, pour landings with light weight concrete. Install wood framing for doors, waterproof openings, install new modified doors, install door hardware, patch stucco, paint doors. This proposal assumes the existing masonry cells around door are filled. All roof work by others. This proposal does not include the door pans. Coordinate with roofer. TOTAL COST FOR TWO (2) DOORS: $16,580.00 ed Q "Additional work not specifically described above will be an additional cost. Any unforeseen conditions found will be documented, priced out and sent to the client. The client will be required to give approval for the additional cost of work before the work will resume. In some cases, it will not be possible to provide pricing for unforeseen conditions, in those cases the work will be done on a COST PLUS basis using the rates below. ** Superintendent Carpenter $60.00 per hour $55.00 per hour General Services $40.00 per hour • Painting • Drywall • Door Repair (not new install) • Stucco Repair Laborer Contractors Fee $35.00 per hour 18% on Invoices 1 [MAYES construction group inc. I accept the proposal amount and conditions as stated on the previous page for the above referenced project. THE ATTACHED TERMS ARE A PART OF THIS PROPOSAL. Manager Signature ss- Print name and title % V � r Date Signed by Manager 2