Loading...
HomeMy WebLinkAboutBathroom plans F1 shelf footrest new tlla gser oilel to reme existing file to remain Scope of Work: 1-Remove shower tile,fixtures, existing file to remaindures,cabinets and tops rn � 2-Remove noted non-load bearing partitions noted ( � •� 3-Relocate shower valve to accommodate new floor plan 1 and cap drain as necessaty 4-Frame new non-load bearing partitions as noted M_--_- 3 way ^ O 5-Install new lighting fixtures as noted 6-Install new file backer in shower,lower curb and sway :;. °�� •': ::=• °`� C reconfigure shower for seat 7-Install new non-skid file on shower floor A 8-Install new the on shower walls rl.Ll. 9-Install new cabinets as per plans 10-Supply and install new counter tops •� 11-Add new frameless glass above short shower wall O 12-Repair drywall as necessary and paint walls and tall linen GFI ceiling GFI Proposed Floor Plan 27 Smith Master Bath Note: exact layout cannot be determine until plumbing is exposed 11 CLOW toilet shower 3" 2" sink 1_ � sink 211 \o e� Proposed Plumbing Riser N.T.S group 772.546.7669 Proposed Floor Plan design & remodeling Smith Master Bath