Loading...
HomeMy WebLinkAboutEngineering fir PLATFORMNOTE: BALL 8. E IJGS/ PLACED 10' ON CENTER. MARINE GRD.2.5 C.C.A 41-THRU-10T CON=FASTENERS OR ATTACHMENTS SECTIONS ARE THE RESPNIMIM OF THE 2"X6"PT.#1 DECKING OWN Of REM FASTEN W/3" SS.SCREWS W/1/4" THESE A'int "Ll PROPOSED WORK CUT OFF SPACING A'Nill"[0,01RRECTIONS W/2 screws PER 36n-42n STRINGER. ItYiSPECTORS THAT-, jp it -R -IMPROE U i N ALL APPLICABLE. 2"X8" PT.#2.SPACING AT 30umax:DOUBLED OUT SIDE STRINGER W/ 5/8" GALV THRU BOLT W/1 1/2 WASHER AND NUT ON EACH PILING 0 ol 4'+ JOIST 2-X 8- PT- BOLTED W/ 5/8" GALV.BOLT . M-H.W — — — — — — — — - — — — — — — — — — — — -- — — — — — — — — — - — — — — 61 3' SEA FLOOR 71-81 MIN. PENETRATION tl ot-o-as ST.LUCR.CoL-).N--n4,BTA7 'V DTVISION v REVENVIED Fo RCO STRUCTUAL REVIEW AND CERTIFICATION. DA C FL.REG 34398 PLANS JOB OR NO INSPECTION WML BE NLkDE. a DESIGN STEVEN G WOOD PE keber DRAW PROFESSIONAL ENGINEER # 34398 CHECKED 950 SULTAN Dp-Tvz JENSEW DATE PORT ST.LUCIE,'FL 34953 Vv .W . B _NSTAI - NEW 1011X 20'� DOCK STRUCTUREW INSTALL i DOCK LADDER CANAL 2. t i i 20 ' t 51 fit— i i t Rim i ! i 10' i t i t i t t t i • I - t i i EXISTING.SEAWALL &MHW t t � i I ; . UPLAND AREA P/L PSL 35' FBC 2014 5T8 ADD_ WnW PROTOCOL t r� CONSTRUCTION= TdOOD EItAlIE rSTRIICTQRE OPEN �TK . REVIEW WIND SPEED z 3 SSCr1�5T►j�711 L4arR� ����� IMPORTANCE FACTOR rI EXPQSUR£� � �r ION IMPORTANCE FLOOR a`s;4O PSF{LIVE I1AD� r °`"7 EL.RSG 34398k)e--/-, id"PSF DEAD LOAD ec►rsrON nlNs: " /✓ DESIGNREBERT S'TLVEN .G WOOD, PE DRAWN PROFESSIONAL ENGINEER # 34398 �• NETTLS�BI.VD ;� 950 CHECRSD SULTAN DRIVE JENSEN BSS ;FL 3495 PARR' ST:�,FL 34953f