Loading...
HomeMy WebLinkAboutAmeri gas project infoArneriGas is pleased to offer the following proposal for your Consider PC Chad Hinkle Brian Pearl Customer Name safes Representative 7405 Silver oak dr Fort Pierce Street District Location Port St Lucie 772-633-0740 City, State, Zip Code Telephone Description of work: 500 gallon left front of house line to TWH and house stub. INT gas line to Stove, dryer, BBQ rt ht rear. New construction Quantitv DesCrlDtion Unit Cost TOW 400 Propane 2.23 $892.00 8 Shut off / flex lines 25 S200.00 4 Gas hook up 145 $580.00 45 314 Poly 300$ min will bill by the ft depending on final tank loc) 8 $360.00 1 500 gallon tank 1525 $1,525.00 1 Bury and anchor per code with anode. 985 $985.00 2 transitions 65 $130.00 2 Re ulators 75 $150.00 135 3/4 inch INT gas line 17 $2,295.00 1 st year cell tower access 72 Cell monitor option 200 TAX 7.00% $498.19 Permit $250.00 All prices are exclusive of any applicable taxes, pluming and electrical work TOTAL COS $7,865.19 ALL WORK SHALL BE PERFORMED ACCORDING TO FEDERAL, STATE AND LOCAL REQUiREMEN' WI prices am based on a standard installation. Unforeseen circumstances such as poor Soil condition, premature installation of concrete, landscaping, shestrock etc may result in increased costs. Change orders must be approved prior to installation and are Subject to approval by the authority having jurisdiction. AWgdiQU will not hr.e resagojft for,&MM to unmarked !lines (sorlaMet: water, electric. etc.j. Attachments: 11� 10/21=20 Brian Pearl Accepted by: Date S.ubmitte Cate 9/22f2020 This proposal is valid for 3.0 days from the date submitted.