Loading...
HomeMy WebLinkAboutShed Permit InstructionsSouth Country Sheds LLC 203 S. Manatee Ave f r� Ph 863 401 8700'fax 863 866 7272 Email: ojp.scs@gmaii.com South CountrySheds.Com SHED PERMIT INSTRUCTIONS • You as the Customer apply .for your permit as OWNER BUILDER. South County Sheds is not a contractor; we are a shed manufacturer. The only mention of South Country Sheds should be placement of a South Country Sheds shed. • You are getting a permit for placement and anchoring of a DBPR (DCA) approved shed which means Florida State approved. o We provide you with state approved plans to submit to your building department. • , You will need a photo copy of your survey or some kind of site plan showing where the storage shed is to be placed on your property. Building departments and zoning departments are interested in setbacks from property lines, easements etc. At times they are concerned about setbacks from existing structures or homes. • In Collier County you must check whether you are in a flood zone. If you are in a flood zone, your. shed will require flood vents - and treated wall studs. • Check with your city or county building department for, details and information. This page is intended for information only and is not all inclusive.