HomeMy WebLinkAboutEnergy Codez , - ----
t ;, r ;o • } rx rv• +F ,.,. a -,-... ,� .
Florida Energy E,fflclency :Code Fofr.Building Construction
EnergyGauge Summit Fla/Corn 2010, Effectlue Date March15;2012 - Forms 5�06-2010
Total Building Performance Metfod for Commercial Buildings
Short Desc: Savanna Club
Owner: Savanna Club
PROJECT SUMMARY
Description: Savanna Club
Addressl: 3492 Crabapple Drive City: Port St. Lucie
Address2: State: FL
Zip: 0
Type: Town Hall Class: New Finished building
Jurisdiction: PORT ST LUCIE, ST LUCIE COUNTY, FL (661200)
Conditioned Area: 14000 SF Conditioned & UnConditioned Area: 14000 SF
4/24/2014
No of Stories: 1
Permit No: 0
Area entered from Plans 0 SF
Max Tonnage 7.5
If different, write in:
q"It ItIIIgoRo"
J
♦ r P
eeee�\G J V 0,0�®®ai
mew�b
• 82O
` yJP-----AA-TT1E F Yl � •��A
..
i
SOT � ql`^�/'P •� �i4
O N A' 4
®°a0#86111111"%%
EnergyGauge Summit® Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012
Pagel of 8
1 s -" l
Compliance Summa
Component
Gross Energy Cost (in $)
LIGHTING CONTROLS
EXTERNAL LIGHTING
HVAC SYSTEM
PLANT
WATER HEATING SYSTEMS
PIPING SYSTEMS
Met all required compliance from Check List?
Design
11,579.0
Criteria Result
12,099.0 PASSED
PASSES
PASSES
PASSES
None Entered
PASSES
None Entered
Yes/No/NA
IMPORTANT MESSAGE
Info 5009 -- -- -- An input report of this design building must be submitted along with this
Compliance Report
EnergyGauge Summit@ Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012
4/24/2014 Page 2 of 8
, ` V.
CERTIFICATIONS
I hereby certify that the plans and specifications covered by this calculation are in compliance with the
Florida Energy Code
Prepared By: Eric J Svoboda, �P/ffE Building Official:
l Date: V"2 -1_q Date:
I certify that this building is in compliance with the FLorida Energy Efficiency Code
Owner Agent:
Date:
If Required by Florida law, I hereby certify (*) that the system design is in compliance with the Florida
Energy Efficiency Code
Architect: Reg No:
Electrical Designer: Reg No:
Lighting Designer: Reg No:
Mechanical Designer: Reg No:
Plumbing Designer: Reg No:
(*) Signature is required where Florida Law requires design to be performed by registered design
professionals.
+ EnergyGauge Summit® Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012
4/24/2014 Page 3 of 8
R
Project: Savanna Club
Title: Savanna Club
Type: Town Hall
(WEA File: FL ST LUCIE CO
Total
Building End Uses
1) Proposed 2) Baseline
740.10 961.20
$11,579 $15,123
ELECTRICITY(MBtu/kWh!$)
740.10
961.20
216827
281623
$11,579
$15,123
AREA LIGHTS
141.90
190.20
41565
55737
$2,220
$2,993
MISC EQUIPMT
210.00
210.00
61531
61531
$3,286
$3,304
•
PUMPS & MISC
0.10
0.10
•
19
22
-
$1
$1
•
SPACE COOL
.308.90
318.20
•
90500
93230
$4,833
$5,006
SPACE HEAT
3.70
15.60
1098
4568
$59
$245
VENT FANS.
75.50
227.10
22114
66535
$1,181
$3,573
Credits Applied: None
PASSES
Passing Criteria =12099
Design (including any credits) =11579
Passing requires Proposed Building cost to be at most
80% of
Baseline cost. This Proposed Building is at 76.6%
EnergyGauge Summit® Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012
4/24/2014 Page 4 of 8
Project: Savanna Club
Title: Savanna Club
Type: Town Hall
(WEA File: FL_ST_LUCIE_CO_INTL.tm3)
External Lighting Compliance -
Description Category Tradable? Allowance Area or Length ELPA CLP
(W/Unit) or No. of Units (W) (W)
(Sgft or ft)
Ext Light 1 Building facades (by linear foot) No 5.00 160.0 800 648
Tradable Surfaces: 0 (W) Allowance for Tradable: 702 (W) PASSES
All External Lighting: 648 (V)
Complicance check includes a excess/Base allowance of 750.00(W)
Ext Light 1-- 48W from the excess/Base allowance was applied to this
item to comply
Project: Savanna Club
Title: Savanna Club
Type: Town Hall
(WEA File: FL ST LUCIE CO INTL.tm3)
Lighting Controls Compliance
Acronym Ashrae
Description Area Design Min Compli-
ID
(sq.ft) CP CP ance
PrOZo 1 Sp 1 15
Conference/meeting (Multiple 14,000 20 2 PASSES
Functions)
PASSES
4/24/2014
EnergyGauge Summit® Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012
Page 5 of 8
Project: Savanna Club
Title: Savanna Club
Type: Town Hall
(WEA File: FL_ST_LUCIE_CO_INTL.tm3)
System Report Compliance
PrOSyl System 1
Constant Volume Air Cooled No. of Units
Split System < 65000 Btu/hr 1
Component
Category
Capacity Design
Eff Design IPLV Comp-
Eff
Criteria IPLV Criteria liance
Cooling System
Air Conditioners Air Cooled
15.00
12.23 8.00 PASSES
Split System < 65000 Btu/h
Cooling Capacity
Heating System
Electric Furnace
1.00
1.00 PASSES
Air Handling
Air Handler (Supply) -
0.39
0.82 PASSES
System -Supply
Constant Volume
Air Distribution
ADS System (Sup)
6.00
4.20 PASSES
System (Sup)
Air Distribution
ADS System (Ret)
6.00
PASSES
System (Ret)
PrOSy2 System 2
Constant Volume Packaged No. of Units
System 4
Component
Category
Capacity Design
Eff Design IPLV Comp-
Eff
Criteria IPLV Criteria liance
Cooling System
Air Conditioners Air Cooled
11.20
11.20 11.50 11.40 PASSES
65000 to 135000 Btu/h
Cooling Capacity
Heating System
Electric Furnace.
1.00
1.00 PASSES
Air Handling
Air Handler (Supply) -
0.41
0.82 PASSES
System -Supply
Constant Volume
Air Distribution
ADS System (Sup)
6.00
4.20 PASSES
System (Sup)
Air Distribution
ADS System (Ret)
6.00
PASSES
System (Ret)
PASSES
Plant Compliance
Description
Installed Size Design
Min Design
Min Category Comp
No Eff
Eff IPLV
IPLV liance
None
4/24/2014
EnergyGauge Summit® Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012
Page 6 of 8
Project: Savanna Club
Title: Savanna Club
Type: Town Hall
(WEA File: FL_ST_LUCIE_CO_INTL.tm3)
Water Heater Compliance
Description Type
Category Design Min
Eff Eff
Design Max Comp
Loss Loss liance
Water Heater 1 Gas Instantaneous >50,000 & < 0.90 0.62
water heater 200000 Btu/h; >_
4000 (Btu/h)/gal
and < 2 gal
PASSES
PASSES
Piping System Compliance
Category
Pipe Dia Is Operating Ins Cond Ins Req Ins Compliance
[inches] Runout? Temp [Btu-in/hr Thick [in] Thick [in]
[F] .SF.F]
None
4/24/2014
EnergyGauge Summit® Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012
Page 7 of 8
Project: Savanna Club
Title: Savanna Club
Type: Town Hall
(WEA File: FL_ST_LUCIE_C0_INTL.tm3)
Other Required Compliance
Category
Section
Requirement (write N/A in box if not applicable)
Check
Report
506.4.2
Input Report Print -Out from EnergyGauge F1aCom attached
Operations Manual
303.3.1,
Operations manual provided to owner
503.2.9.3,
505.7.4.2
Windows & Doors
502.3.2
Glazed swinging entrance & revolving doors: max. 1.0 cfin/ft2; all
other products: 0.3 cfin/ft2
Joints/Cracks
502.3.3
To be caulked, gasketed, weather-stripped or otherwise sealed
Dropped Ceiling
502.3
Vented: seal & insulated ceiling. Unvented seal & insulate roof &
Cavity
side walls
HVAC Efficiency
503.2.3
Minimum efficiencies: Tables 503.2.3(1)-(8)
HVAC Controls
503.2.4
Zone controls prevent reheat (exceptions); separate thermostatic
control per zone;
Ventilation
503.2.5
Outdoor air supply & exhaust ducts shall have dampers that
automatically shut when systems or spaces served are not in use.
Exhaust air energy recovery required for cooling systems
(Exceptions).
ADS
503.2.7.5
Duct sizing and Design have been performed
HVAC Ducts
503.2.7
Air ducts, fittings, mechanical equipment & plenum chambers
shall be mechanically attached, sealed, insulated & installed per
Table 503.2.7.2. Fan power limitations.
Balancing
503.2.9.1
HVAC distribution system(s) tested & balanced. Report in
construction documents.
Piping Insulation
503.2.8
HAC and service hot water. In accordance with Table 503.2.8.
Water Heaters
504
Performance requirements in accordance with Table 504.2. Heat
trap required.
Swimming Pools
504.7
Vapor -retardant or liquid cover or other means proven to reduce
heat loss on heated pools; Time switch (exceptions); readily
accessible on/off switch.
Motors
505.7.5
Motor efficiency criteria have been met
Lighting Controls
505.2, 502.3
Automatic control required for interior lighting in buildings
>5,000 s.f.; Space control; Exterior photo sensor; Tandom wiring
with 1 or 3 linear fluorescent lamps>30W
EnergyGauge Summit® Fla/Com-2010. Section 506.4 Compliant Software. Effective Date: March 15, 2012
4/24/2014 Page 8 of 8
Project Name: Savanna Club
Project Title: Savanna Club
Address: 3492 Crabapple Drive
State: FL
Zip: 0
Owner: Savanna Club
EnergyGauge Summit® v4.10
INPUT DATA REPORT
Project Information
Orientation: North
Building Type: Town Hall
Building Classification: New Finished building
No.of Stories: 1
GrossArea: 14000 SF
Zones
No Acronym Description Type
Area
[sf]
Multiplier
Total Area
[sf]
1 PrOZo 1 Zone 1 CONDITIONED
14000.0
1
14000.0 ❑
Spaces
No Acronym Description Type Depth
IN
Width Height Multi
IN [ft] plier
Total Area
[sf]
Total Volume
[cq
4/24/2014 EnergyGauge Summit® v4.10 1 '
r 4
Windows
No Description Type
Shaded
U
SHGC
Vis.Tra
W
H (Effec)
Multi
Total Area
[Btu/hr sf F]
IN
[ft]
plier
[sf]
In Zone: PrOZol
In Wall: East
1 PrOZo1Wa2Wil User Defined
No
1.2500
0.82
0.76
4.00
6.00
6
144.0
El
2 PrOZo 1 Wa2Wi2 User Defined
No
1.2500
0.82
0.76
3.00
7.00
2
42.0
In Wall: North
1 PrOZo1Wa1Wi1 User Defined
No
1.2500
0.82.
0.76
4.00
4.00
7
112.0
2 PrOZo1Wa1Wi2 User Defined
No
1.2500
0.82
0.76
3.00
7.00
2
42.0
❑
In Wall: South
1 PrOZo 1 Wa3 Wi 1 User Defined
No
1.2500
0.82
0.76
4.00
4.00
4
64.0
EJ
2 PrOZo 1 Wa3 Wi2 User Defined
No
1.2500
0.82
0.76
3.00
7.00
2
42.0
In Wall: West
1 PrOZol%4Wi1 User Defined
No
1.2500
0.82
0.76
4.00
6.00
10
240.0
2 PrOZo 1 Wa4Wi2 User Defined
No
1.2500
0.82
0.76
3.00
9.00
2
54.0 Ed
Doors
No Description Type
Shaded? Width
H (Effec) Multi
Area
Cond.
Dens. Heat Cap. R-Value
IN
[ft]
plier
[sf] [Btu/hr. sf. F] [lb/ct] [Btu/sf. F] [h.sf.F/Btu]
In Zone: PrOZol
In Wall: North
1 PrOZo1Wa1Dr1 Solid core flush
No
3.00
7.00
6
21.0
0.3504
0.00
0.00 2.85
(2.25)
In Wall: East
1 PrOZo1Wa2Dr1 Solid core flush
No
3.00
7.00
1
21.0
0.3504
0.00
0.00 2.85
(2.25)
In Wall: South
1 PrOZo1Wa3Dr1 Solid core flush
No
3.00
7.00
4
21.0
0.3504
0.00
0.00 2.85
(2.25)
In Wall: West
1 PrOZo1Wa4Drl Solid core flush
No
3.00
7.00
2
21.0
0.3504
0.00
0.00 2.85
(2.25)
4/24/2014 EnergyGaug.P Summit® v4.10
In Zone: PrOZol
1 PrOZo 1 Sp 1 ZoOSp 1
Conference/meeting
140.00
100.00
12.00
1 14000.0
168000.0
❑
(Multiple Functions)
Lighting
No Type
Category
No. of
Watts per
Power
Control Type
No.of
Luminaires
Luminaire
[W]
Ctrl pts
In Zone: PrOZol
In Space: Pr0Zo1Sp1
1 Compact Fluorescent General Lighting
1
13573
13573
Occupancy sensor without 20
Daylighting
Walls
No Description
Type Width H (Effec) Multi
Area DirectionConductance Heat
Dens. R-Value
IN
[ft] plier
[sf]
[Btu/hr. sf. F] Capacity
[lb/ct] [h.sf.F/Btu]
[Btu/sf.F]
In Zone: PrOZol
1 PrOZolWal
5/8" stucco 155.00
12.00 1
1860.0
North
0.2067 5.731
34.65 4.8
❑
/8"CMU/3/4"ISO
BTWN24"oc/.5"
Gyp
2 PrOZo 1Wa2
5/8" stucco 160.00
12.00 1
1920.0
East
0.2067 5.731
34.65 4.8
❑
/8"CMU/3/4"ISO
BTWN24"oc/.5"
Gyp
3 PrOZo 1 Wa3
5/8" stucco 155.00
12.00 1
1860.0
South
0.2067 5.731
34.65 4.8
❑
/8"CMU/3/4"ISO
BTWN24"oc/.5"
Gyp
4 PrOZo 1 Wa4
5/8" stucco 160.00
12.00 1
1920.0
West
0.2067 5.731
34.65 4.8
❑
/8"CMU/3/4"ISO
BTWN24"oc/.5"
Gyp
4/24/2014 EnergyGauge Summit® v4.10 '2
..
Roofs
No Description
Type
Width H (Effec) Multi
Area
Tilt Cond. Heat Cap
Dens. R-Value
[ft] [ft] plier
[sf]
[deg] [Btu/hr. SE F] [Btu/sf. F]
[lb/cf] [h.sf.F/Btu]
In Zone: PrOZol
1 PrOZoIRfl
Mtl Bldg Roof/R-30
140.00 100.00 1 14000.0
0.00 0.0330 1.44
7.09 30.3
❑
Batt
Skylights
No Description Type
U SHGC Vis.Trans
W H (Effec) Multiplier
Area Total Area
[Btu/hr sf F]
[ft] [ft]
[Sf] [Sf]
In Zone:
In Roof:
El
Floors
No Description
Type
Width H (Effec) Multi
Area
Cond. Heat Cap. Dens.
R-Value
[ft] [ft] plier
[sf]
[Btu/hr. sf. F] [Btu/sf. F1 [lb/cf]
[h.sf.F/Btu]
In Zone: PrOZol
1 PrOZo I Fl1
1 ft. soil, concrete
140.00 100.00 1
14000.0
0.2681 34.00 113.33
3.73
❑
floor, carpet and
rubber pad
Systems
PrOSyl System 1 Constant Volume Air Cooled Split No. Of Units 1
System < 65000 Btu/hr
Component Category Capacity Efficiency IPLV
1 Cooling System 48000.00 15.00 8.00 ❑
4/24/2014 EnergyGaug.Q Summit@ v4.10
2 Heating System
3 Air Handling System -Supply
4 Air Distribution System (Sup)
5 Air Distribution System (Ret)
20000.00
1400.00
1.00
0.39
6.00
6.00
ID
El
PrOSy2 System 2
Constant Volume Packaged System No. Of Units 4
Component Category
Capacity
Efficiency IPLV
1 Cooling System
2 Heating System
3 Air Handling System -Supply
4 Air Distribution System (Sup)
5 Air Distribution System (Ret)
90000.00
41000.00
2700.00
11.20 11.50
1.00
0.41
6.00
6.00
El
ID
Plant
Equipment
Category Size
Inst.No Eff. IPLV
17
Water Heaters
W-Heater Description
Capacit3Cap.Unit UP Rt.
Efficiency Loss
1 Gas Instantaneous water heater
1 [Gal] 199000 [Btu/h]
0.9000 [Ef/Et] [Btu/h]
El
1� 4/24/2014 EnergyGauge Summit® v4.10
Piping
No Type Operating Insulation Nomonal pipe Insulation Is Runout?
Temperature Conductivity Diameter Thickness
[F] [ Btu-in/h.sf.F] [in] [in]
El
Fenestration Used
Name Glass Type No. of Glass SHGC VLT
Panes Conductance
[Btu/h.sf.F]
ASHULSglC1rA1 User Defined 1 1.2500 0.8200 0.7600 ❑
IFrm
Materials Used
Mat No
Acronym
Description
Only R-Value
Used
RValue
[h.sf.F/Btu]
Thickness
IN
Conductivity
[Btu/h.ft.F]
Density
[lb/cf]
SpecificHeat
[Btu/lb.F]
187
at
o
BOARD,1/2IN
178
Mat1178
CARPET W/RUBBER PAD
Yes
1.2300
❑
265
Mat1265
Soil, 1 ft
No
2.0000
1.0000
0.5000
100.00
0.2000
0
48
Mat148
6 in. Heavyweight concrete
No
0.5000
0.5000
1.0000
140.00
0.2000
❑
268
Mat1268
0.625" stucco
No
0.1302
0.0521
0.4000
16.00
0.2000
❑
42
Mat142
8 in. Lightweight concrete
No
2.0212
0.6670
0.3300
38.00
0.2000
❑
block
269
Mat1269
.75" ISO BTWN24" oc
No
2.2321
0.0625
0.0280
4.19
0.3000
❑
12
Mad 12
3 in. Insulation
No
10.0000
0.2500
0.0250
2.00
0.2000
❑
23
Mat123
6 in. Insulation
No
20.0000
0.5000
0.0250
5.70
0.2000
❑
c-
,�
6
4/24/2014 EnergyGauge Summit® v4.10
94 Mat194 BUILT-UP ROOFING, No 0.3366 0.0313 0.0930 70.00 0.3500
3/81N
Constructs Used
No
Name
Simple
Construct
Massless Conductance Heat Capacity
Construct [Btu/h.sf.F] [Btu/sf.F]
Density
[lb/cf]
RValue
[h.sf.F/Btu]
1011
5/8" stucco /8"CMU/3/4"ISO No
No 0.21
5.73
34.65
4.8
❑
BTWN24"oc/.5"
Gyp
Layer
Material
Material
Thickness
Framing
No.
IN
Factor
1
268
0.625" stucco
0.0521
0.000
❑
2
42
8 in. Lightweight concrete block
0.6670
0.000
❑
3
269
.75" ISO BTWN24" oc
0.0625
0.000
❑
4
187
GYP OR PLAS BOARD,1/21N
0.0417
0.000
❑
No
Name
Simple
Construct
Massless Conductance Heat Capacity
Construct [Btu/b.sf.F] [Btu/sf.F]
Density
[lb/cf]
RValue
[h.sf.F/Btu]
1056
Mtl Bldg Roof/R-30 Batt
No
No 0.03
1.44
7.09
30.3
❑
Layer
Material
Material
Thickness
Framing
No.
IN
Factor
1
94
BUILT-UP ROOFING, 3/81N
0.0313
0.000
❑
2
23
6 in. Insulation
0.5000
0.000
❑
3
12
3 in. Insulation
0.2500
0.000
❑
A
�, 4/24/2014 EnergyGauge Summit® v4.10 7 '
No
Name
Simple
Construct
Massless Conductance Heat Capacity
Construct [Btu/h.sf.F] [Btu/sf.F]
Density
[lb/cf]
RValue
[h.sf.F/Btu]
1057
1 ft. soil, concrete floor, carpet
and rubber No
No 0.27
34.00
113.33
3.7
❑
pad
Layer
Material
Material
Thickness
Framing
No.
[ft]
Factor
1
265
Soil, 1 ft
1.0000
0.000
❑
2
48
6 in. Heavyweight concrete
0.5000
0.000
❑
3
178
CARPET W/RUBBER PAD
0.000
❑
No
Name
Simple
Construct
Massless Conductance Heat Capacity
Construct [Btu/h.sf.F] [Btu/sf F]
Density
[lb/cf]
RValue
[h.sf.F/Btu]
1058
Solid core flush (2.25)
No
Yes 0.35
2.9
❑
Layer
Material
Material
Thickness
Framing
No.
[ft]
Factor
1
279
Solid core flush (2.25")
0.000
❑
4/24/2014 EnergyGaug�e Summit® v4.10 g '