HomeMy WebLinkAboutSections + Details 2020 10 23 - KleinIOd nails g 4"—
See rake nailing below
5/5" cdx plywood, nailed and glued within 4' of gable
rake overhang. Nails to be IOd ring shanks at 4" o,c,
at edges and ro" o.c, in field.
2x4 ladder blocking at 2'0" o,c, and panel
edges nailed to truss top 8 bot, chords
w/ (2) 16d nails - over entire span
Simpson H4 clips at ladder to truss
too chords - two, I
J
Sc i ssflr truss�'s —
12" rake
match exist,
Gable end sheathed with 1/2" cdx
plywood, nailed at 4" o,c, at all
edges and 12" o,c, in field,
2x2 blocking - anchor to beam
w/ 1/4"x3" lag screws e 12" o.c,
bot, chord to blk'g, w/ 16d ring
shanks m &" o,c,
Simpson L8TA12 flat straps
16" o,c, w/ 10-I0d into
gable end truss d beam,
kxALD)LE
2 x 4 blocking at 4' o,c, and panel edges,
nailed to truss bottom chords w/ (2) 16d nails,
tx4 cross bracing at peak of gable end
to bottom of second truss, and at
ro' o,c, each side of peak, Nail to
each chord w/ (2) I(od nails,
(3) 2xl2 porch beam - see framing plan
frame out to col, width, wrap w/ 1/2"
cdx plywd, and finish per plan
Interior wall
s
See typical wall section for
roof, fascia and soffit details
and notes.
Exterior,,,,
5/5" stucco on p,b, metal lath
on Tyveck vapor -barrier on 1/2"
cdx plywd, sheathing on 2 x 6
studs at Iro" o,c„ R-19 batt
insulation, smooth finish 1/2"
drywall and wood base,
(MATCH EXIST,)
8'211 B,H,
GLG, - —
EXIST,
Exist, concrete slab to be
cut-out 4 removed # new
15" x 15" conc, mono ftg, L
(3) 05 bars cont,
O'011 F,F,
r� A A ��
111011 B,F,F,
-- -—
2' 4" B,F,�
31400e�9Coo
C,t1� li�l l ICI I
12
3,5
(MATCH EXIST,)
-----------------------------
- - - - - - - - - - - - - - - - - - - - - - - - -
f-1
I I
I I
I I
I I
I I
I I
I I
I I
I I
5/6": drywa l l on ceiling
I I
I I
I I
I I
II
New 2xlfp11 2-story
w/ 2x�,'$ w 16" o,c„
w/ R-19: batt insulation
B finleI �h,,I w/ 1/2" drywall
on both, sides,
IOC a 4" O.C. 211 X 4" LADDERS 6
24" O.C.
5/5" CDX PLYWOOD
ATTACH LADDER TO
TRUSS TOP CHORD
W/ 2-16d NAILS a 24"
211 X 4" BLOCKING CENTERED BENEATH
PLYWOOD JOINT,
ATTACH BLOCKING W/ 3- I(od
TOENAILED OR 2- 16d ENDNAILED EACH
END I
-------------------------------------
- - - - - - � — - - - - - - - -
- - - - - - - - � — - - - - - - - - - - -
I„I
I„I
r-1
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
r-1
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
F-7
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
f-I
------- ----------------
-----------
ELEVATOR
c,t111�l11�1 I
211x4'I -
CON'T,
10dNAILS
a
4" O,G,
FLASHING
2x4 BLOCKING BE
LADDERS NAIL W/
2-16d NAILS
2-16dNAILS
a
EACH LADDER
%A4DEE FASCIA
Gable end finised w/ Nardi -plank
siding on 150 felt paper or Tyvsk,
on 1/2" CDX plywood,nailed at fo"
o,c, at all edges and 12" O.c, in field,
12" RAKE
(MATCH EXIST)
(VERIFY)
U2
REMOVE EXIST, ROOF TRUSSES,
GUT -BACK EXIST, FLOOR, 8 GIRGsER
\TRUSSES, ADD NEW MICROLAM BM,
(SEE ROOF 4 FL, FRAMING
PLAN)
viv
f-f-{
I I I
I I
I I
I I
I
I I
I I
I I
I I
I I I
I I I
- - - - - - - - -
I I
I I I
I I
I„I I I
I I I I I I
I I I I I I
I I I I I I
I I
I I
I
CHOP, UPPED WALL TO BM,
SIMPSON LSt,4Iro a EA. VERT,
1D, ANCHOR ; BEAM TO roxO
KN'G (BELOI.t;I);W/ (3)SIMPSON
rAl6 a 32" (BOTH SIDES)
------------ ------
Q u \ - 2I'L3 B.H,
12
12 _ _ _ _ _ 2l'O" SPRING
HT, AT EXT, W,4 E
Drywall ceiling
NEW
M A A-r=tom
51 I I INC-1
3/4'' T4G plywood sheathing on 2x4 wd,
studs boll o,c, on exist, 15"h, floor trusses,
•- -11
HANG EXIST, FLOOR TRUSSES
ON NEW MICROLAM BM, W/ SIMPSON
HU825, SEE FL. FRAMING PLAN
12'011 2ND. F,F�
10'2" B.N,
/(--IG
ROOFING...
Concrete roof tiles over hot mopped 900
granular roofing, over 30" felt paper
tin tagged to 5/5" cdx roof sheathing on
engineered wood roof trusses at 2411o,c,
The first course of roof sheathing at save
should be nailed and glued, and should be
a full 41 width, i
2118 B,N,
I' ro 0,i-4,
NQ
SAVE,,,
Galt', metal drip edge on
Ix2 trim on
2xro r,s, cedar fascia w/ stucco
soffit on high rib mtl, lath
w/ 2" cont, screen vent
(MATCH EXIST.)
5/0" stucco on p,b, metal lath
on Tyveck vapor -barrier on 1/2"
cdx p1pol. sheathing on 2 x (o
studs at 1ro11 o,c„ R-19 batt
insulation, smooth finish 1/2"
drywall and wood base, (MATCH EXIST
Attach upper wall
to girder w/ SIMPSON
MT51ro a 32" o,c,
81211 B.I-I,
/ CLG,
EXIST,
Mark A.
Corson
12
3,5
(MATCH EXIST,)
Digitally
signed by Mark
A Corson
Date:
2020.10.22
16:37:29-04'00'
12
�(�n
ing 12
5/S„
Simpson 6P6 clips at each stud
to dbl, top plate and Simpson strap
at ea, truss ses framing plan
NEW
MASTER
C,IttlAlr..
1/2" gyp, bd. on 2x& studs at I(o"
o,c, w/ 5 1/2" batt insul, (R-19)
3/4" T4G plywd sheath, screwed 8 glued
on 2x wd, blk'g, v l(o" o,c, on exist, 15" fl,
trusses
Exist, 10" deep fl, trusses over
exist, wall
5/5" drywall on ceiling
:•4
�•
Exist, bm, (vsrify)
I
•D
—Exist. S" conc, blk,
exterior garage wall,
i)
121011 2ND, F,F,
NEW - MATCH
EXIST,
I1'S11 TERRACE
(EXIST.)
101211 B,H,
/ CCr_
99�� 9(3H
TYPo WALL Si"'CTHON 314
2-STORY SECTION 'a EXIST, TERRACE
U
U T
o U
ztu
�o>
z
oo
N z
D1 5 o
00cp
4
c9 6 Q
O ul
rn
°'
z�
F-O�
zr
O—
o NO
ni
l0
I0
I0
Q)
67'6 0 c U
0
OU
3 0�
T -6 P P 3
DATE 10/23/20
DRAWN BY: pig me
CHECKED Mc
REVISIONS