Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
30 day power release, 10.27.20
T Planning Development Services Building Cdde Re9tilation Division 2300 Vir ginja;Av Foltt fierce, FL 34982 772462-2165 --462-6443 est for 30-Day Tempura rv.pow,er RelIease Date: /O � � ©�C-;1 Permit Number;,,% S ty Proe 1 7-� j ct Address: THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED AND EQUY, FOR A PERIOD OT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPA -ION FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF THE REQUEST WE HEREBY ACK OWLEDGE AND AGREE AS FOLLOW,: 1. This temporary poorer release is requested for the above stated purpose only, and there will be no Occupancy of any t Pe, other than that permitted by construction during this time period. Z• As witness by our signatures, we hereby agree to abide by all terms and conditions of this agreement, Including Building Nislon Policy, which Is incorporated herein by reference. �. All conditions and r quirements listed In the attached document entitled "Requirements for 30 Day Power for Testing" have been Fulfllled and the premise is ready For compliance inspection. 4. All requests for an Oxtension beyond 30 days must be made fn writing to the Building 4fficla! stating the reason for the r�quest, Power may be removed from the site and/or a Stop Work Order issued fF ection has not been approved within 30 days. A Fee of $l0t},pp will be required to lift the Final Insp the Stop Work Order. WE HEREBY RELEASE AND Af;REE TO HOLD HARMLESS, SF. LUCIE COLINTy, AND THEIR EMPLOYEES FROM ALL LIABILITIES AND CLAIMS OF ANY `TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT OF THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE DISCONNECTION OF ELECI"RkCAL POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT 1 4OWNERz�ry DATE J � 2-7 DATE 0 zd Z)?-0