HomeMy WebLinkAboutSite Development Permitm.�, .
DEPARTMENT
July 10, 2019
ST. LUCIE COUNTY
BOARD OF COUNTY
Stephen Cooper, P. E. & Associates, Inc.
COMMISSIONERS
7450 S. Federal Highway
Port St. Lucie, FL 34952
LINDA BARTZ
CHAIR
Attention: Mr. Stephen Cooper, P.E.
p p
DISTRICT 3
Subject: Site Development Permit
Orange Avenue RV Storage
CATHY TOWNSEND
VICE-CHAIRMAN
DISTRICT 5
The Construction Plans signed and sealed June 25th, 2019, are accepted for
construction of the site improvements as proposed.
CHRIS DZADOVSKY
DISTRICT 1
Construction of site improvements is conditioned on the following:
1. Prior to commencement of any construction of site improvements or
access, the EOR shall coordinate a pre -construction meeting including the
SEAN MITCHELL
St. Lucie County Public Works [Robert Krip, 772-519-0440,
DISTRICT 2
KripR@stlucieco.org] representative.
2. A set of plans stamped as accepted by the County, together with all other
FRANNIE HUTCHINSON
applicable permits shall be on site at all times during construction.
DISTRICT 4
3. Prior to commencement of work, all other agency permits must be obtained
and followed. The more stringent condition of common or conflicting
HOWARD TIPTON
conditions shall be met. Discrepancies within the plans shall be
COUNTY ADMINISTRATOR
appropriately addressed and does not relieve the contractor of his
obligation to construct according to local, state and federal rules and
regulations.
DAN MCINTYRE
4. Site inspections shall be coordinated as established at the Pre -Construction
COUNTY ATTORNEY
meeting. Inspections shall be performed at a minimum for the following
stages:
MAILING ADDRESS
A. Delivery of pipe and structures prior to installation
2300 VIRGINIA AVENUE
B. SW structure installations and backfill
FORT PIERCE, FL 34982
C. Subgrade compaction testing and stringline
D. Base compaction and stringline
PHONE
E. Asphalt/paving
(772) 462-1707
5. Any proposed changes to the permitted stamped plans must be approved
by the County prior to initiating any change in construction. This includes
TDD
material changes such as pavement type, type of drainage pipe, etc.
(772) 462-1428
6. Any structure shown or not shown on the plans (such as walls, gates, signs,
columns, etc.) requiring a building permit, such permit shall be obtained
FAX
prior to initiating construction on such structures. This permit does not
(772) 462-2362
authorize the construction of above ground structures.
E-MAIL
HAYSD@STLUCIECO.ORG
WEBSITE
WWW.STLUCIECO.GOV
ST. LUCIE
July 10, 2019
Mr. Stephen Cooper, P.E.
Orange Avenue RV Storage
8. An As -Built survey is required along the EOR's certification upon request for a final inspection of the
site and access improvements. A published benchmark utilized for site elevations shall be referenced
for usen by other parties, including but not limited to the County.
This permit shall expire as conditioned by the Development Order.
Please do not hesitate to contact me at (772) 462-2741 if you have any questions.
Sincerely,
Grant Chambers, P.E.
Civil Engineer
cc: Patrick Dayan, P.E.
David Hays, P.E.
Robert Krip
Kori Benton, AICP
Monica Graziani