Loading...
HomeMy WebLinkAboutPermit renewal ReqPLANNING AND DEVELOPMENT SERVICES DEPARTMENT BUILDING AND CODE REGULATIONS DIVISION zRT IER(EL\,349 — FORT PIt:R F. FL2)452 82 pR)J62-1553 Faa (]]'-)J62-157a PERMIT RENEWAL REQUEST PERMIT NUMBER: 2001-0263 ADDRESS: 0 Slash Pine Trail 1 Cheyenne Ellison am requesting that the above permit be renewed. I understand that I must schedule and pass all required inspections for the permit to be finaled. Further, 1 understand that this is a ONE TIME RENEWAL and the permit shall expire should I not receive a passing inspection during any six month period during the renewal period. Justification Job not started yet Cjge 11 /3/20 OW NER/B05ROR CO�iT AIR SIGMTClRE f Cheyenne Ellison SLATE OF FLORIDA COUNTY OF. — ACKNOWLEDGED BEFORE METHIS 3 DAYOF November 2020 By Cheyenne Ellison WHO IS PERSONALLY KNOWN TO ME x .OR I IAS PROVIDED AS IDENTIFICATION. of rL'a anty of Martin NvNry I blm SWW d I'ViCa Desiree N .. Go 2 QF" My Cammismw CG 083399 SIGNATU ' N i R SEAL EXPIes'2e' 22 an FOR OFFICE USE ONLY: Number of Open Inspections: Total Inspections: (Divide open by total to get %ofopen inspections) Percentage: Original permit fee: x %open = S Renewal fee Example: [15 divided by'_3=.65(%)] $175(permit fee)x.65=SI 13.75(reneaval fee) R 1v 7121C0I4