Scope of Work:
1-Remove shower tile,fixtures, existing file to remaindures,cabinets and tops rn �
2-Remove noted non-load bearing partitions noted ( � •�
3-Relocate shower valve to accommodate new floor plan 1
and cap drain as necessaty
4-Frame new non-load bearing partitions as noted M_--_- 3 way ^ O
5-Install new lighting fixtures as noted
6-Install new file backer in shower,lower curb and sway :;. °�� •': ::=• °`� C
reconfigure shower for seat
7-Install new non-skid file on shower floor A
8-Install new the on shower walls rl.Ll.
9-Install new cabinets as per plans
10-Supply and install new counter tops •�
11-Add new frameless glass above short shower wall O
12-Repair drywall as necessary and paint walls and tall linen GFI
ceiling GFI
Proposed Floor Plan 27
Smith Master Bath
Note: exact layout cannot
be determine until
plumbing is exposed
11
CLOW
toilet
shower 3"
2"
sink 1_ � sink
211 \o
e�
Proposed Plumbing Riser
N.T.S
group 772.546.7669 Proposed Floor Plan
design & remodeling Smith Master Bath