Loading...
HomeMy WebLinkAboutAPPROVED, IKO SHINGLE Product Approvalgo O i7 PT a 44F xrmG � N �P ± 3 w 3 R am R — � S G a c7 v� v d , .� xY � 3 $ x f 6+ O iv C m G v Fes`. m tin n n q �'�A.m'alM1 m fix. +c. o � � S b q. Z G Q ig a-g pig ti �Q- p g IN 02- t? CONSTRUCTIO" MATERIALS TECHNOLOGiES October 27, 2017 IKO Industries, Ltd 120 Hay Rd. Wilmington, DE 19809 Re: FBC FL7006 Sir(s), PRI Construction Materials Technologies has completed a technical review and attached sealed shingle instructions in compliance the 2017 Florida Building Code This review was completed based on the receipt of fol �g evidence from IKO Industries, Ltd: I ) IKO Shingle Application Instructions — 3-Tab Shingles (EN-3Tab—Appins 8AGXEFS-2012-11 reformatted 2013-02-revO7/13-Florida) 2) IKO Laminated Shingles Application Instructions (EN-Laminated—Appins-8TTEFS-2012-04 reformatted 2013-02-rev07/13-171orida) 3) IKO Hip and Ridge 12 Application Instructions (EN-HipandRidgel2-3HRTri-2013-08—reformatted 20I3-08) 4) IKO Leading Edge Plus Shingle Application Instructions (EN-3LEP-Tit-2012-06—reformatted 2013-03) 5) ASTM D3161 Test Report (FM Approvals Project i o. 3040947) The attached instructions should be used in conjunction with the published manufacturer's application instructions and applicable code. In the -event the instructions conflict, these instructions shall govern. Statement of Independence: PRI Construction Materials Technologies andlor Duc T. Nguyen, FL P-E- do not have nor plan to acquire a financial interest in any company manufacturing or distributing products for which the test reports are issued. Signed: Signed-, Brad Grzyb��Vski Duc T.,,NcJqy Managing Director Florida Regis Te'red�rofessionaj Engineer P.E. Number. 65034 Date*, October 27, 2017 Date: October 27, 2017 Attachments: A) IKO Shingle Application Instructions - 3-Tab B) IKO Laminated Shingles Application. Instructions C) IKO Hip and Ridge 12 Application Instructions D) IKO Leading Edge Plus Application Instructions IKO-187-02-01 Tamps, FL33610 Tel, 813-621-$M FUal$0-5W e-mail; mW1a!stes6ng@pdi:mtcon) IKO Installation Instructions for Asphalt Shingles Page 2 of 5 IKO Shingle Application Instructions — 3-Tab Shingles (ASTM D3161, Class F — IKO Marathon 251AR and CRC Superglass M25AR) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONDUCTION WITH IKO'S PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT, THESE INSTRUCTIONS WILL GOVERN. ' ROOF DECK: Solidly sheathed and fastened deck conforming to 2017 FBC. UNDERLAYMENT: Applied in accordance with building code requirements. For areas where the roof slope is less than 4,' per foot down to Z' per foot, use 2 layers of underlayment conforming to building code requirements, the first sheet overlapping the eave protection by 19", followed by full 36" widths overlapping each preceding course by 19" or other Approved underlayments in accordance with the qualified application instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of underlayment laid parallel to the eaves, with 2" horizontal laps and 4" end laps. Apply metal drip edges on top of any underlay along rake edges and directly to the deck along eaves in accordance with building code requirements. NAILING: Use galvanized (zinc coated) roofing nails, 11 or 12 gauge, with at least 3/8" diameter heads, long enough to penetrate through plywood or 314" into boards. Use 4 nails per shingle placed 6-1/8'above the butt edge, approx. V and 13" from each end and 10above each cutout. Drive nails straight so that nail head is flush with, but not cutting into shingle surface. NAILING ON STEEP SLOPES- For steep slopes of 21" per foot (60*) or more, use 6 nails per shingle placed as shown below. Ensure that no nail is within 2" of a joint/cutout of the underlying shingle. Seal down each shingle at time of application with three 'I" diameter (approx. size and thickness of a quarter) spots of asphalt plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle. Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight. EXPOSURE: Installed shingles shall have a maximum average exposure of 5-5/8". NAILS SEAM St DO NOT NAIL INTO ORAWVE THE SEAUNG STRIP PPJConstruction MatwialsTe(,hrologies,LLC,64l2Sa4efOrive Tampa, R33M Tel:813-1521-5777 ftBIM21-5840 IKO #nstallation Instruct?ons for Asphalt Shingles Page 4 of 5 IKO Hip and Ridge 12 Application Instructions (A-STM D3161, Mass F — IK , Hip and Ridge 12) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKOIS PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT, THESE INSTRUCTIONS WILL GOVERN. Cut hip and ridge shingles into thirds, using the perforation marks as a cutting guide. These shingles are designed for a 51/8" (130 mm) exposure, (For a neater appearance, the top of each side of each piece has been factory trimmed on a I " (25 mm) taper (see drawing). Send each piece over the hip or ridge, and nail 5 518" (143 mm) above the butt edge 1" (25 mm) in from each edge, exposing each piece 51/8'T (130 mm). Apply hip pieces starting at the lower end of the hip, working up toward the ridge. On hip roofs, apply ridge pieces starting at each end, greeting in the middle. On gable roofs, apply ridge pieces starting at the end opposite to the prevailing wind direction and continue to the other end.. Mote: To obtain a three-dimensional effect, (which is recommended, but not required), apply hip and ridge shingles double thickness by stacking 2 piocos on top of one another, she lower piece extending about 314" (19 mm) further than the trap piece (see diagram). The final shingle should be set in cement, and the exposed nail heads of the final shingle should be covered with cement. Prior to application in cold weather, storing the shingles in a heated area will allow for easier bending. NOTE: SHINGLES MUST BE APPLIES? PROPERLY. THEYARE DESIGNED FOR USE AS HIP AND RIDGE SHINGLES ONLY, AND SHOULD NOT BE USED FOR. ANY OTHER APPLICATIONS. WE ASSUME NO RESPONSIBILITY FOR LEAKS CAR DEFECTS RESULTING FROM POOR APPLICATION OR FAILURE 1"0 PROPERLY PREPARE THE SURFACE TO BE ROOFED OVER, OR FAILURE. TO PROVIDE PROPER VENTILATION IN ACCORDANCE WITH MINIMUM PROPERTY STANDARDS REQUIREMENTS. REVIEW ALL APPLICABLE BUILDING CODES, MINIMUM PROPERTY STANDARDS, AND REQUIREMENTS PRIOR TO APPLYING TN -ESE SHINGLES USING THESE APPLICATION INSTRUCTIONS. TFr£ix'N"T PRI £ onstn ckwn Na eriafs Teehnolajt s, t! C. £ i2 Badger i3ri�a Tamps, FL MO T f 873 Ei2i27< tT s a G Sf3 E21<58#D a matt: ma eriai sting ncmt.Cam WebSiia hUp:%%ffj;p4=j;%,, IKO Instailation Instrucilons for Asphalt Shingles Page 5 011 6 111W Leading Edge Plus Application Instructions {ASTM D3161, Class F — IKO Leading Edge Plus) NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKOIS PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN T14E EVENT THE INSTRUCTION CONFLICT, THESE INSTRUCTIONS WILL GOVERN. 1. Apply any underlayment, eave protection, valley flashings, or drip edges to roof deck as required. 2, Each 39 3187'x 131/4" (1000 mm x 336 mm) lK0 Leading Edge Plus strip is perforated lengthwise for separation into two (2) shingles. Take one IKO Leading Edge Plus strip and fold flat at perforation to separate. 3. Take one of the separated shingles 39 3/8" x 6 518" (1000 mm x 168 mm) and remove approximately 29'(500 mm). Install this shingle on the lower left comer of the roof deck, granule side up, with the factory installed sealant adjacent to the eaves. The shingle should overhang the rake edge and eaves by a nominal 114" (6 mm) minimum. Fasten the shingle to the roof deck with nails located 3" to 4" (75 leaf to 100 mm) from the eave edge and 1' (25 mm) in from each and. 4. Take the leftover 20" (500 mm) piece shingle. Rotate the piece and align it vertically up the rake edge with the factory installed sealant adjacent to the outer edge of the roof. The shingle should overhang the rake edge by a nominal 1/4" (6 mm) minimum. Fasten the shingle to the roof deck with fasteners located 3" to 4" (75 mm to 100 mm) from the rake edge and 1" (26 mm) in from each end. 5, Repeat Steps 3 — 4 for the right lower comer of the roof deck, NAILING: Use galvanized (zinc coated) roofing nails, 11 or 12 gauge, with at least 3/8" (9 mm) diameter heads, long enough to penetrate through plywood or 314" (20 mm) into boards. Use 4 nails per shingle placed 3" to 4" (75 mm to 100 mm) from the eave edge and approximately I" and 13" (25 mm and 330 mm) in from each end. 6. Apply full-length JK0 Leading Edge Plus shingles to the remaining eave edges of the roof deck. Install the shingles granule side up with the factory applied sealant adjacent to the eaves. The shingles should overhang the rake edge and eaves by a nominal 1/411(6 mm) minimum. Fasten the shingles to the roof deck with nails located 3" to 4" (75 mm to 100 mm) from the eave edge, 4 nails per shingle. 7. Apply roof shingles as per the instructions printed on each product's package. Make certain the first course of field shingle lies flush with the edges of the fastened JK0 Leading Edge Plus. in this way, the sealant on the IKO Leading Edge Plus shingles will adhere to the first -course field shingles and help keep them from lifting in high Winds. Tampa, 1`03610 lfel-81S-621,5M Fa'813421-SW Web$rwrhqrAww#cmtcorn AI nprovalt FINI Approvals 1151 Boston -Providence Turnpike P.O. Box 9102 Norwood, MA 02062 USA T`781 762 4300 F.- 781762 9375 www.finapprovals.com September 26, 2017 Mr. Donald Shaw IKO Industries, Ltd. 40 Hansen Road South Brampton, Ontario L6W 31-14 Canada Customer ID. 1000000686 Subqect-, IKO Industries LtVs and Canroof Corporation Inc.'s FM Approved asphalt -roof shingles Dear Mr. Shaw, This letter is being written following irl regard& to youi, recent inquire regarding verification of the A STM W-) 161 testing of IKO Industries Ltd's asphalt roof shingles. IKO's fiberglass reinforced asphalt shingles listed below are FM Approved. The test methods originally used are in accordance with ASTM D3161-16 Standard Test Afethod for Wind-Re4istance qf8teep Slope Roofing Products (Fan -Induced Method), IKO Industries Ltd. Cambridge, Cambridge HD, Cambridge AR,--dambridge ArmourZone, Cambridge IR, Cambridge JR ArmourZONE, Dynasty, Dynasty witli AnnourZone, Crowne Slate, Hip & Ridge, Hip & Ridge 12, Hip & Ridge Plus, Marathon Plus, Marathon Plus AR, Marathon !Ultra AP, and Leading Edge Plus Canroof Corporation, Inc. Biltraore, Biltmore HD. Superglass Plus AR, Suporglass Ultra Al I Reggency, (CRC) Hip & Ridge I& and (ILC Plus I fyou havc any questions please do not hesitate to contact me, 'Very truly yours, David L. Alves Senior Engineer - Materials Group FM Approvals 1151 Boston -Providence Turnpike Norwood. , MA 02062 T. 781255 4856 E. &td.a1vesGa,1fmaZMr vals.c CE <FM> Phillip J. Smith., P.E. Operations VP - Principal Engineer FM Approvals FTM Approvals 115 1 Boston-1-3rovidence Turnpike P.O. Box 9102 Norwood, MA 02062 USA September 26,2017 T. 781762 4300 F. 781762 937-5 mww.fmapprovals,com Mr. Donald Shaw IKO Industries, Ltd, 40 Hansen Road South BramPton, Ontario L6W 3H4 Canada Customer ID: 1000000686 Subject: IKO Industries Ltd.'s and Canroof Corporation lac,'s, FM Approved and Specification Tested asphalt roof shingles Dear Mr. Shaw, This letter is being written following in regards to your recent inquire regarding verification of the ASTM E108 testing of IKO industries Ltd,,, asphalt Toofshingles. IKO's fiberglass reinforced asphalt shingles th at are FM Approved and Specification Tested have been examined and listed. The test methods originally used are in accordance within accordance with ASTM E108- I I Skindard Test kfallods.161-Fire Tes,ts qfRoQ1'Coverhzgs. I havee arranged the shingles by category, IKO Industries Ltd, Cambridge, Cambridge HD, Cambridge -AP, Cambridge ArniourZone, Cambridge Tit, Cambridge IR ArmourZONTE. Dyna.%V, Dynasty Nvith ArmourZone, Crowne Slate, Hip & Ridge, Hip & Ridge 12, Hip & I Ridge Plus, Marathon Plus, ,Marathon Plus Ak Marathon Ultra AR, and I Leading Ed-ee Plus Cauroof iCerporation, Inc. Biltmore, Biltmore J4D, Super lass Plus AR, Superglass Ultra AR, Regency, (CPQ l�upItidge 12, and CRC) Kim& Ridge Plus Tested products-, 'lies LtdTroyal estate, � W If you have any questions please do not hesitate to contact me. Very truly yours, David L. Alves Senior Engineer - Materials Group FM Approvals I IS I .Boston -Providence Turnpike Norwood, MA 02062 T: 781255 4856 E. dav d.alves(a4lfmwawats corn C E APPROM 14-01k- elot�l- '—.. Phillip 1, Smith, P.E. Operations VP - Principal Engineer FM Approvals IKO Installation InstrLieffons for Asphalt Shingles Page 3 of 5 1IM'") Laminated Shingles Application Instructions lr%to (ASTM 03161, Class F — Cambridge, Cambridge HQ, and CRC Biltmore AR) NOTE: THESE INSTRUCTIONS WALL BE USED IN CONJUCTION WITH IKOIS PUBLISHED APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION CONFLICT, THESE INSTRUCTIONS WILL GOVERN, ROOF DECK: Solidly sheathed and fastened deck conforming to 2017 F13C. UNDERLAYMENT: Applied in accordance with building code requirements. For areas where the roof slope is less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code requirements, the first sheet overlapping the eave protection by 19', followed by full W widths overlapping each preceding course by I 9'or other Approved underlayments in accordance With the qualified application instructions. For areas where the roof slope is 41' per foot or greater, cover the deck with one ply of underlayment laid parallel to the eaves, with 2" horizontal laps and 4" end laps, Apply metal drip edges on top of any underlay along rake edges and dimotly to the deck along eaves in aucordanco with building code requirements. NAILING, Use galvanized (zinc coated) roofing nails, I I or 12 gauge, with at least 3/8" diameter heads. long enough to penetrate through plywood or 3/4" into boards. Use 4 nails per shingle placed in the nail line 7'-3/8" below the top edge, approx. I" and 13" in from each end. Drive nails straight so that nail head is flush with, but not cutting into shingle surface, NAILING ON STEEP SLOPES. For steep slopes of 21'perfoot (60") or more, use 6 nails per shingle placed as shown below, Ensure that no nail is within 2" of a joint/cutout of the underlying shingle. Seal down each shingle at time of application with three I" diameter (approx. size and thickness of a quarter) spots of asphalt plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle. Apply plastic cement in moderation since excessive amounts may cause blistering. CAUTION: Shingles should sea[ to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the heat of direct sunlight. EXPOSURE: Installed shingles shelf have a maximum average exposure of 5-7/8", + :7 3Vell NAIL LINE -NAtLS NAILING- STEEEP SLOPES APPUCAMON, Use m nails asstlawn r-a- A n ra fl NIF-Wif PROPER APPUCATION REQUIRSS T14AT THE MAU PENETRATE BOTH T4E OVERLAY AND UNDERLAY PORTION$ OFTIrr SHINGLE rAl2Badpr0.!va Tampa,1`0361D Tq:#13Q1,5777 Fax:813-6211-SNO 1MebSUW,1w*w.pr!cmLcom