Loading...
HomeMy WebLinkAboutTermite Treatment St tucle County Inspections- 2300 Virginia Avenue ' �:•, Y+t.Pierce, FL 34982 OR (772) 462-2172 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TRrATME,NT PE]RIYIIT ilZ JOB ADDIt1✓SS �� f2��r� )r • f. BUILDr1 R & F Pest ContrcY1.-, Inc PEST CONTROL CONTRACTOR 1856 SW Bayyshore, Blvd Port St Lucie, FL 34984 PEST CONTROL,LICENSE We, the ondersigned, hereby certify that we have pretreated the above-described construction for siibterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: Chemicals used.-. Percentage of solution: t �� Total gallons used: Date of treatment: Time of Treatment: Cl Footing ❑ Treatment FBC104.2.6 Certificate of Profecllve Treafnient for prevention of lermifes. Re-treat-eat ' A ii,ealher resisfant jobsile posling boai-tl sl)all be provifled to receive duplicate Treatment Certificates as each required protective n•eaunent Is Slab eompleted,providing a copy for the person the permU is issued to and another copy for the bifilding permit files, The Treatment Certificate shall ❑ lst Trellmer►t pro provide the duct used, identi 1 � ty'of the applicator, time and date of the ❑ Re-treat - freatn,ent, site location, area treated, chendedl used,percent con cell frafion and dumber of gallons used, to establish n verifiable record of prote ❑ D C1V eW active trea)rnenl.,l f the soil chemical barrier method for termile prevention is used, ❑ 1 SL'TTaatmerit final eclerior treatment shall be completed prior to final building approval. ❑ Re-treat' St I.ncie County requires for the final inspection for CO,a Permanent ❑ PoolS Sticker to be placed on the electrical panel box cover,listing all the treatments and dates of appliba'iions. ❑ 1st Treatment ❑ Re-treat ❑ Other ❑ 1st Treatment Q 'Re-ti-eat ❑ Perimeter -for Final Inspecl:ion Sib ature of exterminator NO TB: Tlfei-e ninst be a coinpleted forst for each required treatment or re-treatncent and this form innst be on the job site to be picked rap by the inspector at time of each hispectioii or the scheduled itispee iout hill . fail and a re-inspe.etiotl fee charged. 02/21/2017 20:08 770 JMGM PAGE 01 EC r-- EIVE-01 ` FEB 2 2 2017 2300 Virginia Ave ----,... Fort Pierce, FL 34982 772-462-2172 Fax'772-462-6443 ER.TIFICATE OF TERMITE TREATMENT CONSTRU ION SOIL TREATMENT. PERM" #; 177 D �`�c SOB.ADDRESS: x'17 i tilei v - +r`a BUILDER/CONT CTOR: ~- PEST CONTROL CONTRACTOR: PEST CONTROL LICENSE #; a We, the undersigned, iereby certify that we have pretreated the above described construction for subterranean termites in accordance with thi a standards of the National Pest Control Association, - Square feet if area.tre; ted: Chemicals used. '.4&5 ice_ Percentage of,solution .��/, - Total gallons used: 3. (P r Date of Treatment, /7 Time of Treatment; Footing Slab iSt Treatr ient V Treatment -R&Treat --Re-Treat DrivewayPools Treat ent -P Treatment' _Re•-Treat - t Other erimete for inspection 15t Treat ent -Re-Treat Signatu a rminator Note.i There must be a c mpleted form for each Y equl ed treatment or re-treatment and this form must be on d1e job site to be picked up by the inspector at time of e h inspection or the scheduled inspection wAl fail and a re inspectfor• fee Charged. FB+C104.2.6 Cenit/Cate o Protective Treatment rPrevention oftermitm A weather resistant fobsite posting board shall be provided to recei duplicate Treatment ert117cates as each required protectfile treatment is completed providing a copy for the Mn the permit is issu d to and another copy for the building permit files The Treatment cert�cate shall provide t product used, Identityof the applicator, time and date of Me treatment, site location, area treated, chemlml used, rcent concentratlon an number'of gallons used, to establish a verli7able record of pft ective treatment. If t e sort chemical barrier athod for termite prevent/on is used, final exterlor treatment shall be completed prior to Fna bu!/ding approval, St Lucie County requ res for the final iris 3ection for CO, a Permanent-Sticker to be placed on the electrical p.2zRel all tha treatments and dater of agplicatibna.