Loading...
HomeMy WebLinkAboutHi-Tide - Aluminum Elevator Angled - 10,000 Lb. Permit Drawing - Thames 9-9-20 (2)ENGINEERING REVIEW. - BOAT LIFT MOUNTING BRACKETS AND SPECIFIED MOUNTING HARDWARE COMPLY WITH WIND LOAD REQUIREMENTS i-- THE 6TH EDITION (2017) FLORIDA BUILDI, CODE, PER ASCE 7-10, AND PER DESI( LOAD REQUIREMENTS OF THE 20 EDITION ALUMINUM ASSOCIATION ALUMINUM DESIGN MANUA MOUNTING BRACKETS INSTALLED P, HI -TIDE INSTRUCTIONS, WILL EXCE ULTIMATE DESIGN WIND SPEED OF 180 M (EXPOSURE CATEGORY C OR BOATS ARE TO BE REMOVED FROM B0, LIFTS PRIOR TO A MAJOR WIND EVEI PILINGS: PILING PENETRATION TO BE 10' INTO THE SAND BOTTOM OR 5' INTO ROCK STRATA, SUB -SURFACE CONDITIONS CAN VARY GREATLY, THE CONTRACTOR SHALL VERIFY ALL PILE CAPACITIES TO COMPLY WITH FBC 2017. ALL PILINGS TO BE 10" MINIMUM DIAMETER 2.5 C.C.A PRESSURE TREA TED WOOD, PRE -STRESSED CONCRETE OR COMPARABLE EQUIVALENT. SEAWALL: THE CONTRACTOR SHALL VERIFY SEAWALL CAPACITIES TO COMPLY W I T H F B C 2 0 1 7. ELECTRICAL REVIEW.- X2 ELECTRI J14 HP ELECTRIC MOTOR 1-112 HP 1 10.8 AMPS @ 115V EACH -- AMPS ( 5.4 AMPS @ 230V EACH 9.6 AMPS c QUANTITY: 2 QUANTITY: TOTAL WATTS. 2484 TOTAL WA Digitally signed by Roger M BABER DN: c=US, o=Sustainable Earth Engineers dba MCR Engineers, o u=A01410D0000017183ADA33 C00001860, cn=Roger M BABER Date: 4, 26A. V01°f°46;4-04'00' o� Ft S °o C E iV S ® oo°oo o O NO.43855 q � o O STATE OF 00 000 < ORI ooO00S 8 o e QO F9 A� ROGER BABER P.E. NO. 43855 MCR PROFESSIONAL ENGINEERING C.A. NO. 26967 1014 NW PINELAKE DR. STUART, FL 34994 PILING MOUNTING MINIMUM (2) 5/8" DIA THREADED ROD PER MOUNT REQUIRED FOR MOUNTING ALTERNATE SEAWALL MOUNTING MINIMUM (2) 5/8" DIA ANCHORS REQUIRED FOR MOUNTING 10, 000 LB. ALUMINUM ELEVATOR & BOATLIFTS AND MARINE PRODUCTS ALUMINUM ELEVATOR X2 (2017 FBC) �� L 4050 SELVITZ ROAD FORT PIERCE, FL J4981 R. HYDE SCALE: NTS DATE: 4117120 REV. 1 1-800-544-0735 www.hi-tide.com DESCR/PPON