Loading...
HomeMy WebLinkAboutE-one Start Up Sheet 10-28-2020 1-50-53 PMDate: Inspector: Project:Simplex Duplex Triplex Quad Basin: Voltage: Y / N Y / N Y / N Y / N P / G Y / N Y / N Y / N Y / N Y / N V Y / N Y / N Y / N A Y / N Y / N Date:2 YR 3YR 4YRWarranty Duration: Picture #2 (Overall Panel)Picture #3 (Overall Station) Comments: Picture #1 (Serial Number - REQ.) After pump shuts off, test the PTR button. Does it function? Type of problem and action taken Date Resolved Check power supply voltage (must be +/- 10% of rated pump voltage) Pump Station Startup (basin needs enough water to activate alarm) Are all penetrations into panel tight and secure? (Duct Seal) Check pump wires to ground bar for shorts. Any shorts? Turn on alarm circuit breaker. Does alarm work properly? Turn on pump circuit breaker and record AMP draw. Does the alarm and pump shut off properly? Was the EQD kit properly hung and connected? Are all valves in their proper operating position? Is the station properly vented? Is the station installed at the proper height? Does the pump station have an inline check valve / lateral? Does the station have clear access to the lid and panel? Are the power cables run in conduit? What type of power will the unit be started by? (Permanent or Generator) Pre-Startup Check List Does the unit appear to be damage free and properly installed? Any visable problems with the Panel? (Back Penetration, wired properly) 120 / 240 Sentry Advisor Serial Number: Environment One Pump Station Startup Sheet Date ResolvedType of problem and action taken Address: Type of Station: Pump Serial Number(s): WH / DH Customer Name: FJN Inspector:Signature: Signature: 5YR 10/28/2020 Treasure Coast Airport Ft. Pierce, FL, 34946 DH663183; DH667779 3000 Curtis King Blvd Corey Smith 5.4 208 10/28/2020 1:55 PM Corey Smith Notified Brian Witt Superintendents that buckboost needs to be installed Pumps move approximately 13 GPM NA