June 11, 2014
VIA HAND DELIVERY
St. Lucie County Building Dept.
Attn: Lydia Galbraith
2300 Virginia Ave
Fort Pierce, FL 34982
RE: Savanna Club - BP 1405-0345
Dear Lydia:
We received the staff comments for the above referenced project dated 5-28-14. Please except this letter as our
formal response for the staff comments indicated below. The responses will be in bold text following the
comment.
Zoning Review:
The proposed finished floor elevation is required to be 18" above the crown of the road. The site plan
doesn't indicate the elevation of the crown of the road. Please provide (3) boundary surveys indicated
elevation at the location and the elevation of the crown of the road.
Response: Acknowledged. Please find attached (3) copies of the boundary survey indicating the
elevation for the crown of road and the overall site. The proposed FFE is a minimum of 18" above
the crown of road as required.
Please provide a signed and sealed set of civil drawings for our engineering department to review.
(Constructability Review)
Response: Acknowledged. Please find attached one additional set of our site plan, landscape plan
and civil engineering plan published as a complete plan set by McCarty & Associates.
Please provide a copy of the modification of South Florida Water Management District. For information,
call Mike Halter at: 772-462-2719
Response: The SFWMD has recently changed the thresholds for permit modifications. The subject
property does not require an ERP Mod due to the following Florida Statute. A final certification
will be submit to the district upon construction completion.
Section 403.814(12) of the Florida Statutes grants general permits for the construction, alteration and
maintenance of a stormwater management system serving a project that involves qualifying activities in
uplands having less than 10 acres of total project area and less than two acres of impervious surface.
This general permit requires submittal of an "electronic self -certification" within 30 days after
construction begins
i
If you have any questions or require any additional materials please do not hesitate to call.. We thank you for your
review on this project and look forward to working with you.
Very truly yours,
McCarty & Associates
Michael T. McCarty
Principal
Mike@McCartyLandPlanning.com