HomeMy WebLinkAboutAmeri gas project infoArneriGas is pleased to offer the following proposal for your Consider PC
Chad Hinkle Brian Pearl
Customer Name safes Representative
7405 Silver oak dr Fort Pierce
Street District Location
Port St Lucie 772-633-0740
City, State, Zip Code Telephone
Description of work:
500 gallon left front of house line to TWH and house stub. INT gas line to Stove, dryer, BBQ rt ht rear.
New construction
Quantitv DesCrlDtion
Unit Cost TOW
400
Propane
2.23
$892.00
8
Shut off / flex lines
25
S200.00
4
Gas hook up
145
$580.00
45
314 Poly 300$ min will bill by the ft depending on final tank loc)
8
$360.00
1
500 gallon tank
1525
$1,525.00
1
Bury and anchor per code with anode.
985
$985.00
2
transitions
65
$130.00
2
Re ulators
75
$150.00
135
3/4 inch INT gas line
17
$2,295.00
1 st year cell tower access
72
Cell monitor option
200
TAX
7.00%
$498.19
Permit
$250.00
All prices are exclusive of any applicable taxes, pluming and electrical work
TOTAL COS
$7,865.19
ALL WORK SHALL BE PERFORMED ACCORDING TO FEDERAL, STATE AND LOCAL REQUiREMEN'
WI prices am based on a standard installation. Unforeseen circumstances such as poor Soil condition, premature installation of
concrete, landscaping, shestrock etc may result in increased costs. Change orders must be approved prior to installation and are
Subject to approval by the authority having jurisdiction. AWgdiQU will not hr.e resagojft for,&MM to unmarked !lines
(sorlaMet: water, electric. etc.j.
Attachments:
11� 10/21=20 Brian Pearl
Accepted by: Date S.ubmitte Cate 9/22f2020
This proposal is valid for 3.0 days from the date submitted.